the site within the public realm to cater for visitors to the site. This would be<br />

policy compliant in terms of the London Plan. Details have been be secured by<br />

condition to ensure that the provision is indeed acceptable with details of the<br />

specification of the storage and what access controls are in place.<br />

10.19 A TfL Cycle Hire facility would need to be provided as part of the development<br />

and an area of footway is to be safeguarded on Wandsworth Road to<br />

accommodate this. TfL have requested a sum of money to be paid by the<br />

applicant, which would facilitate this provision. This has been agreed and would<br />

secured via the Section 106 Agreement.<br />

10.20 Public Transport<br />

The submitted Transport Assessment assesses the likely demand generated for<br />

local public transport services. TfL have confirmed that the proposed<br />

development would generate a significant demand across all public transport<br />

modes and the development is therefore required to make appropriate financial<br />

contribution towards access and capacity commensurate with the scale of the<br />

development. Officers support this view and financial contributions should be<br />

secured through the relevant means.<br />

10.21 Public Realm<br />

An integral part of the scheme is the creation of a large element of new public<br />

space within the centre of the site currently to be known as ‘<strong>Vauxhall</strong> <strong>Square</strong>’.<br />

Further to this the applicant is proposing to reconstruct the relevant section of<br />

Bondway and Miles Street to create a shared surface, deliver improvements to<br />

the Miles Street railway tunnel and to create a new pedestrian route continuing<br />

southwards from Bondway to link in with Wandsworth Road to be known as<br />

‘New Lane’. In terms of Miles Street it is required that the full length of Miles<br />

Street from its junction with Wandsworth Road through to South <strong>Lambeth</strong> Road<br />

is included in scope of works and not just the length from Wandsworth Road<br />

through to the viaduct.<br />

10.22 Overall it is recognised that, subject to agreement on materials and<br />

specifications, this scheme could offer the significant improvements to the public<br />

realm needed in this area to accommodate both the demands of this scheme<br />

and also the numerous other major developments proposed within the VNEB<br />

area. The scheme also proposes a new formal pedestrian crossing on<br />

Wandsworth Road linking this site to the Linear Park and this is shown on the<br />

proposed plans on a diagonal angle so as to best meet expected desire lines<br />

and alterations are also proposed to the existing formal crossing on Parry Street<br />

from the site to the bus station. The design and location of the proposed<br />

pedestrian crossings, particularly from Wandsworth Road one, are critical to the<br />

acceptability of this scheme and would need to be agreed prior to in-principle<br />

with TfL prior to consent being granted.<br />

10.23 Servicing & Coach Parking<br />

A range of servicing options is proposed to cater for the various uses contained<br />

on the site with large delivery vehicles accommodated off-street within a