London Plan 2011 PDF 1 MB - Lambeth Council
London Plan 2011 PDF 1 MB - Lambeth Council London Plan 2011 PDF 1 MB - Lambeth Council
The London Plan July 2011 – RTF version taken to ensure the needs of street users and improvements to the public realm are co-ordinated. Table 6.1 Indicative list of transport schemes Scheme Rail Crossrail 1 High Speed 1 Description Core scheme: Maidenhead and Heathrow in the west to Shenfield and Abbey Wood in the east International services stopping at Stratford High Speed 1 Enhanced domestic services L High Speed 1 High Speed 2 Improved rail freight terminals to serve London Improved rail freight routes Improved rail freight routes Crossrail 1 Chelsea Hackney line (Crossrail 2) London Overground Direct services to a wider range of European destinations (making use of new European infrastructure) London to the West Midlands and beyond. New and/or expanded rail freight terminals to serve London Rail link from Barking - Gospel Oak line to West Coast Main Line Further capacity enhancement for the Felixstowe - Nuneaton route Westerly extension(s) potentially to Reading/Milton Keynes/ Watford/ Staines (via Airtrack) and/or additional services to Heathrow and West Drayton Easterly extension from Abbey Wood - Gravesend Enhanced southwest – northeast London capacity and connectivity. Scheme detail to be reviewed to ensure maximum benefits and value for money Programme of expansion and enhancement of services, including new orbital services through inner London and new, longer trains by Page 170 of 310 Scheme cost H L L H L M M M H M Anticipated completion 2010 2013 – – 2012 2020 * † Post 2020
The London Plan July 2011 – RTF version Scheme Description 2012 Scheme cost Anticipated completion 2010 2013 – – 2012 2020 * † Post 2020 London Overground London Overground London Overground West Anglia West Anglia Thameside South Essex Thameside South Essex Chiltern South Central London South Central London Southeast London Southeast London (June 2010 – Dalston - New Cross, West Croydon and Crystal Palace services start (replacing old east London line)) 2011 – Connection at Dalston to link north east corner to new orbital route (connection between East London Line and North London Line) 2011 – North London Railway 50 per cent capacity increase 2012 – Surrey Quays - Clapham Junction extension, completion of new orbital route Further train lengthening Diversion of Watford Junction services to Stratford (instead of Euston) to release capacity for High Speed 2 at Euston Barking - Gospel Oak line – electrification and train lengthening Twelve-car capability to Stansted and Cambridge additional capacity also on inner services (HLOS CP4) Lea Valley four-tracking leading to increased frequencies to Stansted and local service to Stratford Twelve-car capability on all routes (HLOS CP4) Further capacity increases Enhanced inner suburban service (HLOS CP4) Ten-car capability on inner suburban Twelve-car capability and additional fast services (HLOS CP4) Further capacity increases Train lengthening on services to Cannon Street/ Charing Cross (HLOS CP4) Further capacity increases L M L L H M M L M/L M M M Page 171 of 310
- Page 119 and 120: The London Plan July 2011 - RTF ver
- Page 121 and 122: The London Plan July 2011 - RTF ver
- Page 123 and 124: The London Plan July 2011 - RTF ver
- Page 125 and 126: The London Plan July 2011 - RTF ver
- Page 127 and 128: The London Plan July 2011 - RTF ver
- Page 129 and 130: The London Plan July 2011 - RTF ver
- Page 131 and 132: The London Plan July 2011 - RTF ver
- Page 133 and 134: The London Plan July 2011 - RTF ver
- Page 135 and 136: The London Plan July 2011 - RTF ver
- Page 137 and 138: The London Plan July 2011 - RTF ver
- Page 139 and 140: The London Plan July 2011 - RTF ver
- Page 141 and 142: The London Plan July 2011 - RTF ver
- Page 143 and 144: The London Plan July 2011 - RTF ver
- Page 145 and 146: The London Plan July 2011 - RTF ver
- Page 147 and 148: The London Plan July 2011 - RTF ver
- Page 149 and 150: The London Plan July 2011 - RTF ver
- Page 151 and 152: The London Plan July 2011 - RTF ver
