23.04.2014 Views

Integrated Business Planning Bridging the Gap Between Budgets ...

Integrated Business Planning Bridging the Gap Between Budgets ...

Integrated Business Planning Bridging the Gap Between Budgets ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 1 | October 2010<br />

<strong>Integrated</strong> <strong>Business</strong> <strong>Planning</strong><br />

<strong>Bridging</strong> <strong>the</strong> <strong>Gap</strong> <strong>Between</strong> <strong>Budgets</strong><br />

and Reality<br />

Deb Bene’, Emerson and Mark Gordon, Oracle


Key Takeaways<br />

• Value Chain <strong>Planning</strong> implementation is a journey, not a project –<br />

each phase has its own short time to value, but one should have a<br />

long term vision.<br />

• Start Anywhere – Focus on <strong>the</strong> highest bang for your buck within<br />

each BU/Region and don’t wait for ERP Implementation or upgrade<br />

• Pick your critical “green” KPIs – one cannot be perfect at all<br />

measures – which KPIs defines you as a company, and meet your<br />

strategy?<br />

• Create transparency between All departments, Sales, Marketing,<br />

Finance, and SC and align your Supply with your Opportunities<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 2 | October 2010


<strong>Business</strong> <strong>Planning</strong> Challenges<br />

Changing market demands<br />

• Demanding customers<br />

• Product proliferation<br />

• Shorter product lifecycles<br />

• Continuous innovation<br />

Inefficient Operations<br />

• Increasing operating costs<br />

• Capacity constraints<br />

• Supply chain lead times<br />

Sales<br />

Marketing Operations Finance<br />

Sales<br />

Data<br />

Marketing<br />

Data<br />

Operations<br />

Data 1<br />

Operations<br />

Data N<br />

Finance<br />

Data 1<br />

Finance<br />

Data N<br />

Deteriorating financial health<br />

• Eroding margins<br />

• Cost volatility<br />

• Lack of insight into profit drivers<br />

• Loss of corporate value<br />

Economic Downturn<br />

• Falling demand<br />

• Lack of credit and capital<br />

• Need to conserve cash<br />

• Decreasing competitive position<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 3 | October 2010


Manage a Unified Plan Across <strong>the</strong> Enterprise<br />

Many critical planning processes, too many spreadsheets<br />

Revenue <strong>Planning</strong><br />

Excess & Obsolete<br />

Inventory Exposure<br />

Finance<br />

Profit <strong>Planning</strong><br />

Working Capital<br />

<strong>Planning</strong><br />

Marketing<br />

New Products <strong>Planning</strong><br />

SKU Rationalization<br />

Supply Chain<br />

Supply Chain <strong>Planning</strong><br />

Demand <strong>Planning</strong><br />

Sales & Operations <strong>Planning</strong><br />

Financial <strong>Planning</strong> &<br />

Goals<br />

Strategic <strong>Planning</strong><br />

Operating<br />

Plan<br />

Product Forecasts<br />

Promotion Plans<br />

New Product Launch<br />

Product Life Cycle Plans<br />

<strong>Business</strong> Plans<br />

R&D<br />

Suppliers<br />

Collaborative <strong>Planning</strong><br />

Design Collaboration<br />

Sales Forecasts<br />

Market Requirements<br />

Sales Forecasts<br />

Sales<br />

Forecast Collaboration<br />

Key Account <strong>Planning</strong><br />

Product Requirements<br />

Product Allocation<br />

Partners<br />

Customers<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 4 | October 2010


Oracle Vision for Next Generation<br />

Sales & Operations <strong>Planning</strong><br />

Today<br />

Demand-Driven S&OP<br />

• Supply and Demand<br />

balancing<br />

• Most decision making at<br />

distinct Demand, Supply<br />

and Executive Review<br />

meetings<br />

• Periodic and reactive<br />

Next Generation<br />

<strong>Integrated</strong> <strong>Business</strong><br />

<strong>Planning</strong> Solution<br />

• Profitable response –<br />

balance opportunities and<br />

Risk<br />

• Achieve consensus<br />

operational plan through<br />

continuous, interactive<br />

decision making and<br />

alignment with financial plans<br />

• Financial scenarios<br />

• Base financial plan<br />

• Financial what-if<br />

Execute and<br />

measure <strong>the</strong> plan<br />

Approve and publish<br />

<strong>the</strong> plan<br />

<strong>Integrated</strong> Scenario Analysis<br />

Supply what-if<br />

Base supply plan<br />

Demand consensus<br />

Demand shaping what-if<br />

Base demand plan<br />

Collect sales and market input<br />

Financial what-if<br />

Base financial plan<br />

Next Generation S&OP<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 5 | October 2010<br />

