10. It is <strong>the</strong> Contractor’s responsibility to correctly demarcate <strong>the</strong> layout and orientation of <strong>the</strong><br />

building and fixation of <strong>the</strong> level pillars at site by his own technical staff as directed by<br />

Corporation.<br />

All expenditure in connection with tool and plants instrument materials etc., required in<br />

connection with demarcation of layout including minor leveling <strong>the</strong> ground, fixation of level,<br />

bench marks and centre line etc., shall be borne by <strong>the</strong> Contractor.<br />

11. The Contractor be<strong>for</strong>e any casting of RCC <strong>work</strong>s/ plastering <strong>work</strong>s/ flooring <strong>work</strong> shall<br />

obtain <strong>the</strong> services/ clearance from <strong>the</strong> Officer authorized by <strong>the</strong> Corporation.<br />

12. Bailing out water from <strong>the</strong> foundation where necessary shall be borne by <strong>the</strong> Contractor.<br />

13. As regards extra items of <strong>work</strong>, extra quantity of any item in excess of <strong>the</strong> schedule, order<br />

must be obtained from <strong>the</strong> Corporation and in such cases, <strong>the</strong> matter shall be dealt as per<br />

provision of Clause-11 of <strong>the</strong> Contract.<br />

14. The Contractor shall be responsible <strong>for</strong> any accident to any person and shall have to bear<br />

<strong>the</strong> cost of all litigation arising out of any such accident and also <strong>for</strong> <strong>the</strong> payment of any<br />

money, damages or compensation payable in respect of such accident to any person,<br />

employed by him <strong>for</strong> <strong>the</strong> <strong>work</strong> in any capacity whatsoever.<br />

15. The Contractor shall submit to <strong>the</strong> Authorized Officer of <strong>the</strong> Corporation monthly return of<br />

labour both skilled and unskilled employed by him on <strong>the</strong> <strong>work</strong>.<br />

16. No monetary compensation shall be entertained on account of natural calamities like<br />

cyclone, earthquake and flood etc., but suitable extension of time may be granted by <strong>the</strong><br />

Corporation on consideration of <strong>the</strong> application of <strong>the</strong> Contractor.<br />

17. Provisional deduction towards Sales Tax and Income Tax shall be made from each and<br />

every bill of <strong>the</strong> Contractor.<br />

18. The rates quoted by <strong>the</strong> Contractor shall be inclusive of transportation, carriage, lead,<br />

loading, unloading al taxes, levy, octroi etc. including contract of <strong>the</strong> State Government and<br />

Excise duties. In <strong>the</strong> event of variation on <strong>the</strong> above taxes, levies, duties etc. rates shall not<br />

be changed. However, under relevant condition, specification under this contract variations<br />

would be accepted according to <strong>the</strong> whole sale price index as per Clause-30 of <strong>the</strong><br />

Contract.<br />

19. If <strong>the</strong> Contractor removes any Corporation materials or stock supplied to him from <strong>the</strong> site<br />

of <strong>work</strong> with a view to dispose off <strong>the</strong> same dishonestly, he shall, in addition to any o<strong>the</strong>r<br />