15. No overhead lines should be erected while doing rein<strong>for</strong>cement on concreting <strong>work</strong>s.<br />
16. Be<strong>for</strong>e locking of any room it should be checked by <strong>the</strong> watchman if any <strong>work</strong>ers are<br />
inside.<br />
17. ESI insurance should be obtained <strong>for</strong> <strong>the</strong> labourers by <strong>the</strong> Contractor against any accident.<br />
18. Special Pre-caution <strong>for</strong> operational control <strong>for</strong> <strong>the</strong> construction sites as per functional<br />
procedure of ISO-14001.<br />
(a)<br />
(b)<br />
(c)<br />
(d)<br />
(e)<br />
(f)<br />
(g)<br />
(h)<br />
The approach to <strong>the</strong> construction site is accessible and relatively free <strong>for</strong> plying of<br />
materials, transport vehicles as well as vehicle of <strong>work</strong>ers/ supervisors and<br />
inspecting officials.<br />
During dry wea<strong>the</strong>r, regular sprinkling of water is done in <strong>the</strong> construction areas to<br />
ensure control of suspended particles like dust etc.<br />
The construction materials like bricks/ laterite stone/ metal/ chips/ steel rods/ sand<br />
etc. are stacked/ stored in proper manner in identified locations. Cement is stored in<br />
a proper shed as per BIS Code.<br />
Construction water/ seepage water is properly drained out to avoid water logging in<br />
<strong>the</strong> construction areas.<br />
Solid waste/ debris are collected and dumped at identified locations be<strong>for</strong>e disposal<br />
<strong>the</strong>reof at designated places/ areas. This locations is barricaded so as to ensure<br />
that <strong>the</strong> waste materials like, broken glass, pointed nails, steel scraps with sharp<br />
edge etc. do not cause physically injuries to <strong>the</strong> <strong>work</strong>ers or supervisor or visitors.<br />
Reusable materials like empty containers, empty cement bags, wooden/ steel<br />
centering, shuttering plates/ planks etc. are properly stacked <strong>for</strong> carrying those to<br />
o<strong>the</strong>r construction sites/ Central Stores.<br />
The vehicles which carry debris/ excess earth etc. from <strong>the</strong> construction sites are<br />
not allowed to be over loaded nor <strong>the</strong>se vehicles are allowed to speed up beyond a<br />
given speed limit so as to ensure that <strong>the</strong>se materials do not get spilled during<br />
transportation and <strong>the</strong>reby pollute <strong>the</strong> atmosphere.<br />
Dug-up areas/ pits, openings on upper floors are properly barricaded to avoid<br />
accident to <strong>work</strong>ers/ o<strong>the</strong>rs.<br />
71