5


Oracle’s <strong>Integrated</strong> <strong>Business</strong> <strong>Planning</strong> Process<br />

Provides critical link between operations, sales and finance<br />

Performance<br />

Management<br />

Financial<br />

Targets<br />

Sales and Operations <strong>Planning</strong><br />

Sales<br />

Forecast<br />

Strategic<br />

Network<br />

Optimization<br />

Demand<br />

Management<br />

Supply<br />

Chain <strong>Planning</strong><br />

Inventory<br />

Optimization<br />

• <strong>Planning</strong> driven from key performance indicators to engage managers and<br />

planners<br />

• Aggregate roll up for financial reconciliation; supports $ to units synchronization<br />

• Workflow coordinates <strong>the</strong> process and drives consensus process to ga<strong>the</strong>r sales<br />

forecast, customer demand, financial plans and operational plans<br />

• Works with Oracle ERP and legacy ERP applications<br />

• What-if simulation scenarios to examine alternative plans<br />

• Strategic supply chain analysis and inventory planning<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 6 | October 2010


Sales & Operations<br />

<strong>Planning</strong><br />

Deb Bene’<br />

<strong>Business</strong> Solutions Mgr.<br />

Emerson Program Management Office<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 7 | October 2010


Emerson At-A-Glance<br />

$20.9 Billion in sales (2009)<br />

NYSE: EMR<br />

Diversified global<br />

manufacturer<br />

and technology provider<br />

Approximately 129,000<br />

employees worldwide<br />

Headquarters in<br />

St. Louis, Mo.<br />

Manufacturing and/or sales presence in more than 150 countries<br />

255 manufacturing locations, 155 outside <strong>the</strong> U.S.<br />

No. 94 on 2009 FORTUNE 500 list of America’s largest corporations<br />

Founded in 1890<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 8 | October 2010


2009 Emerson<br />

Summary<br />

Sales<br />

Employees<br />

2009<br />

$20.9B<br />

129K<br />

International Sales Have<br />

Exceeded 50% Since 2007<br />

Mfg Plants<br />

US & Canada 100<br />

Europe 70<br />

Asia 46<br />

ROW 39<br />

Total 255<br />

Consumer<br />

Appliance &<br />

Tools<br />

Climate<br />

Technologies<br />

Network Power<br />

Electronics<br />

Asia<br />

2009 Sales by Segment<br />

Europe<br />

ROW<br />

Process<br />

Management<br />

Industrial<br />

Industrial<br />

Automation<br />

2009 Sales by Geography<br />

United<br />

States<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 9 | October 2010


Emerson Is a Leader in Its Core Global <strong>Business</strong>es &<br />

Markets<br />

#1 AC & DC Power Systems<br />

#1 OEM Embedded Power<br />

#1 Precision Cooling Systems<br />

#1 Control Valves<br />

#1 Measurement Devices<br />

#1 Compressors<br />

#1 Controls<br />

#1 Alternators<br />

#1 Fluid Control<br />

#1 Ultrasonic Welding<br />

#1 Garbage Disposers<br />

#1 Appliance Components<br />

#1 Fractional Motors #1 Storage Solutions #1 Plumbing Tools<br />

#1 Wet/Dry Vacuums<br />

#1 Pressing Tools/Jaws<br />

#1 CCTV Inspection Systems<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 10 | October 2010


