26.04.2014 Views

34-36 Bedford Road, London SW4 - Lambeth Council

34-36 Bedford Road, London SW4 - Lambeth Council

34-36 Bedford Road, London SW4 - Lambeth Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Policy S7 of the Core Strategy (2011)<br />

28 The development hereby approved shall be built to a minimum standard Code<br />

for Sustainable Homes level 3. Prior to the occupation of the approved building,<br />

a copy of the Post Construction Certificate verifying that Code for Sustainable<br />

Homes level 3 has been achieved shall be submitted to the local planning<br />

authority.<br />

Reason: In the interests of sustainable development in accordance with <strong>Council</strong><br />

Policy S7 of the Core Strategy (2011)<br />

29 Details of the final energy strategy including calculations demonstrating how a<br />

reduction in predicted carbon emissions through on site renewable energy<br />

generation of 20% will be achieved shall be submitted to the local planning<br />

authority prior to the commencement of development. The approved measure<br />

shall be implemented as agreed.<br />

Reason: In the interests of sustainable development in accordance with <strong>Council</strong><br />

Policy S7 of the Core Strategy (2011)<br />

Archaeology<br />

30 No development shall take place until the applicant has secured the<br />

implementation of a programme of archaeological work in accordance with a<br />

written scheme for investigation which has been submitted to and approved by<br />

the Local Planning Authority. The development shall only take place in<br />

accordance with the detailed scheme unless otherwise agreed in writing. The<br />

archaeological works shall be carried out by a suitably qualified investigating<br />

body acceptable to the Local Planning Authority.<br />

Reason: In the interests of the protection of any archaeological remains in<br />

accordance with policy S9 of the Core Strategy (2011)<br />

Informatives<br />

1 This decision letter does not convey an approval or consent which may be<br />

required under any enactment, by-law, order or regulation, other than Section<br />

57 of the Town and Country Planning Act 1990.<br />

2 Your attention is drawn to the provisions of the Building Regulations, and related<br />

legislation which must be complied with to the satisfaction of the <strong>Council</strong>'s<br />

Building Control Officer.<br />

3 You are advised that future applications at this site will need to comply with the<br />

relevant parking standards.<br />

4 The development of the site is may have an impact on archaeological remains.<br />

The applicant should therefore submit detailed proposed in the form of an<br />

archaeological project design. The designs should be in accordance with<br />

appropriate English Heritage guidelines.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!