8. RESIDENT ENGINEER:<br />

The contractor shall engage <strong>for</strong> this <strong>work</strong> competent qualified and authorised Resident<br />

Engineers and Assistants to <strong>the</strong> satisfaction of <strong>the</strong> Engineer-in-charge. The Resident Engineer<br />

shall represent <strong>the</strong> contractor in his absence in receiving directions from Officers of <strong>the</strong> Corporation<br />

which will be binding on <strong>the</strong> Contractor.<br />

9. ATTENTION TO URGENT WORKS:<br />

If any urgent <strong>work</strong> in <strong>the</strong> opinion of Engineer-in-charge becomes necessary to be executed<br />

and <strong>the</strong> contractor is unable and unwilling at once to carry out, <strong>the</strong> Engineer-in-charge may be his<br />

own or through o<strong>the</strong>1r age1ncy carry it out as he may consider necessary. All expenses incurred<br />

on it shall be recoverable from <strong>the</strong> contractor or be adjusted against any sum payable to him.<br />

10. SCAFFOLDING:<br />

Suitable Rigid/Scaffolding as required shall be provided at contractor’s cost <strong>for</strong> <strong>work</strong>men.<br />

For construction, steel plate shuttering/ply wood shuttering should be provided.<br />

11. SAFE MEANS OF ACDESS & VERIFICATION:<br />

Safe means of access shall be provided to all <strong>work</strong>ing plat<strong>for</strong>m and o<strong>the</strong>r <strong>work</strong>ing places<br />

to <strong>the</strong> full satisfaction of Engineer-in-charge of execution of <strong>the</strong> corporation <strong>for</strong> proper verification of<br />

<strong>the</strong> <strong>work</strong>.<br />

12. HEALTH & SANITARY ARRANGEMENTS FOR WORKERS:<br />

The tenderer shall a<strong>bid</strong>e to <strong>the</strong> prevailing model rules of <strong>the</strong> Government of Orissa <strong>for</strong><br />

Health & Sanitary arrangement <strong>for</strong> <strong>work</strong>ers with amendment and addition <strong>the</strong>reto from time to time.<br />

13. GUARANTEE FOR DEFECT LIABILITY PERIOD:<br />

The contractor shall furnish a guarantee to <strong>the</strong> effect that all items of <strong>work</strong>s constructed and<br />

supplied by him shall be free from any defects both in terms of materials and <strong>work</strong>manship <strong>for</strong> a<br />

defect liability period of 12 months from <strong>the</strong> date of commissioning of <strong>the</strong> <strong>work</strong> and taken over by<br />

<strong>the</strong> Corporation. Since <strong>the</strong> structures are mostly of water retaining nature it is <strong>the</strong> responsibility of<br />

<strong>the</strong> contractor to provide total water tightness at own cost & no extra payment in this regard will be<br />

paid.<br />

14. Any o<strong>the</strong>r specifications as required <strong>for</strong> construction of <strong>the</strong> <strong>work</strong>s, <strong>the</strong> same will be decided<br />

by <strong>the</strong> Engineer-in-charge, which will be binding on <strong>the</strong> contractor.<br />