Emerson’s Products and Brands<br />

Emerson Process Management<br />

Valves & Regulators<br />

Systems & Solutions<br />

Measurement<br />

Emerson Network Power<br />

<strong>Integrated</strong> DC Power Cabinets<br />

Transfer Switches<br />

DC Power Systems<br />

Enterprise Monitoring<br />

High Density Precision Cooling<br />

Precision Cooling<br />

UPS<br />

RF Connectors<br />

Mobile Chargers<br />

OEM Power<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 11 | October 2010


Emerson’s Products and Brands<br />

Emerson Industrial Automation<br />

Valve Controls<br />

Sheaves, Sprockets<br />

Solenoid Valves<br />

Pneumatic Valves<br />

Variable Speed Drives<br />

Gearing<br />

Bearings<br />

Generators<br />

Electric Motors<br />

Motion Controls<br />

Plastic & Metal Joining<br />

Emerson Appliance Motors and Tools<br />

Appliance<br />

Motor<br />

s<br />

Storage Solutions<br />

Professional Tools<br />

Thermal Sensors &<br />

Controls<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 12 | October 2010


PMO Scope of Services<br />

Applications Strategy for Standard Programs<br />

• Data and Configuration Standards<br />

• Process Design & Best Practices<br />

• Deployment Models & Roadmaps<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 13 | October 2010<br />

Application Services<br />

• Service Management<br />

• Implementation and Support Services<br />

• Subject Matter Expertise (Project Assistance)<br />

• Strategy & <strong>Planning</strong><br />

• Implementation<br />

Corporate Applications Management<br />

Project Governance<br />

• IT Project Lifecycle Process<br />

• Risk Management (SOX Compliance)<br />

• Service Model<br />

• Project Metrics


Demand <strong>Planning</strong> and S&OP – Maturity and Technology Roadmap<br />

Maturity<br />

Levels<br />

Phase 1 Phase 2 Phase 3 Phase 4<br />

Advanced<br />

(Optional)<br />

Technology<br />

Enabler<br />

MS Excel and O<strong>the</strong>r data<br />

consolidation tools<br />

Demantra Demand Management<br />

Demantra Real Time S&OP<br />

Technology<br />

Description<br />

Manual<br />

collection of<br />

demand and<br />

manually input<br />

to Excel<br />

•Dissimilar<br />

data formats<br />

Minimum<br />

version<br />

control<br />

•Multi-source<br />

collection and<br />

visibility of<br />

demand and<br />

supply data<br />

•Consolidates data<br />

into Excel or o<strong>the</strong>r<br />

data consolidation<br />

tools with version<br />

management<br />

•Share drive and<br />

email coordination<br />

•Consolidation<br />

of demand data<br />

•Capability to<br />

perform “What if<br />

Scenarios”<br />

•Integration ERP<br />

system(s)<br />

•Use manual<br />

process for<br />

Consensus FC<br />

•Component<br />

Forecasting<br />

(<strong>Planning</strong> BOM)<br />

•Collaboration<br />

•Use Work flows<br />

for approvals<br />

•Integration of<br />

Supply-data to<br />

understand<br />

supply impact of<br />

each plan<br />

•Facilitate End-to-<br />

End Demand<br />

Analysis<br />

•Define Key<br />

<strong>Business</strong> Metrics<br />

Demantra Adv<br />

Forecasting<br />

•Use of Causal<br />

factors,<br />

econometrics<br />

•Advanced<br />

statistical<br />

analysis (If<br />

applicable)<br />

Demantra introduced during Phase 3 level to build<br />

integration of demand driven value stream.<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 14 | October 2010


Vision: <strong>Integrated</strong> Supply Chain to Drive Enterprise<br />

Excellence<br />

Demand<br />

Plan<br />

S&OP<br />

Global Supply Chain Planner<br />

Marketing F/A & S/A SC Planner<br />

Build<br />

Plan<br />

Material<br />

Plan<br />

Global Supply Chain<br />

5-Year<br />

End of Pipe Metrics<br />

External Customer<br />

RDSL =<br />

PDSL =<br />

Purchasing<br />

(IPO)<br />

Suppliers<br />

(Material Plan Execution)<br />

In Bound<br />

Logistics<br />

Distribution & Product Co.<br />

Customer<br />

Internal Operations<br />

ITO =<br />

Customer<br />

Care<br />

Final Assembly<br />

Sub-Assembly<br />

Out Bound<br />

Logistics<br />

Customer<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 15 | October 2010<br />

