26.04.2014 Views

07 Vauxhall Square, item 6. PDF 626 KB - Lambeth Council

07 Vauxhall Square, item 6. PDF 626 KB - Lambeth Council

07 Vauxhall Square, item 6. PDF 626 KB - Lambeth Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Policy 50<br />

Open Space and Sports Facilities;<br />

<strong>6.</strong>9 Regional Guidance:<br />

• London Plan Housing SPG<br />

• London Plan Providing for Children and Young People’s Play and Informal<br />

Recreation<br />

• London Plan World Heritage Sites SPG<br />

• London Plan London View Management Framework (LVMF) SPG<br />

• London Plan Sustainable Design and Construction SPG<br />

• London Plan Mayoral Community Infrastructure Levy (CIL) SPG<br />

• London Plan Cross-Rail SPG<br />

• London Plan Planning and Access for Disabled People: a good practice<br />

guide (ODPM)<br />

• London Plan the Mayors Ambient Noise Strategy<br />

• London Waterloo Opportunity Planning Framework (OAPF)<br />

• British Research Establishment (BRE) Handbook Site Layout Planning for<br />

Daylight and Sunlight 2011: A Guide to Good Practice.<br />

<strong>6.</strong>10 <strong>Vauxhall</strong> Nine Elms Battersea Opportunity Area Policy Framework<br />

(VNEBOAPF):<br />

In March 2012, the Mayor adopted a planning framework for the <strong>Vauxhall</strong> Nine<br />

Elms Battersea Opportunity Area (VNEB). It is Supplementary Planning<br />

Guidance to the London Plan. The framework has been produced in<br />

collaboration with <strong>Lambeth</strong> and Wandsworth <strong>Council</strong>s, as well as TfL and<br />

English Heritage.<br />

The framework sets out an ambition for around 16,000 new homes and a range<br />

of 20,000 - 25,000 jobs. It contains proposals for an extension to the Northern<br />

Line from Kennington to Battersea via Nine Elms; a new linear park connecting<br />

<strong>Vauxhall</strong> to Battersea Power Station; a tall buildings strategy which supports an<br />

emerging cluster at <strong>Vauxhall</strong> within the parameters of the London Views<br />

Management Framework. It promotes the creation of a Combined Cooling and<br />

Heat Power network. Additionally, a Development Infrastructure Funding Study<br />

has been undertaken which informed the advancement of a Section106 tariff to<br />

fund the full range of infrastructure required to support new development in the<br />

Opportunity Area.<br />

Various proposals already have planning permission or are in the planning<br />

process. A Strategy Board, comprising representatives from the GLA, <strong>Lambeth</strong><br />

and Wandsworth <strong>Council</strong>s and other stakeholders, has been established to<br />

guide development in the area.<br />

<strong>6.</strong>11 Local Guidance:<br />

The council has adopted the following Supplementary Planning Documents,<br />

which are relevant:<br />

• SPD: Safer Built Environments

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!