Tree and<br />

Woodlands<br />

Utilities<br />

(electricity/<br />

gas)<br />

Utilities<br />

(Sewerage/<br />

drainage)<br />

Utilities<br />

(water)<br />

pollution from Keswick.<br />

Residential development to the north and central core of the village are<br />

denser than the southern area consisting of two storey semi-detached<br />

estate style housing to the north and a more traditional vernacular style in<br />

the centre.<br />

The site is located in an area of low density residential properties. It<br />

contributes to the sense of tranquility and rural and is an important feature<br />

in the local amenity. The site in its entirety does not lend itself comfortably<br />

for large scale housing development.<br />

There are several mature trees within the site boundary. Trees are a very<br />

important feature in this area so issues of design and landscape need<br />

careful consideration. If propose for development it is likely to be<br />

appropriate to serve a TPO on these trees as they have high amenity<br />

value.<br />

Ensure that all mature trees are designed into the areas of public open<br />

space within the scheme and that there are no changes of level within the<br />

RPA (root protection areas) so that the mature trees can be retained.<br />

Electricity- ENWL have a commitment to provide an electricity supply to<br />

new build development. ENWL determine the cost of connection and the<br />

developer would be expected to contribute part or all of this cost. <strong>Site</strong>s<br />

closer to sub-stations and existing developments are likely to result in lower<br />

connection costs. Further information is required to provide a detailed<br />

response.<br />

Gas - No capacity issues have been identified. It should be possible to<br />

supply sites on an individual basis from the existing low pressure<br />

system. However, to provide a firm response detailed information is<br />

required.<br />

There are no problems with the foul water network.<br />

There are no problems with the fresh water network.<br />

Summary of consultation comments<br />

Housing: Support: 0 Object: 0 Don't mind: 0<br />

Employment: Support: 0 Object: 0 Don't mind: 0<br />

Waste Management: Support: 0 Object: 0 Don't mind: 0<br />

Open Space: Support: 0 Object: 0 Don't mind: 0<br />

Responses received concern access to the site and possible impacts on the existing road<br />

network as detailed in the highway section above.<br />

Summary of assessment with regards to HRA/SA<br />

Housing Development:<br />

Significant positive effect on SA objective (++):<br />

SA3: To provide everyone with a decent home<br />

SA15: To improve access to jobs<br />

Significant negative effect on SA objective (--):<br />

None identified