Buyers<br />

(IPO)<br />

(Build Plan Execution)


Established a Consistent, Actionable Consensus<br />

<strong>Planning</strong> Process: “One Plan”<br />

POR<br />

$<br />

Plan<br />

Upside<br />

SC Planners<br />

WA<br />

Marketing<br />

Project<br />

Pursuit<br />

Team<br />

Historical<br />

Demand<br />

Market<br />

Intelligence<br />

Mega<br />

Project<br />

Input<br />

Demand Plan<br />

Unit<br />

($ & Unit)<br />

Plan<br />

Build Plan<br />

Material<br />

Plan<br />

Planned<br />

Order<br />

(Supplier<br />

Forecast)<br />

Firmed PO<br />

(Actual PO)<br />

Supplier<br />

iSupplier Portal<br />

Demand Plan<br />

• Model Family<br />

Volume & Mix<br />

(monthly Model<br />

Family forecast)<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 16 | October 2010<br />

Build Plan<br />

• Weekly<br />

Production<br />

Plan by<br />

Production<br />

Line<br />

Master Scheduling<br />

• Mix Percent<br />

• Weekly Material Plan<br />

to support Build Plan<br />

(option piece parts)<br />

MRP<br />

• FDS<br />

• MOQ<br />

• Safety Stock<br />

• Default PO LT<br />

etc<br />

16


Key Messages : Sales & Operation <strong>Planning</strong><br />

• Reduces operations cost by<br />

optimizing asset management<br />

through better planning<br />

• Is <strong>the</strong> key driver in managing and<br />

reducing complexity<br />

• Increases sales and customer loyalty<br />

by improving RDSL & PDSL<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 17 | October 2010


Reduces Operations Cost by Optimizing Asset<br />

Management through Better <strong>Planning</strong><br />

• Demand Management Tool – Demantra<br />

› Demand Plan<br />

- Statistical Forecast Aligned with Country <strong>Planning</strong><br />

› Hub Build Plan<br />

- Linkage with Demand Plan and Capacity<br />

› Primary Producer Build Plan<br />

- Linkage with Hub Build Plans<br />

› Material Plan<br />

- Improve Option forecast<br />

• Global <strong>Planning</strong> Organization<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 18 | October 2010


Established President Led Closed Loop Manual<br />

S&OP Process<br />

Week 1 Week 2 Week 3 Week 4<br />

America<br />

AP<br />

Global<br />

World Area<br />

S&OP Review<br />

EMEA<br />

World<br />

Area<br />

World<br />

Area<br />

Sales<br />

Plan<br />

Historical Sales Data +<br />

Project Template<br />

In Demantra<br />

Global<br />

Product<br />

Marketing<br />

World<br />

Area<br />

Factory<br />

Build<br />

Plan<br />

F/A<br />

Primary<br />

Producer<br />

Build Plan<br />

S/A<br />

Material Plan/ Option<br />

Mix<br />

Supplier Plan<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 19 | October 2010


Our Complex Product Offerings of Model Family and<br />

Options has been a Challenge to Improve Part Forecast<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 20 | October 2010


Implemented Demantra Software to Improve Forecast<br />

Accuracy and Enable Plan Linkages<br />

Historical<br />

data<br />

Multiple<br />

causal<br />

factors<br />

Seasonality<br />

Causal<br />

Analysis<br />

Outlier<br />

Detection<br />

Bayesian<br />

Estimator<br />

Bayesian<br />

Optimizer<br />

Promotion<br />

Events<br />

Combined<br />

model<br />

Trend<br />

Cyclical<br />

Patterns<br />

Forecast<br />

• Statistical Forecasting<br />

› Bayesian-Markov Mixed Model<br />

› Causal Forecasting<br />

• Consensus <strong>Planning</strong><br />

• Linkage <strong>Between</strong> Demand, Build, &<br />

Material Plan<br />

› Option Mix is Defined for Individual<br />

Model and Applied to its Respective<br />

Model Family Growth<br />

• Econometrics<br />

Results:<br />

‣ Result of 5 sites that are supported by<br />

Demantra (Global <strong>Planning</strong>) and IPO<br />

(Centralized Buying):<br />

‣ <strong>Business</strong> declined by 8.3%<br />

‣ Raw inventory reduced by 35%<br />

‣ Material Fill rate improved by 43%<br />

Closed Loop President Led Process<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 21 | October 2010<br />

