27. The Corporation will have <strong>the</strong> right to supply at any time in <strong>the</strong> interest of <strong>work</strong> any Deptt.<br />
Materials to be used in <strong>the</strong> <strong>work</strong> in addition to those mentioned in Clause-IC(b) conditions<br />
of contract and <strong>the</strong> Contractor shall use such materials without any controversy or dispute<br />
on that account. The rates of such materials will be at <strong>the</strong> stock issue rates fixed by <strong>the</strong><br />
Corporation plus storage charges or market rates prevailing at <strong>the</strong> time of supply whichever<br />
is higher.<br />
28. The Contractor will be responsible <strong>for</strong> <strong>the</strong> loss or damage if any, departmental materials,<br />
equipment’s supplied to him under condition No.9 of <strong>the</strong> General Conditions and No.35 of<br />
<strong>the</strong> Special Conditions of Contract during execution of <strong>work</strong> due to any reasons<br />
whatsoever and <strong>the</strong> cost of such materials will be recovered from him at <strong>the</strong> prevailing stock<br />
issue rates plus storage charges or market rates whichever is higher.<br />
29. When any items of <strong>work</strong> not specifically covered by <strong>the</strong> accepted tender or contract, is to be<br />
executed, it can be taken up departmentally or through any o<strong>the</strong>r agency as <strong>the</strong><br />
Corporation fees fit.<br />
30. In selection of fittings/-glazed tiles, stone/ grills/ paints etc., <strong>the</strong> decision of <strong>the</strong> Corporation<br />
is final in regard to quality, make, shade etc.<br />
31. No part of <strong>the</strong> contract shall be sublet without written permission of <strong>the</strong> Corporation or<br />
transfer be made by Power of Attorney authorizing o<strong>the</strong>rs to receive payment on <strong>the</strong><br />
Contractor’s behalf.<br />
32. Under no circumstances interest is chargeable <strong>for</strong> <strong>the</strong> dues or additional dues if any<br />
payable <strong>for</strong> <strong>the</strong> <strong>work</strong>. (As per Orissa Works Department’s letter No.3662 Dt.20.12.79).<br />
33. The Contractor shall make all arrangements at his own cost <strong>for</strong> proper storage of materials<br />
and guarding <strong>the</strong> same.<br />
34. The Corporation reserves <strong>the</strong> right to delete any item of <strong>work</strong> incorporated in this<br />
agreement from <strong>the</strong> scope of <strong>the</strong> contract and execute <strong>the</strong> same ei<strong>the</strong>r departmentally or<br />
through o<strong>the</strong>r agency, without assigning any reason <strong>the</strong>reof. Such deletion shall not<br />
invalidate <strong>the</strong> contract and no monetary compensation whatsoever shall be paid to <strong>the</strong><br />
Contractor in this regard.<br />
35. The Contractor shall carry out all <strong>the</strong> required tests <strong>for</strong> <strong>the</strong> <strong>work</strong>s at his own cost in <strong>the</strong><br />
manner prescribed in relevant I.S. Codes. The tests should be done in presence of <strong>the</strong><br />
authorized person of <strong>the</strong> Corporation or his sub-ordinate and duly certified by<br />
78