07 Vauxhall Square, item 6. PDF 626 KB - Lambeth Council
07 Vauxhall Square, item 6. PDF 626 KB - Lambeth Council
07 Vauxhall Square, item 6. PDF 626 KB - Lambeth Council
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Policy 50<br />
Open Space and Sports Facilities;<br />
<strong>6.</strong>9 Regional Guidance:<br />
• London Plan Housing SPG<br />
• London Plan Providing for Children and Young People’s Play and Informal<br />
Recreation<br />
• London Plan World Heritage Sites SPG<br />
• London Plan London View Management Framework (LVMF) SPG<br />
• London Plan Sustainable Design and Construction SPG<br />
• London Plan Mayoral Community Infrastructure Levy (CIL) SPG<br />
• London Plan Cross-Rail SPG<br />
• London Plan Planning and Access for Disabled People: a good practice<br />
guide (ODPM)<br />
• London Plan the Mayors Ambient Noise Strategy<br />
• London Waterloo Opportunity Planning Framework (OAPF)<br />
• British Research Establishment (BRE) Handbook Site Layout Planning for<br />
Daylight and Sunlight 2011: A Guide to Good Practice.<br />
<strong>6.</strong>10 <strong>Vauxhall</strong> Nine Elms Battersea Opportunity Area Policy Framework<br />
(VNEBOAPF):<br />
In March 2012, the Mayor adopted a planning framework for the <strong>Vauxhall</strong> Nine<br />
Elms Battersea Opportunity Area (VNEB). It is Supplementary Planning<br />
Guidance to the London Plan. The framework has been produced in<br />
collaboration with <strong>Lambeth</strong> and Wandsworth <strong>Council</strong>s, as well as TfL and<br />
English Heritage.<br />
The framework sets out an ambition for around 16,000 new homes and a range<br />
of 20,000 - 25,000 jobs. It contains proposals for an extension to the Northern<br />
Line from Kennington to Battersea via Nine Elms; a new linear park connecting<br />
<strong>Vauxhall</strong> to Battersea Power Station; a tall buildings strategy which supports an<br />
emerging cluster at <strong>Vauxhall</strong> within the parameters of the London Views<br />
Management Framework. It promotes the creation of a Combined Cooling and<br />
Heat Power network. Additionally, a Development Infrastructure Funding Study<br />
has been undertaken which informed the advancement of a Section106 tariff to<br />
fund the full range of infrastructure required to support new development in the<br />
Opportunity Area.<br />
Various proposals already have planning permission or are in the planning<br />
process. A Strategy Board, comprising representatives from the GLA, <strong>Lambeth</strong><br />
and Wandsworth <strong>Council</strong>s and other stakeholders, has been established to<br />
guide development in the area.<br />
<strong>6.</strong>11 Local Guidance:<br />
The council has adopted the following Supplementary Planning Documents,<br />
which are relevant:<br />
• SPD: Safer Built Environments