21


There is still significant risk in <strong>the</strong> S&OP<br />

Plan versus Pd10 POR, $Min Q4<br />

*Includes 3 days sales accrual for September 28 - 30. ($1.4M / day Americas, $500k / day AP, $700k/day Europe)<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 22 | October 2010


Demantra <strong>the</strong>n Links World Area Demand<br />

Plan to Hub Build Plan…<br />

1. Demand Plan +/- Intracompany<br />

demands<br />

2. Smooth out large buckets of backlog<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 23 | October 2010<br />

3. Do not plan builds and material for<br />

finished goods


Hub Build Plans are fur<strong>the</strong>r Linked to<br />

Production Lines, incorporating Capacity<br />

Actual Build<br />

Max Capacity<br />

Min Capacity<br />

Build Plan<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 24 | October 2010


Demantra Fur<strong>the</strong>r Connects <strong>the</strong> Hub Build Plan to <strong>the</strong><br />

Primary Producer Build Plan<br />

Primary Producer Plan is Tightly Linked<br />

to Hub Plans<br />

40%<br />

30%<br />

Primary Producer<br />

Plan is Independent<br />

of <strong>the</strong> Hub Plans<br />

Oracle ASCP<br />

15%<br />

15%<br />

Planned<br />

Order to<br />

RTC<br />

Planned<br />

Order to<br />

RTC<br />

Wessling MRP SMMC MRP Beijing MRP<br />

Planned<br />

Order to<br />

RTC<br />

RTC Total WW Supply<br />

5<br />

%<br />

F/A<br />

Forecast<br />

RTC S&OP<br />

F/A<br />

Forecast<br />

Wessling S&OP<br />

F/A<br />

Forecast<br />

SMMC S&OP<br />

F/A<br />

Forecast<br />

Beijing S&OP<br />

Global Supply<br />

Chain Planner<br />

F/A<br />

Forecast<br />

Oracle ASCP<br />

RTC S&OP<br />

F/A<br />

Forecast<br />

Wessling MRP SMMC MRP Beijing MRP<br />

Wessling S&OP<br />

F/A<br />

Forecast<br />

SMMC S&OP<br />

F/A<br />

Forecast<br />

Beijing S&OP<br />

After Demantra<br />

RTC Planner<br />

Wessling<br />

Planner<br />

SMMC<br />

Planner<br />

Before Demantra<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 25 | October 2010


Option Forecast Based on Part Usage and Highest<br />

Usage Model Growth Rate (Before Demantra)<br />

Flange Mix<br />

Historical Usage<br />

Historical Mix %<br />

225 770 500<br />

15% 52% 33%<br />

Forecast based on<br />

Highest Usage<br />

Growth Rate<br />

1495 X (1+10%) =2173<br />

326 + 1130 + 717<br />

=2173<br />

Disconnect<br />

Forecast<br />

Growth Rate<br />

500<br />

20%<br />

1100<br />

10%<br />

75<br />

825%<br />

300<br />

7%<br />

3051SC<br />

3051C Rev 1 3051C Rev 5<br />

3095<br />

Forecast Mix does not Account for Different Model Growth Rates<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 26 | October 2010


Option Mix is Defined for Individual Model and Applied to its<br />

Respective Model Family Growth (After Demantra)<br />

3051SC<br />

3051C Rev 1 3051C Rev 5<br />

3095<br />

Direct<br />

Connect<br />

Model Forecast<br />

Growth Rate<br />

500<br />

20%<br />

3051SC Flange Mix<br />

1100<br />

10%<br />

Rev 1 Flange Mix<br />

75<br />

825%<br />

Rev 5 Flange Mix<br />

300<br />

7%<br />

3095 Flange Mix<br />

Model<br />

Family Mix %<br />

10% 25% 40%<br />

20% 45% 10%<br />

15% 40% 20%<br />

0% 30% 45%<br />

Flange Forecast<br />

395 + 1038 + 629<br />

=2062<br />

Forecast Mix Completely Accounts for Each Model Mix<br />

Change and Growth Rate<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 27 | October 2010