- Page 153 and 154: The London Plan July 2011 - RTF ver
- Page 155 and 156: The London Plan July 2011 - RTF ver
- Page 157 and 158: The London Plan July 2011 - RTF ver
- Page 159 and 160: The London Plan July 2011 - RTF ver
- Page 161 and 162: The London Plan July 2011 - RTF ver
- Page 163 and 164: The London Plan July 2011 - RTF ver
- Page 165 and 166: The London Plan July 2011 - RTF ver
- Page 167 and 168: The London Plan July 2011 - RTF ver
- Page 169: The London Plan July 2011 - RTF ver
- Page 173 and 174: The London Plan July 2011 - RTF ver
- Page 175 and 176: The London Plan July 2011 - RTF ver
- Page 177 and 178: The London Plan July 2011 - RTF ver
- Page 179 and 180: The London Plan July 2011 - RTF ver
- Page 181 and 182: The London Plan July 2011 - RTF ver
- Page 183 and 184: The London Plan July 2011 - RTF ver
- Page 185 and 186: The London Plan July 2011 - RTF ver
- Page 187 and 188: The London Plan July 2011 - RTF ver
- Page 189 and 190: The London Plan July 2011 - RTF ver
- Page 191 and 192: The London Plan July 2011 - RTF ver
- Page 193 and 194: The London Plan July 2011 - RTF ver
- Page 195 and 196: The London Plan July 2011 - RTF ver
- Page 197 and 198: The London Plan July 2011 - RTF ver
- Page 199 and 200: The London Plan July 2011 - RTF ver
- Page 201 and 202: The London Plan July 2011 - RTF ver
- Page 203 and 204: The London Plan July 2011 - RTF ver
- Page 205 and 206: The London Plan July 2011 - RTF ver
- Page 207 and 208: The London Plan July 2011 - RTF ver
- Page 209 and 210: The London Plan July 2011 - RTF ver
- Page 211 and 212: The London Plan July 2011 - RTF ver
- Page 213 and 214: The London Plan July 2011 - RTF ver
- Page 215 and 216: The London Plan July 2011 - RTF ver
- Page 217 and 218: The London Plan July 2011 - RTF ver
- Page 219 and 220: The London Plan July 2011 - RTF ver
The <strong>London</strong> <strong>Plan</strong> July <strong>2011</strong> – RTF version<br />
Scheme<br />
Description<br />
2012<br />
Scheme<br />
cost<br />
Anticipated<br />
completion<br />
2010 2013<br />
– –<br />
2012 2020<br />
* †<br />
Post<br />
2020<br />
<strong>London</strong><br />
Overground<br />
<strong>London</strong><br />
Overground<br />
<strong>London</strong><br />
Overground<br />
West Anglia<br />
West Anglia<br />
Thameside<br />
South Essex<br />
Thameside<br />
South Essex<br />
Chiltern<br />
South Central<br />
<strong>London</strong><br />
South Central<br />
<strong>London</strong><br />
Southeast<br />
<strong>London</strong><br />
Southeast<br />
<strong>London</strong><br />
(June 2010 – Dalston - New Cross,<br />
West Croydon and Crystal Palace<br />
services start (replacing old east<br />
<strong>London</strong> line))<br />
<strong>2011</strong> – Connection at Dalston to link<br />
north east corner to new orbital route<br />
(connection between East <strong>London</strong><br />
Line and North <strong>London</strong> Line)<br />
<strong>2011</strong> – North <strong>London</strong> Railway 50 per<br />
cent capacity increase<br />
2012 – Surrey Quays - Clapham<br />
Junction extension, completion of new<br />
orbital route<br />
Further train lengthening<br />
Diversion of Watford Junction<br />
services to Stratford (instead of<br />
Euston) to release capacity for High<br />
Speed 2 at Euston<br />
Barking - Gospel Oak line –<br />
electrification and train lengthening<br />
Twelve-car capability to Stansted and<br />
Cambridge additional capacity also on<br />
inner services (HLOS CP4)<br />
Lea Valley four-tracking leading to<br />
increased frequencies to Stansted and<br />
local service to Stratford<br />
Twelve-car capability on all routes<br />
(HLOS CP4)<br />
Further capacity increases<br />
Enhanced inner suburban service<br />
(HLOS CP4)<br />
Ten-car capability on inner suburban<br />
Twelve-car capability and additional<br />
fast services (HLOS CP4)<br />
Further capacity increases<br />
Train lengthening on services to<br />
Cannon Street/ Charing Cross (HLOS<br />
CP4)<br />
Further capacity increases<br />
L<br />
M<br />
L<br />
L<br />
H<br />
M<br />
M<br />
L<br />
M/L<br />
M<br />
M<br />
M<br />
Page 171 of 310