26.04.2014 Views

07 Vauxhall Square, item 6. PDF 626 KB - Lambeth Council

07 Vauxhall Square, item 6. PDF 626 KB - Lambeth Council

07 Vauxhall Square, item 6. PDF 626 KB - Lambeth Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

solely for its designated use.<br />

Reason: To ensure adequate cycle parking is available on site and to promote<br />

sustainable modes of transport. (Policies 9 and 14 of <strong>Lambeth</strong>’s Unitary<br />

Development Plan and Policy S4 of <strong>Lambeth</strong>’s Core Strategy).<br />

24. No doors or gates shall be erected in a way that enables them to be opened<br />

over or across the adjoining footways, carriageways and rights of way.<br />

Reason: In the interests of public safety and to prevent obstruction of the public<br />

highway. (Policies 9 and 14 of <strong>Lambeth</strong>’s Unitary Development Plan and Policy<br />

S4 of <strong>Lambeth</strong>’s Core Strategy).<br />

25. At least 4 of the vehicular parking spaces shall be provided with electrical<br />

charging points for electric vehicles.<br />

Reason: To encourage the uptake of electric vehicles in accordance with<br />

London Plan Policy <strong>6.</strong>13.<br />

Water, Drainage and Waste<br />

2<strong>6.</strong> No development above ground (other than demolition) shall commence on<br />

site until such time as impact studies pertaining to the existing water supply<br />

infrastructure have been submitted to and approved in writing by the local<br />

planning authority. The studies should determine the magnitude of any new<br />

additional capacity required in the system, a suitable connection point and<br />

measures for overcoming impact on the water supply infrastructure. The<br />

development shall be implemented in accordance with details approved in<br />

writing by the local planning authority.<br />

Reason: To ensure that the water supply infrastructure has sufficient capacity to<br />

cope with additional demand generated by the development (Policies S2 and<br />

PN2 of <strong>Lambeth</strong>’s Core Strategy).<br />

27. Development shall not commence above ground (other than demolition) until<br />

a drainage strategy, detailing any on and/ or off-site drainage works, has been<br />

submitted to and approved in writing by the local planning authority. The<br />

development shall thereafter be constructed in accordance with the approved<br />

details.<br />

Reason: To ensure that sufficient capacity is made available to cope with the<br />

new development; and in order to avoid adverse environmental impact upon the<br />

community (Policy S6 of <strong>Lambeth</strong>’s Core Strategy).<br />

28. The development hereby permitted shall only be operated in accordance<br />

with a Waste Management Strategy for the relevant part of the development to<br />

be submitted and approved in writing by the local planning authority prior to the<br />

use of the relevant part of the development commencing.<br />

Reason: To ensure that adequate provision is made for the storage of refuse

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!