Key Messages : Sales & Operation <strong>Planning</strong><br />

• Reduces operations cost by optimizing<br />

asset management through better<br />

planning<br />

• Is <strong>the</strong> key driver in managing and<br />

reducing complexity<br />

• Increases sales and customer<br />

loyalty by improving RDSL & PDSL<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 28 | October 2010


Managing <strong>the</strong> Complexity through<br />

Product Segmentation<br />

ATO<br />

BTO<br />

ETO<br />

PTO<br />

On-Demand<br />

Specials<br />

Buyouts<br />

(Fast Track)<br />

A#, T#, MA#,<br />

N#, R#,<br />

W#, K#, D#, P#,<br />

F#, V#…<br />

Service<br />

Level<br />

RDSL PDSL PDSL PDSL<br />

<strong>Business</strong><br />

Driver<br />

Speed<br />

Availability<br />

Product Variety<br />

Premium Price<br />

Customization<br />

Premium Price<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 29 | October 2010


Vision: <strong>Integrated</strong> Supply Chain to Drive<br />

Enterprise Excellence<br />

Demand<br />

Plan<br />

Global Supply Chain Planner<br />

Marketing F/A & S/A SC Planner<br />

S&OP<br />

Build<br />

Plan<br />

Material<br />

Plan<br />

Global Supply Chain<br />

5-Year<br />

End of Pipe Metrics<br />

External Customer<br />

RDSL =<br />

PDSL =<br />

Purchasing<br />

(IPO)<br />

Suppliers<br />

(Material Plan Execution)<br />

In Bound<br />

Logistics<br />

Distribution & Product Co.<br />

Customer<br />

Internal Operations<br />

ITO =<br />

Customer<br />

Care<br />

Final Assembly<br />

Sub-Assembly<br />

Out Bound<br />

Logistics<br />

Customer<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 30 | October 2010<br />

Buyers<br />

(IPO)<br />

(Build Plan Execution)


E-Global Supply Chain – Global Buying<br />

BMMC<br />

GTMC<br />

Supplier<br />

RTC<br />

Global Buyer<br />

Wessling<br />

SMMC<br />

BMMC<br />

RTC<br />

GTMC<br />

SMMC<br />

ASCP<br />

Portal / CP<br />

Portal<br />

Supplier<br />

Wessling<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 31 | October 2010


Implementing Systems to Enable<br />

<strong>Integrated</strong> Supply Chain Why is this critical to <strong>the</strong><br />

company?<br />

• Improving <strong>the</strong> SPEED and<br />

SYNCHRONIZATION of<br />

our Supply Chain results<br />

in competitive advantage<br />

• FY 12 Key Strategic Plan<br />

Measures it Improves<br />

– Service Level (RDSL<br />

and PDSL)<br />

– Inventory reduction<br />

(DOH)<br />

– Increased Profit (cost<br />

reduction)<br />

– Share Gain (customer<br />

satisfaction)<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 32 | October 2010


VCP <strong>Business</strong> Processes & Solutions<br />

Supply Chain <strong>Planning</strong><br />

Inventory Management<br />

Inventory Optimization<br />

DRP<br />

Inventory<br />

Reduction<br />

VCP<br />

Profitable<br />

Revenue<br />

Growth<br />

Deal Management<br />

TPM (CG)<br />

DSR<br />

Assortment Opti<br />

Price Management<br />

Assets<br />

Sales & Operation <strong>Planning</strong><br />

<strong>Integrated</strong> <strong>Business</strong> <strong>Planning</strong><br />

Manufacturing Insights<br />

Optimization<br />

&<br />

Utilization<br />

Sourcing Optimization<br />

Assets Optimization<br />

Network Optimization<br />

Plant Resource Management<br />

Production Scheduling<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 33 | October 2010


