The London Plan July 2011 – RTF version Scheme Energy-saving initiatives Regenerative braking and automatic train control Description Initially, a programme of trials to include low energy lighting, smart electricity metering at stations and low loss conductor rails To be implemented as an integral part of the Tube upgrade programme Scheme cost L/M Anticipated completion 2010 2013 – – 2012 2020 * † Post 2020 DLR Network-wide capacity upgrade to three-car services Extension: Stratford International to Canning Town Further DLR network enhancements Enabling a 50 per cent increase in capacity To be completed in summer 2010 Potential extensions and/or capacity increases such as Gallions Reach – Dagenham Dock, Bank to Victoria, Stratford International to Walthamstow Central via Leytonstone, Lewisham to Catford/Catford Bridge/Hither Green, Hayes/Beckenham via Catford M M M Tramlink Tramlink further enhancements Potential extensions and/or capacity increases L/M Buses and bus transit East London Transit Bus network development (Phase 1a Ilford – Dagenham Dock to be completed 2010) Phase 1b (Barking to Dagenham Dock via Barking Riverside), services starting in 2013 Regular review of bus network, including reviews of the strategic priorities underlying the process approximately every five years, (linked to programme for review of the London Plan) to cater for population and employment growth, L M Page 174 of 310
The London Plan July 2011 – RTF version Scheme Description maintain ease of use, attractive frequencies and adequate capacity, reliable services, good coverage and good interchange with other modes. This would include possibilities for further East London transit schemes Scheme cost Anticipated completion 2010 2013 – – 2012 2020 * † Post 2020 Low emission buses Bus stop accessibility programme Bus priority Intention that all new buses entering London’s fleet post 2012 be low emission (initially diesel hybrid) Improved accessibility of bus stops Implementation of bus priority measures to maintain service reliability M L M Cycling Central London Cycle Hire scheme Additional cycle parking Cycle Superhighways Around 6,000 bikes for hire in central London, scheme opening in 2010 Around 66,000 additional cycle parking spaces in London Two initial trial radial routes to central London, followed by further routes M L L London Cycle Hire scheme enhancement Cycling initiatives in Outer London town centres Expansion of area covered and/or additional bikes in London Cycle Hire scheme Biking boroughs and potential radial cycle highways, additional parking, cycle hire schemes, etc Walking and urban realm enhancements Enhanced urban realm and pedestrian environment London-wide ‘better streets’ initiatives to improve pedestrian connectivity and urban realm. Such as Brixton Central Square – gyratory removal Exhibition Road – Balanced space scheme Gants Hill – Station Environs Oxford Circus diagonal crossing – improve pedestrian ‘flow’ and urban L L/M M Page 175 of 310
- Page 123 and 124: The London Plan July 2011 - RTF ver
- Page 125 and 126: The London Plan July 2011 - RTF ver
- Page 127 and 128: The London Plan July 2011 - RTF ver
- Page 129 and 130: The London Plan July 2011 - RTF ver
- Page 131 and 132: The London Plan July 2011 - RTF ver
- Page 133 and 134: The London Plan July 2011 - RTF ver
- Page 135 and 136: The London Plan July 2011 - RTF ver
- Page 137 and 138: The London Plan July 2011 - RTF ver
- Page 139 and 140: The London Plan July 2011 - RTF ver
- Page 141 and 142: The London Plan July 2011 - RTF ver
- Page 143 and 144: The London Plan July 2011 - RTF ver
- Page 145 and 146: The London Plan July 2011 - RTF ver
- Page 147 and 148: The London Plan July 2011 - RTF ver
- Page 149 and 150: The London Plan July 2011 - RTF ver
- Page 151 and 152: The London Plan July 2011 - RTF ver
- Page 153 and 154: The London Plan July 2011 - RTF ver
