20.04.2014 Views

bid document for the work - IDCO

bid document for the work - IDCO

bid document for the work - IDCO

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TENDER FOR WORKS.<br />

I/We hereby tender <strong>for</strong> <strong>the</strong> execution <strong>for</strong> <strong>the</strong> <strong>work</strong> of Orissa Industrial Infrastructure<br />

Development Corporation, Bhubaneswar, specified in <strong>the</strong> under written memorandum at <strong>the</strong> rates<br />

specified <strong>the</strong>reon within <strong>the</strong> period as mentioned in <strong>the</strong> tender call notice from <strong>the</strong> date of written<br />

order to commence and accordance in all respects with <strong>the</strong> specification, designs, drawings and<br />

o<strong>the</strong>r <strong>document</strong>s referred to in rule, I hereof and subject to <strong>the</strong> annexed conditions of contract and<br />

with such materials as are provided <strong>for</strong> in all respects in accordance with such conditions.<br />

MEMORANDUM<br />

a) Name of <strong>work</strong> : Repair, Renovation of existing Elevated<br />

Storage Reservoir (ESR) of capacity 2.00<br />

lakh Ltrs. and 15.00 Mtr. staging including<br />

all Civil, Mechanical & PH <strong>work</strong>s at Kalunga<br />

I/E, Rourkela.<br />

b) Estimated cost : Rs. 10.10 lakh<br />

c) Earnest Money to be deposited : Rs. 10,100/-(Rupees Ten thousand one<br />

hundred) only.<br />

d) Initial security deposit (including<br />

Earnest money) to be deposited<br />

be<strong>for</strong>e drawal of agreement (2%<br />

(two) percent of <strong>the</strong> tendered<br />

amount)<br />

:<br />

Percentage to be deducted from<br />

bill @ 5%(five percent) towards<br />

per<strong>for</strong>mance guarantee)<br />

(This percentage deducted from<br />

bills will be credited to <strong>the</strong><br />

Contractor’s security deposit)<br />

Time required <strong>for</strong> <strong>the</strong> <strong>work</strong> from<br />

Date of written order to commence<br />

3 (Three ) Calendar months .<br />

Date of written order to commence<br />

Should this tender be accepted I/We hereby agree to a<strong>bid</strong>e by and fulfil all <strong>the</strong> terms and<br />

provisions of <strong>the</strong> said conditions of contract annexed hereto or in default <strong>the</strong>reof <strong>for</strong>feiture to pay to<br />

<strong>the</strong> Orissa Industrial Infrastructure Development Corporation, Bhubaneswar or his successors in<br />

office of <strong>the</strong> sum of money mentioned in <strong>the</strong> said condition.<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!