26.04.2014 Views

London Plan 2011 PDF 1 MB - Lambeth Council

London Plan 2011 PDF 1 MB - Lambeth Council

London Plan 2011 PDF 1 MB - Lambeth Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The <strong>London</strong> <strong>Plan</strong> July <strong>2011</strong> – RTF version<br />

5.80 Boroughs may collaborate by pooling their apportionment requirements.<br />

Provided the aggregated total apportionment figure is met, it is not necessary<br />

for boroughs to meet both the municipal and commercial/industrial waste<br />

apportionment figures individually. Boroughs need to examine how capacity<br />

can be delivered in detail at the local level as site allocations in LDFs to meet<br />

their apportionments. Boroughs working collaboratively must demonstrate<br />

that their joint apportionment targets will be met, for example, through the<br />

preparation of joint waste DPDs, joint evidence papers or bilateral<br />

agreements.<br />

5.81 Boroughs and waste authorities should identify sites which are potentially<br />

suitable for a variety of technologies, depending on the particular site’s<br />

opportunities and constraints, and assess how many facilities and what type<br />

of waste processing facilities/technologies will be required locally to meet<br />

their apportionments.<br />

Page 158 of 310

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!