him regarding <strong>the</strong> correctness of <strong>the</strong> tests. The Contractor shall submit a copy of <strong>the</strong> test<br />

results to <strong>the</strong> authorized Officer of <strong>the</strong> Corporation immediately after <strong>the</strong> test. In case <strong>the</strong><br />

Contractor fails to carry out <strong>the</strong> tests in <strong>the</strong> manner prescribed in <strong>the</strong> relevant I.S. Code, <strong>the</strong><br />

same shall be carried out by <strong>the</strong> Corporation and <strong>the</strong> cost so involved shall be recovered<br />

from any amount due to <strong>the</strong> Contractor.<br />

36. In case some machinery is available with <strong>the</strong> Corporation <strong>the</strong> same can be utilized by <strong>the</strong><br />

Contractor on payment of <strong>the</strong> prescribed hire charges to Corporation. The hire charges as<br />

fixed by <strong>the</strong> Corporation shall be binding on <strong>the</strong> Contractor.<br />

37. The Contractor has to provide a net <strong>work</strong> of pipe lines <strong>for</strong> proper watering and curing of<br />

<strong>the</strong> <strong>work</strong>s and provide outlet points at suitable places at his own cost. Curing shall be done<br />

by <strong>the</strong> Contractor at his own cost with an arrangement of flexible pipes and nozzles etc.<br />

The cost of energy charges, <strong>for</strong> running of pumps, machineries and lighting arrangements<br />

etc. are to be borne by <strong>the</strong> Contractor. If at any stage , it is observed that <strong>the</strong> curing being<br />

done by <strong>the</strong> Contractor is not proper and acceptable to <strong>the</strong> Corporation <strong>the</strong>n <strong>the</strong> same shall<br />

be got done by <strong>the</strong> Corporation departmentally, or through o<strong>the</strong>r agency on actual cost +<br />

25% basis without an prior notice to <strong>the</strong> Contractor. This amount with 25% surcharge shall<br />

be recovered by <strong>the</strong> Corporation from any amount due to <strong>the</strong> Contractor.<br />

38. The Corporation will at his discretion and convenience and <strong>for</strong> <strong>the</strong> duration of <strong>the</strong> execution<br />

of <strong>the</strong> <strong>work</strong> may provide land <strong>for</strong> construction of Contractors field, office, godowns <strong>work</strong><br />

shops and assembly yard required <strong>for</strong> <strong>the</strong> execution of <strong>the</strong> contract nearest to <strong>the</strong> site. The<br />

tenderer shall at his own cost construct all <strong>the</strong>se temporary buildings structures and provide<br />

suitable water supply and sanitary arrangement as approved by <strong>the</strong> authorized officer of<br />

<strong>IDCO</strong> and o<strong>the</strong>r inspectorates.<br />

39. MATERIALS OBTAINED FROM DISMANTLING:<br />

If <strong>the</strong> Contractor in <strong>the</strong> course of execution of <strong>the</strong> <strong>work</strong> is called upon to dismantle any part<br />

<strong>for</strong> reasons o<strong>the</strong>r than those stipulated specifically in <strong>the</strong> tender else where <strong>the</strong> materials<br />

obtaining in <strong>the</strong> <strong>work</strong> of dismantling etc. will be considered as <strong>the</strong> Corporation’s property<br />

and will be disposed off to <strong>the</strong> best advantage of <strong>the</strong> Corporation.<br />

40. WORKS ON SUNDAYS & HOLIDAYS<br />

For carrying out <strong>work</strong>s on Sundays and holidays except curing, <strong>the</strong> Contractor will approach<br />

<strong>the</strong> authorized Officer of <strong>IDCO</strong> or his representative at least two days in advance and obtain<br />

permission in writing. The Contractor shall observe all labour laws and o<strong>the</strong>r statutory rules<br />

and regulations in <strong>for</strong>ce. In case of any violation of such laws, rules and regulations,<br />