PROVINCIAL POLICY STATEMENT<br />

2.5.3 Rehabilitation<br />

2.5.3.1 Progressive <strong>and</strong> final rehabilitation shall be required to accommodate subsequent l<strong>and</strong><br />

uses, to promote l<strong>and</strong> use compatibility, <strong>and</strong> to recognize the interim nature <strong>of</strong><br />

extraction. Final rehabilitation shall take surrounding l<strong>and</strong> use <strong>and</strong> approved l<strong>and</strong> use<br />

designations into consideration.<br />

2.5.3.2 In parts <strong>of</strong> the Province not designated under the Aggregate Resources Act,<br />

rehabilitation st<strong>and</strong>ards that are compatible with those under the Act should be adopted<br />

for extraction operations on private l<strong>and</strong>s.<br />

2.5.4 Extraction in Prime Agricultural Areas<br />

2.5.4.1 In prime agricultural areas, on prime agricultural l<strong>and</strong>, extraction <strong>of</strong> mineral<br />

aggregate resources is permitted as an interim use provided that rehabilitation <strong>of</strong> the<br />

site will be carried out so that substantially the same areas <strong>and</strong> same average soil<br />

quality for agriculture are restored.<br />

On these prime agricultural l<strong>and</strong>s, complete agricultural rehabilitation is not required<br />

if:<br />

a) there is a substantial quantity <strong>of</strong> mineral aggregate resources below the water<br />

table warranting extraction, or the depth <strong>of</strong> planned extraction in a quarry makes<br />

restoration <strong>of</strong> pre-extraction agricultural capability unfeasible;<br />

b) other alternatives have been considered by the applicant <strong>and</strong> found unsuitable.<br />

The consideration <strong>of</strong> other alternatives shall include resources in areas <strong>of</strong><br />

Canada L<strong>and</strong> Inventory Class 4 to 7 soils, resources on l<strong>and</strong>s identified as<br />

designated growth areas, <strong>and</strong> resources on prime agricultural l<strong>and</strong>s where<br />

rehabilitation is feasible. Where no other alternatives are found, prime<br />

agricultural l<strong>and</strong>s shall be protected in this order <strong>of</strong> priority: specialty crop<br />

areas, Canada L<strong>and</strong> Inventory Classes 1, 2 <strong>and</strong> 3; <strong>and</strong><br />

c) agricultural rehabilitation in remaining areas is maximized.<br />

2.5.5 Wayside Pits <strong>and</strong> Quarries, Portable Asphalt Plants <strong>and</strong> Portable<br />

Concrete Plants<br />

2.5.5.1 Wayside pits <strong>and</strong> quarries, portable asphalt plants <strong>and</strong> portable concrete plants used<br />

on public authority contracts shall be permitted, without the need for an <strong>of</strong>ficial plan<br />

amendment, rezoning, or development permit under the Planning Act in all areas,<br />

except those areas <strong>of</strong> existing development or particular environmental sensitivity<br />

which have been determined to be incompatible with extraction <strong>and</strong> associated<br />

activities.<br />