26.04.2014 Views

View - The Municipality of Lambton Shores

View - The Municipality of Lambton Shores

View - The Municipality of Lambton Shores

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Watson & Associates Economists Ltd. 2.<br />

Task #6<br />

Task #7<br />

Report Preparation<br />

Presentations and Meetings<br />

1.1 Assessment <strong>of</strong> Water Consumption Data (Task #1)<br />

• Communicate with <strong>Municipality</strong> personnel to obtain all information required for the project<br />

purpose.<br />

• Review and update historic records on water consumption and sewage flows by system. <strong>The</strong><br />

historic consumption/flows records will be classified by class <strong>of</strong> user to assess consumption<br />

patterns. <strong>The</strong>se classes may be defined as residents (single vs. multi-residential), commercial,<br />

industrial and institutional. Further refinements can be made based on discussions with staff.<br />

• Based on the average consumption patterns for above, the consumption forecast will be updated<br />

using the <strong>Municipality</strong>’s residential and non-residential forecasts resulting from the <strong>Municipality</strong>’s<br />

Development Charge Study or any other approved forecast document. We note that this analysis<br />

must consider the potential for additional existing customers arsing from the Wastewater<br />

Treatment Servicing Plan which would would provide for the timing and number <strong>of</strong> new customers<br />

to be added to the system.<br />

• This forecast will also assist in the review <strong>of</strong> capital needs, possible changes in operating<br />

expenditures and provide a basis for future forecasted rates.<br />

1.2 Capital Needs Assessment (Task #2)<br />

Review with staff and update the capital needs based upon:<br />

<br />

<br />

<br />

Review and update information required for project purposes and aggregate all existing and<br />

future growth capital and renewal/replacement/maintenance/operation items. Prioritize based on<br />

discussions with staff.<br />

Summarize into capital and operating components for existing system replacement needs and<br />

long-term replacement needs on a life cycle cost basis.<br />

Update 10-year plans for each <strong>of</strong> the above and prepare a discussion paper for review with<br />

municipal personnel before proceeding with rate determination activities.<br />

1.3 Capital Cost Financing Options (Task #3)<br />

<br />

<br />

Based on findings <strong>of</strong> Task #2, consider alternatives to debt and/or transfers from operating<br />

budgets. Evaluation would include other statutory authorities such as Development Charges,<br />

Part XII charges under the Municipal Act, development agreements under the Planning Act, local<br />

improvements, regulations, etc.<br />

In addition, we will consider the potential for and applicability to grant funding for capital works<br />

proposed in #2. As well, evolving changes which may arise regarding the Provincial review <strong>of</strong><br />

water and sewer systems in Ontario will also be monitored and considered<br />

213<br />

H:\PROPOSAL\<strong>Lambton</strong> <strong>Shores</strong>\2012 DC W&WW\W & WW\<strong>Lambton</strong> <strong>Shores</strong> 2012 WWW Proposal.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!