(i) (j) (k) (l) Provision is made for safe drinking water at the construction site for use by the labourers and other persons working/ supervising works there. Wastage of construction water is avoided. As far as practicable dust-preventing masks, safety belts and helmets, industrial gloves etc. are provided to the workers to avoid possible accidents and physical injuries to them. First Aid Box is kept to attend to minor injuries immediately. (m) The address and telephone numbers of the nearest Police Station, Fire Brigade and Hospital are recorded on a display board for information of all concerned. The Contractor should take all necessary steps as mentioned above without any additional claim to the Corporation. 72

SPECIAL CONDITIONS FORMING A PART OF THIS CONTRACT. 1. All works are to be executed and measured in conformity with the relevant upto date I.S Specification, CPHEEO Manual, National building code and Orissa Detailed Standard Specification, I.R.C and MOS&T Code of practice and specification. In case of variation in the norms, specifications and methods of execution and measurement as prescribed in the different codes and incase of doubt regarding means and scope of specification of any items, the decision of Chairman-cum-Managing Director, IDCO will be final and binding in this regard. No extra monetary compensation over and above the accepted agreement rates for various item will be paid to the Contractor on this Account. 2. Incase of any technical specification not covered in the relevant I.S Specifications, CPHEEO manuals, National Building Code and Orissa Detailed standard Specification, I.R.C. and MOS&T Code etc., the specification given by the Consultant/Purchaser/IDCO is final and binding on the contractor. 3. Every tenderer must examine the detailed specification of Orissa Public Works Department, relevant IS specifications, CPHEEO manuals and provisions in National Building code and IRC, MOS&T specification before submitting his tender. The right is reserved with the Corporation without impairing the contract to make such increase or decrease in the quantities or items of work mentioned in the schedule of quantities attached to the tender notice as may by considered necessary to complete the work fully and satisfactorily. Such increase/decrease shall in no case invalidate the contract or rates. However, increase in quantity of any particular item upto 25% of the tendered quantity the rate quoted/accepted will remain in force. It shall be definitely understood that the Corporation does not accept any responsibility of the correctness or completeness of the quantities shown in the schedule. The schedule is liable to alternation by omission or addition or deduction and such omissions, additions and deductions shall in no case invalidate the contract and no extra monetary compensation will be entertained. At any point of time, the contract can be terminated if so desired by the Corporation before 30 days of the proposed date of termination. In the event of such termination, the Contractor shall not be entitled to any monetary compensation whatsoever. 4. It is the responsibility of the Contractor to ensure production of quality concrete of required strength and durability which shall be ascertained by the regular field and Laboratory tests in accordance with IS: 516 and other relevant Indian Standards. All cost involving such test shall be borne by the Contractor. 73

(i)<br />

(j)<br />

(k)<br />

(l)<br />

Provision is made <strong>for</strong> safe drinking water at <strong>the</strong> construction site <strong>for</strong> use by <strong>the</strong><br />

labourers and o<strong>the</strong>r persons <strong>work</strong>ing/ supervising <strong>work</strong>s <strong>the</strong>re.<br />

Wastage of construction water is avoided.<br />

As far as practicable dust-preventing masks, safety belts and helmets, industrial<br />

gloves etc. are provided to <strong>the</strong> <strong>work</strong>ers to avoid possible accidents and physical<br />

injuries to <strong>the</strong>m.<br />

First Aid Box is kept to attend to minor injuries immediately.<br />

(m)<br />

The address and telephone numbers of <strong>the</strong> nearest Police Station, Fire Brigade and<br />

Hospital are recorded on a display board <strong>for</strong> in<strong>for</strong>mation of all concerned.<br />

The Contractor should take all necessary steps as mentioned above without any additional claim to<br />

<strong>the</strong> Corporation.<br />