SPECIAL TERMS & CONDITIONS FOR SAFETY MEASURES 1. The Contractor shall barricade all openings near his work place properly. 2. The Contractor should use sand materials for staging and shuttering work. It should be strong enough to take the load. If staging and shuttering work are to be executed on filled up area, care should be taken to see that the filed up earth/sand are properly rammed. 3. The Contractor shall provide temporary hand rails to al staircases for use by the workers and supervising officers. 4. The temporary staircases made during concreting should be strong enough for movement of workers with materials. 5. During de-shuttering operation suitable care should be taken so that the shuttering materials will not fall on any body. 6. All external and internal scaffolding works for plastering, painting etc. are to be done properly. Safety belts should be used by the worker while working. 7. Any other safety measures that may be required during construction should also be taken in addition to the measures mentioned above. 8. The Contractor should have one First Aid Box at the site to provide First Aid to the workers. 9. Suitable steps should be taken for any fire during execution of work either from direct fire or from electric fire. 10. Suitable lighting arrangement should be made during execution of the work. 11. The Rod and other materials should be properly kept so that they do not interfere in execution of work. 12. The Contractor shall not keep any labour inside the incomplete building during construction. 13. Temporary electric lines should be properly drawn and all labour should be instructed to be very careful while using the same. 14. Safety helmets should be used by the worker and supervision during execution of the work. 70
15. No overhead lines should be erected while doing reinforcement on concreting works. 16. Before locking of any room it should be checked by the watchman if any workers are inside. 17. ESI insurance should be obtained for the labourers by the Contractor against any accident. 18. Special Pre-caution for operational control for the construction sites as per functional procedure of ISO-14001. (a) (b) (c) (d) (e) (f) (g) (h) The approach to the construction site is accessible and relatively free for plying of materials, transport vehicles as well as vehicle of workers/ supervisors and inspecting officials. During dry weather, regular sprinkling of water is done in the construction areas to ensure control of suspended particles like dust etc. The construction materials like bricks/ laterite stone/ metal/ chips/ steel rods/ sand etc. are stacked/ stored in proper manner in identified locations. Cement is stored in a proper shed as per BIS Code. Construction water/ seepage water is properly drained out to avoid water logging in the construction areas. Solid waste/ debris are collected and dumped at identified locations before disposal thereof at designated places/ areas. This locations is barricaded so as to ensure that the waste materials like, broken glass, pointed nails, steel scraps with sharp edge etc. do not cause physically injuries to the workers or supervisor or visitors. Reusable materials like empty containers, empty cement bags, wooden/ steel centering, shuttering plates/ planks etc. are properly stacked for carrying those to other construction sites/ Central Stores. The vehicles which carry debris/ excess earth etc. from the construction sites are not allowed to be over loaded nor these vehicles are allowed to speed up beyond a given speed limit so as to ensure that these materials do not get spilled during transportation and thereby pollute the atmosphere. Dug-up areas/ pits, openings on upper floors are properly barricaded to avoid accident to workers/ others. 71
- Page 19 and 20: (iii) The rights of the Owner to re
- Page 21 and 22: 6. The Contractor shall make good a
- Page 23 and 24: GENERAL INFORMATION 1. SCOPE OF WOR
- Page 25 and 26: 7. TENDER PRICES 7.1 The contractor
- Page 27 and 28: 8. Contractors responsibility: a) T
- Page 29 and 30: h) Centering, shuttering as require
- Page 31 and 32: Penalty levied for any delay which
- Page 33 and 34: In the event of the authorized offi
- Page 35 and 36: Besides above, 5% ( five per cent)
- Page 37 and 38: Inform the authorized officer of th
- Page 39 and 40: eyond the reach of measurement any
- Page 41 and 42: a) The authorized person of the Cor
- Page 43 and 44: The expression “words” of “wo
- Page 45 and 46: suffered by a worker or workers by
- Page 47 and 48: SCOPE OF WORK GENERAL The intent of
- Page 49 and 50: 1.4 Inspection & Testing: For all m
- Page 51 and 52: 10. The surplus earth and debris sh
- Page 53 and 54: PAYMENT BREAK-UP SCHEDULE Sl.No. De
- Page 55 and 56: SPECIAL CONDITION. The contractor s
- Page 57 and 58: NOTES: - SCHEDULE OF ITEMS 1. Detai
- Page 59 and 60: SPECIAL NOTE 1. The rates to be quo
- Page 61 and 62: d) If the rate can not be derived a
- Page 63 and 64: ORISSA INDUSTRIAL INFRASTRUCTURE DE
- Page 65 and 66: 10. When a tender is selected for a
- Page 67 and 68: COMMERCIAL & TECHNICAL INFORMATION
- Page 69: 8. RESIDENT ENGINEER: The contracto
- Page 73 and 74: SPECIAL CONDITIONS FORMING A PART O
- Page 75 and 76: The amount so due as aforesaid shal
- Page 77 and 78: liabilities Civil or Criminal arisi
- Page 79 and 80: him regarding the correctness of th
- Page 81 and 82: ORISSA P.W.D./ ELECTRICITY DEPARTME
- Page 83 and 84: i) Deductions for absence from duty
- Page 85: BILL OF QUANTITY Sl.No. Description
SPECIAL TERMS & CONDITIONS FOR SAFETY MEASURES<br />
1. The Contractor shall barricade all openings near his <strong>work</strong> place properly.<br />
2. The Contractor should use sand materials <strong>for</strong> staging and shuttering <strong>work</strong>. It should be<br />
strong enough to take <strong>the</strong> load. If staging and shuttering <strong>work</strong> are to be executed on filled<br />
up area, care should be taken to see that <strong>the</strong> filed up earth/sand are properly rammed.<br />
3. The Contractor shall provide temporary hand rails to al staircases <strong>for</strong> use by <strong>the</strong> <strong>work</strong>ers<br />
and supervising officers.<br />
4. The temporary staircases made during concreting should be strong enough <strong>for</strong> movement<br />
of <strong>work</strong>ers with materials.<br />
5. During de-shuttering operation suitable care should be taken so that <strong>the</strong> shuttering<br />
materials will not fall on any body.<br />
6. All external and internal scaffolding <strong>work</strong>s <strong>for</strong> plastering, painting etc. are to be done<br />
properly. Safety belts should be used by <strong>the</strong> <strong>work</strong>er while <strong>work</strong>ing.<br />
7. Any o<strong>the</strong>r safety measures that may be required during construction should also be taken in<br />
addition to <strong>the</strong> measures mentioned above.<br />
8. The Contractor should have one First Aid Box at <strong>the</strong> site to provide First Aid to <strong>the</strong> <strong>work</strong>ers.<br />
9. Suitable steps should be taken <strong>for</strong> any fire during execution of <strong>work</strong> ei<strong>the</strong>r from direct fire or<br />
from electric fire.<br />
10. Suitable lighting arrangement should be made during execution of <strong>the</strong> <strong>work</strong>.<br />
11. The Rod and o<strong>the</strong>r materials should be properly kept so that <strong>the</strong>y do not interfere in<br />
execution of <strong>work</strong>.<br />
12. The Contractor shall not keep any labour inside <strong>the</strong> incomplete building during construction.<br />
13. Temporary electric lines should be properly drawn and all labour should be instructed to be<br />
very careful while using <strong>the</strong> same.<br />
14. Safety helmets should be used by <strong>the</strong> <strong>work</strong>er and supervision during execution of <strong>the</strong> <strong>work</strong>.<br />