- Page 155 and 156: The London Plan July 2011 - RTF ver
- Page 157 and 158: The London Plan July 2011 - RTF ver
- Page 159 and 160: The London Plan July 2011 - RTF ver
- Page 161 and 162: The London Plan July 2011 - RTF ver
- Page 163 and 164: The London Plan July 2011 - RTF ver
- Page 165 and 166: The London Plan July 2011 - RTF ver
- Page 167 and 168: The London Plan July 2011 - RTF ver
- Page 169 and 170: The London Plan July 2011 - RTF ver
- Page 171 and 172: The London Plan July 2011 - RTF ver
- Page 173: The London Plan July 2011 - RTF ver
- Page 177 and 178: The London Plan July 2011 - RTF ver
- Page 179 and 180: The London Plan July 2011 - RTF ver
- Page 181 and 182: The London Plan July 2011 - RTF ver
- Page 183 and 184: The London Plan July 2011 - RTF ver
- Page 185 and 186: The London Plan July 2011 - RTF ver
- Page 187 and 188: The London Plan July 2011 - RTF ver
- Page 189 and 190: The London Plan July 2011 - RTF ver
- Page 191 and 192: The London Plan July 2011 - RTF ver
- Page 193 and 194: The London Plan July 2011 - RTF ver
- Page 195 and 196: The London Plan July 2011 - RTF ver
- Page 197 and 198: The London Plan July 2011 - RTF ver
- Page 199 and 200: The London Plan July 2011 - RTF ver
- Page 201 and 202: The London Plan July 2011 - RTF ver
- Page 203 and 204: The London Plan July 2011 - RTF ver
- Page 205 and 206: The London Plan July 2011 - RTF ver
- Page 207 and 208: The London Plan July 2011 - RTF ver
- Page 209 and 210: The London Plan July 2011 - RTF ver
- Page 211 and 212: The London Plan July 2011 - RTF ver
- Page 213 and 214: The London Plan July 2011 - RTF ver
- Page 215 and 216: The London Plan July 2011 - RTF ver
- Page 217 and 218: The London Plan July 2011 - RTF ver
- Page 219 and 220: The London Plan July 2011 - RTF ver
- Page 221 and 222: The London Plan July 2011 - RTF ver
- Page 223 and 224: The London Plan July 2011 - RTF ver
The <strong>London</strong> <strong>Plan</strong> July <strong>2011</strong> – RTF version<br />
Scheme<br />
Energy-saving<br />
initiatives<br />
Regenerative<br />
braking and<br />
automatic train<br />
control<br />
Description<br />
Initially, a programme of trials to<br />
include low energy lighting, smart<br />
electricity metering at stations and<br />
low loss conductor rails<br />
To be implemented as an integral part<br />
of the Tube upgrade programme<br />
Scheme<br />
cost<br />
L/M<br />
Anticipated<br />
completion<br />
2010 2013<br />
– –<br />
2012 2020<br />
* †<br />
Post<br />
2020<br />
DLR<br />
Network-wide<br />
capacity<br />
upgrade to<br />
three-car<br />
services<br />
Extension:<br />
Stratford<br />
International to<br />
Canning Town<br />
Further DLR<br />
network<br />
enhancements<br />
Enabling a 50 per cent increase in<br />
capacity<br />
To be completed in summer 2010<br />
Potential extensions and/or capacity<br />
increases such as Gallions Reach –<br />
Dagenham Dock, Bank to Victoria,<br />
Stratford International to<br />
Walthamstow Central via<br />
Leytonstone, Lewisham to<br />
Catford/Catford Bridge/Hither<br />
Green, Hayes/Beckenham via Catford<br />
M<br />
M<br />
M<br />
Tramlink<br />
Tramlink<br />
further<br />
enhancements<br />
Potential extensions and/or capacity<br />
increases<br />
L/M<br />
Buses and bus transit<br />
East <strong>London</strong><br />
Transit<br />
Bus network<br />
development<br />
(Phase 1a Ilford – Dagenham Dock to<br />
be completed 2010)<br />
Phase 1b (Barking to Dagenham Dock<br />
via Barking Riverside), services<br />
starting in 2013<br />
Regular review of bus network,<br />
including reviews of the strategic<br />
priorities underlying the process<br />
approximately every five years,<br />
(linked to programme for review of<br />
the <strong>London</strong> <strong>Plan</strong>) to cater for<br />
population and employment growth,<br />
L<br />
M<br />
Page 174 of 310