SUCCESSIVE<br />

REFINEMENT<br />

Executive Dash<br />

Boarding<br />

Sync with<br />

Finance<br />

Cycle continues …<br />

<strong>Business</strong> as Usual<br />

“How do I<br />

schedule my plant<br />

to maximize ROA”<br />

DRIVE<br />

EFFICIENCY<br />

(PLANT LEVEL)<br />

Executive S&OP Review<br />

“Where are my<br />

issues?”<br />

COMMAND AND<br />

CONTROL<br />

5<br />

1<br />

4<br />

Imbalance<br />

End to End VCP<br />

Command &<br />

Control<br />

Sales and Account Teams<br />

Demand Review<br />

“Can I impact <strong>the</strong><br />

market demand?”<br />

SENSE AND<br />

CREATE<br />

DEMAND<br />

2<br />

3<br />

Demand Management<br />

Consensus Demand<br />

Supply Review<br />

“Will network changes<br />

help me meet demand<br />

more profitably?”<br />

MANAGE RISK<br />

PLAN NETWORK<br />

SET RULES<br />

Sourcing rules, etc<br />

Plant Specific Plan<br />

Manufacturing<br />

Operational Supply Demand Balancing<br />

“Am I assured that I'm deploying and<br />

producing in alignment with my S&OP plan?”<br />

EXECUTE PLAN & MANAGE<br />

EXCEPTIONS (E2E)<br />

Sourcing &Supply Chain<br />

<strong>Planning</strong><br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 34 | October 2010


World Class Supply Chain Solutions<br />

Complete. Open. <strong>Integrated</strong>. Modular<br />

Focus on return on assets<br />

Optimize inventory holdings and<br />

deploy inventory networks<br />

Use advanced statistics and<br />

causal factors<br />

Real-Time Sales and Operations<br />

<strong>Planning</strong><br />

Focus on return on assets<br />

Optimization<br />

Eliminate<br />

spreadsheets<br />

Manage rolling forecasts<br />

Collaborate with all constituents<br />

on one number<br />

Use basic statistics, alerts, and<br />

seeded worksheets<br />

Deploy fast MRP across multiple<br />

ERP instances<br />

Optimize networks and sourcing<br />

decisions<br />

Collaborate with customers<br />

Constraint based supply chain<br />

planning<br />

Executive dashboards and<br />

reporting<br />

Manage rolling forecasts<br />

Collaborate with all constituents<br />

on one number<br />

Use basic statistics, alerts, and<br />

seeded worksheets<br />

Deploy fast MRP across multiple<br />

ERP instances<br />

Optimize networks and sourcing<br />

decisions<br />

Collaborate with customers<br />

Constraint based supply chain<br />

planning<br />

Executive dashboards and<br />

reporting<br />

Manage rolling forecasts<br />

Collaborate with all constituents<br />

on one number<br />

Use basic statistics, alerts, and<br />

seeded worksheets<br />

Deploy fast MRP across multiple<br />

ERP instances<br />

Incremental Value<br />

Effectiveness Efficiency<br />

Competitive Necessity<br />

From less complex to best in class<br />

Competitive Advantage<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 35 | October 2010<br />

Evolve at your own pace to a best in class solution


Key Takeaways<br />

• Value Chain <strong>Planning</strong> implementation is a journey, not a project<br />

– each phase has its own short time to value, but one should<br />

have a long term vision.<br />

• Start Anywhere – Focus on <strong>the</strong> highest bang for your buck<br />

within each BU/Region and don’t wait for ERP Implementation or<br />

upgrade<br />

• Pick your critical “green” KPIs – one cannot be perfect at all<br />

measures – which KPIs defines you as a company, and meet<br />

your strategy?<br />

• Create transparency between All departments, Sales, Marketing,<br />

Finance, and SC and align your Supply with your<br />

Opportunities<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 36 | October 2010


Additional Information About<br />

Oracle Value Chain <strong>Planning</strong> visit<br />

www.oracle.com\goto\vcp<br />

Questions: deb.bene@emerson.com<br />

Mark.gordon@oracle.com<br />

Thank you!<br />

© 2010 Supply Chain Council. ALL RIGHTS RESERVED. | Slide 37 | October 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!