bid document for the work - IDCO

bid document for the work - IDCO bid document for the work - IDCO

20.04.2014 Views

17. The tendered has to furnish the details of work in hand and details of work done during the last three years as per the format furnished below. A) Details of work in Hand: SL. No . Name of the work Total value of the work Aporox.value of the work already executed. Value of the work in hand. Authority under whom executed Remarks. 1 2 3 4 5 6 7 B) Details of past experience. Sl. No. Name of the work. Total agreement value Authority under whom executed. Stipulated Time & period of completion Actual time Period taken For Completion. Remarks. 1 2 3 4 5 6 7. 18. No other terms and conditions as other than those mentioned in the tender documents will be accepted 66

COMMERCIAL & TECHNICAL INFORMATION 1. DRAWING & SPECIFICATIONS: The work will be carried out as per the direction and to the reasonable satisfaction of the Engineer-in-charge in accordance with the approved Drawings, Design and specification. The work will be executed under the supervision of the General Manager (Civil) of the Corporation or any other Officer authorised by him. Such Officer will be deemed to be the Engineer-in-charge of the work. All items of work must be executed in workman like manner in accordance with Orissa Detailed Standard Specification or any other standard specification as prescribed by the Engineerin-charge. 2. MATERIALS TO BE SUPPLIED BY CONTRACTOR: The contractor shall make his own arrangement for procurement of all materials, equipment, tools and plants etc. not supplied by the Corporation, as required in connection with execution of the work. All materials, articles shall be the best of their respective kinds for the work described in the specification and schedule. Samples of materials shall be furnished at the contractor’s expenses to the Engineer-in-charge for testing at laboratory and then approved the same if found fit for the execution of the work . 3. TEST, INSPECTION & REJECTION OF MATERIAL & WORK: The contractor shall provide proper facilities at all times for the testing of materials and inspection of the work by the Engineer-in-charge and the Engineer-in-charge or authorised officer of the Corporation shall have access at all time to the place of storage or manufacturer where materials are being used under the contract to determine the execution is proceeding in accordance with the drawings and specifications. The contractor shall upon demand also furnish the inspection test certificate from the vendor when he is purchasing the materials, in respect of which certificates are usually available. The Engineer-in-charge shall have the power to reject at any stage any material or work he considers defective in quality or material or workmanship. The rejection made at the contractor’s expenses. In case of default, the Engineer-in-charge shall have power to employ and pay other person to carry out the orders at the contractor’s and all expenses thereon shall be borne by the contractor. 67

17. The tendered has to furnish <strong>the</strong> details of <strong>work</strong> in hand and details of <strong>work</strong> done during <strong>the</strong><br />

last three years as per <strong>the</strong> <strong>for</strong>mat furnished below.<br />

A) Details of <strong>work</strong> in Hand:<br />

SL.<br />

No<br />

.<br />

Name of<br />

<strong>the</strong> <strong>work</strong><br />

Total<br />

value of<br />

<strong>the</strong> <strong>work</strong><br />

Aporox.value of<br />

<strong>the</strong> <strong>work</strong> already<br />

executed.<br />

Value of<br />

<strong>the</strong> <strong>work</strong> in<br />

hand.<br />

Authority<br />

under whom<br />

executed<br />

Remarks.<br />

1 2 3 4 5 6 7<br />

B) Details of past experience.<br />

Sl.<br />

No.<br />

Name<br />

of <strong>the</strong><br />

<strong>work</strong>.<br />

Total<br />

agreement<br />

value<br />

Authority<br />

under whom<br />

executed.<br />

Stipulated<br />

Time &<br />

period of<br />

completion<br />

Actual time<br />

Period taken<br />

For<br />

Completion.<br />

Remarks.<br />

1 2 3 4 5 6 7.<br />

18. No o<strong>the</strong>r terms and conditions as o<strong>the</strong>r than those mentioned in <strong>the</strong> tender <strong>document</strong>s will<br />

be accepted<br />

66

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!