Boring - Trenchless International
Boring - Trenchless International
Boring - Trenchless International
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Working together for<br />
trenchless advances<br />
Perma-Liner Industries is the North American distributer for IMS Robotics –<br />
bringing innovative products to a new market.<br />
Forging strong international<br />
relationships between companies is an<br />
integral component of building the trenchless<br />
industry worldwide. The relationship<br />
between Perma-Liner and IMS Robotics<br />
is a successful example in the trenchless<br />
industry. Perma-Liner will tour the<br />
US in the week following NASTT’s No-Dig<br />
Chicago event, demonstrating several<br />
robotic cutting devices of IMS Robotics.<br />
Perma-Liner is one of North America’s<br />
leading suppliers of equipment for rehabilitation<br />
of sewers and drains and will<br />
launch a new low budget lateral cutter<br />
– the Micro Cutter Light. This system is<br />
a world first in the field of reinstatement<br />
cutters. Based on a cutter version, which<br />
has already been selling successfully<br />
worldwide for many years, the designers<br />
have developed a low budget system with<br />
almost all the benefits of the well known<br />
system but more than the half of the price.<br />
Owner of Perma-Liner Jerry D’Hulster<br />
said that this product is a response to the<br />
growing demand for favourable equipment<br />
for the growing relining sector. With<br />
cheaper but effective systems, small<br />
companies can also now afford to have<br />
access to the relining business and help<br />
to protect the environment.<br />
But why is this new cutter unique? The<br />
company said that some low budget cutters<br />
in the market are controlled manually<br />
and it is very hard to control it after bends<br />
and cutting precisely. The swivel and rotation<br />
movement of the Micro Cutter Light is<br />
controlled electrically by a joystick. The<br />
designers say that there is no opportunity<br />
that control will be lost. The working<br />
range is three inches up to six inches and<br />
the cutter is able to pass bends of up to<br />
90 degrees. The cutter is fixed in a pipe<br />
with a rubber bladder and therefore is<br />
also useable in vertical pipes. Although<br />
the motor is air driven, the cutting engine<br />
is extremely strong, sufficient for all kinds<br />
of liners and moreover for strong obstructions<br />
including concrete. There is also a<br />
mounting for fixing a push rod camera to<br />
monitor the cutting process.<br />
The service and repair system is also<br />
very easy. Due to changeable single components,<br />
the operator is able to change<br />
the components immediately, in case of<br />
break down.<br />
Perma-Liner has also unveiled new Pull-<br />
In-Place CIPP system. This addition will<br />
allow installers versatility between the<br />
Perma-Lateral air-inversion system and<br />
the newly-released Pull-In-Place system.<br />
Perma-Liner Industries was established<br />
in 1998 to provide plumbers, contractors<br />
and municipalities Cured-In-Place-Pipe<br />
(CIPP) systems in North America aimed<br />
specifically at the municipal, residential<br />
and commercial market and supported by<br />
a range of updated and newly developed<br />
trenchless repairing techniques. Today<br />
the company offers a range of techniques<br />
from 2 inch to 102 inch pipe diameters.<br />
Here we look at three recent jobs<br />
benefitting from the relining and robotic<br />
techniques.<br />
The publishers of <strong>Trenchless</strong> <strong>International</strong><br />
magazine bring you the<br />
<strong>Trenchless</strong> Wall Chart<br />
robotics<br />
April 2010 - <strong>Trenchless</strong> <strong>International</strong><br />
Grand Rapids, Michigan<br />
Plummer’s Environmental relined<br />
a four inch diameter, 207 feet long,<br />
scaled cast iron pipe at a local food<br />
processing plant. David VanDyken<br />
from Plummer’s said that they had<br />
one shot to line this foot pipe and<br />
reinstate four lateral connections to<br />
the main that ran the length of the<br />
plant floor while the plant was closed<br />
for the weekend. Only having access<br />
from one manhole might have presented<br />
a challenge to some, but<br />
with a couple of delivery hoses they<br />
were able to invert the full 200 plus<br />
feet of liner in the one shot. After a<br />
three-hour cure they were off and<br />
reinstating all of the tie-ins with their<br />
mini reinstatement cutter. At approximately<br />
30 minutes apiece for the<br />
reinstatements they were in and out<br />
in less than one work day!<br />
Dawsonville, Georgia<br />
Townley Construction completed<br />
a job at the Historic Hay House in<br />
Macon Georgia. The Johnston-Felton-<br />
Hay House was built from 1855-1859.<br />
Named after the three families that<br />
inhabited it for the past three centuries,<br />
the house has become a landmark<br />
in Georgia dating back to pre-Civil<br />
War times. The house had amenities<br />
that were unmatched for the time<br />
period in which it was built including<br />
central heating, hot and cold running<br />
water, a speaker-tube system,<br />
in-house kitchen, and an elaborate<br />
ventilation system. The repair that was<br />
performed by Townley Construction<br />
was a two inch downspout that was<br />
leaking through the wall of the house.<br />
This job was completed in less than<br />
five hours.<br />
Las Vegas, Nevada<br />
Spartan Plumbing has used CIPP<br />
under Planet Hollywood in Las<br />
Vegas. Spartan Plumbing found<br />
a corroded eight inch pipe under<br />
Planet Hollywood that was missing<br />
approximately 20 per cent of its pipe<br />
throughout the main line on both<br />
sides. This section went completely<br />
under Planet Hollywood’s restaurant<br />
and out the service corridor. This<br />
line serviced five other restaurants<br />
and twenty stores. Spartan Plumbing<br />
started by gently hydro-jetting the<br />
cast iron and was successful in cleaning<br />
the pipe without a total collapse<br />
of the line. Due to the high profile<br />
job, it would be nearly impossible<br />
for Spagos and Planet Hollywood to<br />
be without a sewer line. At midnight<br />
Spartan Plumbing shot 132 feet and<br />
had it cured by 7.00 am.<br />
Make sure your company stays in front of trenchless<br />
decision makers worldwide.<br />
To secure your space or to find out more information contact:<br />
Brett Thompson<br />
E: bthompson@gs-press.com.au<br />
T: +61 3 92485100<br />
Finished size 960 mm x 650 mm<br />
52 Wall chart images are not finalised and are subject to change.<br />
53