bid document for the work - IDCO
bid document for the work - IDCO
bid document for the work - IDCO
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
TENDER FOR WORKS.<br />
I/We hereby tender <strong>for</strong> <strong>the</strong> execution <strong>for</strong> <strong>the</strong> <strong>work</strong> of Orissa Industrial Infrastructure<br />
Development Corporation, Bhubaneswar, specified in <strong>the</strong> under written memorandum at <strong>the</strong> rates<br />
specified <strong>the</strong>reon within <strong>the</strong> period as mentioned in <strong>the</strong> tender call notice from <strong>the</strong> date of written<br />
order to commence and accordance in all respects with <strong>the</strong> specification, designs, drawings and<br />
o<strong>the</strong>r <strong>document</strong>s referred to in rule, I hereof and subject to <strong>the</strong> annexed conditions of contract and<br />
with such materials as are provided <strong>for</strong> in all respects in accordance with such conditions.<br />
MEMORANDUM<br />
a) Name of <strong>work</strong> : Repair, Renovation of existing Elevated<br />
Storage Reservoir (ESR) of capacity 2.00<br />
lakh Ltrs. and 15.00 Mtr. staging including<br />
all Civil, Mechanical & PH <strong>work</strong>s at Kalunga<br />
I/E, Rourkela.<br />
b) Estimated cost : Rs. 10.10 lakh<br />
c) Earnest Money to be deposited : Rs. 10,100/-(Rupees Ten thousand one<br />
hundred) only.<br />
d) Initial security deposit (including<br />
Earnest money) to be deposited<br />
be<strong>for</strong>e drawal of agreement (2%<br />
(two) percent of <strong>the</strong> tendered<br />
amount)<br />
:<br />
Percentage to be deducted from<br />
bill @ 5%(five percent) towards<br />
per<strong>for</strong>mance guarantee)<br />
(This percentage deducted from<br />
bills will be credited to <strong>the</strong><br />
Contractor’s security deposit)<br />
Time required <strong>for</strong> <strong>the</strong> <strong>work</strong> from<br />
Date of written order to commence<br />
3 (Three ) Calendar months .<br />
Date of written order to commence<br />
Should this tender be accepted I/We hereby agree to a<strong>bid</strong>e by and fulfil all <strong>the</strong> terms and<br />
provisions of <strong>the</strong> said conditions of contract annexed hereto or in default <strong>the</strong>reof <strong>for</strong>feiture to pay to<br />
<strong>the</strong> Orissa Industrial Infrastructure Development Corporation, Bhubaneswar or his successors in<br />
office of <strong>the</strong> sum of money mentioned in <strong>the</strong> said condition.<br />
9