bid document for the work - IDCO
bid document for the work - IDCO bid document for the work - IDCO
(i) (j) (k) (l) Provision is made for safe drinking water at the construction site for use by the labourers and other persons working/ supervising works there. Wastage of construction water is avoided. As far as practicable dust-preventing masks, safety belts and helmets, industrial gloves etc. are provided to the workers to avoid possible accidents and physical injuries to them. First Aid Box is kept to attend to minor injuries immediately. (m) The address and telephone numbers of the nearest Police Station, Fire Brigade and Hospital are recorded on a display board for information of all concerned. The Contractor should take all necessary steps as mentioned above without any additional claim to the Corporation. 72
SPECIAL CONDITIONS FORMING A PART OF THIS CONTRACT. 1. All works are to be executed and measured in conformity with the relevant upto date I.S Specification, CPHEEO Manual, National building code and Orissa Detailed Standard Specification, I.R.C and MOS&T Code of practice and specification. In case of variation in the norms, specifications and methods of execution and measurement as prescribed in the different codes and incase of doubt regarding means and scope of specification of any items, the decision of Chairman-cum-Managing Director, IDCO will be final and binding in this regard. No extra monetary compensation over and above the accepted agreement rates for various item will be paid to the Contractor on this Account. 2. Incase of any technical specification not covered in the relevant I.S Specifications, CPHEEO manuals, National Building Code and Orissa Detailed standard Specification, I.R.C. and MOS&T Code etc., the specification given by the Consultant/Purchaser/IDCO is final and binding on the contractor. 3. Every tenderer must examine the detailed specification of Orissa Public Works Department, relevant IS specifications, CPHEEO manuals and provisions in National Building code and IRC, MOS&T specification before submitting his tender. The right is reserved with the Corporation without impairing the contract to make such increase or decrease in the quantities or items of work mentioned in the schedule of quantities attached to the tender notice as may by considered necessary to complete the work fully and satisfactorily. Such increase/decrease shall in no case invalidate the contract or rates. However, increase in quantity of any particular item upto 25% of the tendered quantity the rate quoted/accepted will remain in force. It shall be definitely understood that the Corporation does not accept any responsibility of the correctness or completeness of the quantities shown in the schedule. The schedule is liable to alternation by omission or addition or deduction and such omissions, additions and deductions shall in no case invalidate the contract and no extra monetary compensation will be entertained. At any point of time, the contract can be terminated if so desired by the Corporation before 30 days of the proposed date of termination. In the event of such termination, the Contractor shall not be entitled to any monetary compensation whatsoever. 4. It is the responsibility of the Contractor to ensure production of quality concrete of required strength and durability which shall be ascertained by the regular field and Laboratory tests in accordance with IS: 516 and other relevant Indian Standards. All cost involving such test shall be borne by the Contractor. 73
- Page 21 and 22: 6. The Contractor shall make good a
- Page 23 and 24: GENERAL INFORMATION 1. SCOPE OF WOR
- Page 25 and 26: 7. TENDER PRICES 7.1 The contractor
- Page 27 and 28: 8. Contractors responsibility: a) T
- Page 29 and 30: h) Centering, shuttering as require
- Page 31 and 32: Penalty levied for any delay which
- Page 33 and 34: In the event of the authorized offi
- Page 35 and 36: Besides above, 5% ( five per cent)
- Page 37 and 38: Inform the authorized officer of th
- Page 39 and 40: eyond the reach of measurement any
- Page 41 and 42: a) The authorized person of the Cor
- Page 43 and 44: The expression “words” of “wo
- Page 45 and 46: suffered by a worker or workers by
- Page 47 and 48: SCOPE OF WORK GENERAL The intent of
- Page 49 and 50: 1.4 Inspection & Testing: For all m
- Page 51 and 52: 10. The surplus earth and debris sh
- Page 53 and 54: PAYMENT BREAK-UP SCHEDULE Sl.No. De
- Page 55 and 56: SPECIAL CONDITION. The contractor s
- Page 57 and 58: NOTES: - SCHEDULE OF ITEMS 1. Detai
- Page 59 and 60: SPECIAL NOTE 1. The rates to be quo
- Page 61 and 62: d) If the rate can not be derived a
- Page 63 and 64: ORISSA INDUSTRIAL INFRASTRUCTURE DE
- Page 65 and 66: 10. When a tender is selected for a
- Page 67 and 68: COMMERCIAL & TECHNICAL INFORMATION
- Page 69 and 70: 8. RESIDENT ENGINEER: The contracto
- Page 71: 15. No overhead lines should be ere
- Page 75 and 76: The amount so due as aforesaid shal
- Page 77 and 78: liabilities Civil or Criminal arisi
- Page 79 and 80: him regarding the correctness of th
- Page 81 and 82: ORISSA P.W.D./ ELECTRICITY DEPARTME
- Page 83 and 84: i) Deductions for absence from duty
- Page 85: BILL OF QUANTITY Sl.No. Description
(i)<br />
(j)<br />
(k)<br />
(l)<br />
Provision is made <strong>for</strong> safe drinking water at <strong>the</strong> construction site <strong>for</strong> use by <strong>the</strong><br />
labourers and o<strong>the</strong>r persons <strong>work</strong>ing/ supervising <strong>work</strong>s <strong>the</strong>re.<br />
Wastage of construction water is avoided.<br />
As far as practicable dust-preventing masks, safety belts and helmets, industrial<br />
gloves etc. are provided to <strong>the</strong> <strong>work</strong>ers to avoid possible accidents and physical<br />
injuries to <strong>the</strong>m.<br />
First Aid Box is kept to attend to minor injuries immediately.<br />
(m)<br />
The address and telephone numbers of <strong>the</strong> nearest Police Station, Fire Brigade and<br />
Hospital are recorded on a display board <strong>for</strong> in<strong>for</strong>mation of all concerned.<br />
The Contractor should take all necessary steps as mentioned above without any additional claim to<br />
<strong>the</strong> Corporation.<br />