07 Vauxhall Square, item 6. PDF 626 KB - Lambeth Council
07 Vauxhall Square, item 6. PDF 626 KB - Lambeth Council
07 Vauxhall Square, item 6. PDF 626 KB - Lambeth Council
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
solely for its designated use.<br />
Reason: To ensure adequate cycle parking is available on site and to promote<br />
sustainable modes of transport. (Policies 9 and 14 of <strong>Lambeth</strong>’s Unitary<br />
Development Plan and Policy S4 of <strong>Lambeth</strong>’s Core Strategy).<br />
24. No doors or gates shall be erected in a way that enables them to be opened<br />
over or across the adjoining footways, carriageways and rights of way.<br />
Reason: In the interests of public safety and to prevent obstruction of the public<br />
highway. (Policies 9 and 14 of <strong>Lambeth</strong>’s Unitary Development Plan and Policy<br />
S4 of <strong>Lambeth</strong>’s Core Strategy).<br />
25. At least 4 of the vehicular parking spaces shall be provided with electrical<br />
charging points for electric vehicles.<br />
Reason: To encourage the uptake of electric vehicles in accordance with<br />
London Plan Policy <strong>6.</strong>13.<br />
Water, Drainage and Waste<br />
2<strong>6.</strong> No development above ground (other than demolition) shall commence on<br />
site until such time as impact studies pertaining to the existing water supply<br />
infrastructure have been submitted to and approved in writing by the local<br />
planning authority. The studies should determine the magnitude of any new<br />
additional capacity required in the system, a suitable connection point and<br />
measures for overcoming impact on the water supply infrastructure. The<br />
development shall be implemented in accordance with details approved in<br />
writing by the local planning authority.<br />
Reason: To ensure that the water supply infrastructure has sufficient capacity to<br />
cope with additional demand generated by the development (Policies S2 and<br />
PN2 of <strong>Lambeth</strong>’s Core Strategy).<br />
27. Development shall not commence above ground (other than demolition) until<br />
a drainage strategy, detailing any on and/ or off-site drainage works, has been<br />
submitted to and approved in writing by the local planning authority. The<br />
development shall thereafter be constructed in accordance with the approved<br />
details.<br />
Reason: To ensure that sufficient capacity is made available to cope with the<br />
new development; and in order to avoid adverse environmental impact upon the<br />
community (Policy S6 of <strong>Lambeth</strong>’s Core Strategy).<br />
28. The development hereby permitted shall only be operated in accordance<br />
with a Waste Management Strategy for the relevant part of the development to<br />
be submitted and approved in writing by the local planning authority prior to the<br />
use of the relevant part of the development commencing.<br />
Reason: To ensure that adequate provision is made for the storage of refuse