bid document for the work - IDCO
bid document for the work - IDCO
bid document for the work - IDCO
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
ORISSA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT<br />
CORPORATION BHUBANESWAR.<br />
GENERAL RULES AND DIRECTION FOR THE<br />
GUIDANCE OF CONTRACTORS<br />
ITEM RATE TENDER & CONTRACT FOR WORKS<br />
1. All <strong>work</strong>s proposed <strong>for</strong> execution by contract will be notified in a <strong>for</strong>m of invitation to <strong>the</strong><br />
Contractors signed by <strong>the</strong> General Manager or any o<strong>the</strong>r officer so authorized by <strong>the</strong><br />
Corporation.<br />
The notice will state <strong>the</strong> <strong>work</strong> to be carried out, <strong>the</strong> date of submitting and opening of tenders<br />
also <strong>the</strong> amount of earnest money to be deposited and any o<strong>the</strong>r <strong>document</strong>s required in<br />
connection with <strong>the</strong> submission of tender signed <strong>for</strong> <strong>the</strong> purpose of identification by <strong>the</strong> General<br />
Manager/Authorized Officer shall be open <strong>for</strong> inspection by <strong>the</strong> Contractor at <strong>the</strong> office of <strong>the</strong><br />
General Manager/Authorized Officer of Orissa Industrial Infrastructure Development<br />
Corporation, Bhubaneswar, during office hours. Tenderers are to go through <strong>the</strong> drawings,<br />
design and specification and o<strong>the</strong>r <strong>document</strong>s and inspect <strong>the</strong> site be<strong>for</strong>e submission of tender.<br />
Each page of <strong>the</strong> tender <strong>document</strong> shall bear <strong>the</strong> signature of <strong>the</strong> Tenderer with seal.<br />
2. In <strong>the</strong> event of <strong>the</strong> tender being submitted by a firm it must be signed separately by each<br />
member <strong>the</strong>reof or in <strong>the</strong> event of <strong>the</strong> absence of any partner, it must be signed on his behalf<br />
by a person holding a power of attorney authorizing him to do so.<br />
3. Receipts <strong>for</strong> payments made on account of <strong>work</strong>, when executed by a firm must also be signed<br />
by <strong>the</strong> several partners, except where <strong>the</strong> contractors are described in <strong>the</strong>ir tender as a firm in<br />
which case <strong>the</strong> receipts must be signed in <strong>the</strong> name of <strong>the</strong> firm by one of <strong>the</strong> partners, or by<br />
some o<strong>the</strong>r person having authority to give effectual receipts <strong>for</strong> <strong>the</strong> firm.<br />
4. The memorandum of <strong>work</strong>s tendered <strong>for</strong> and <strong>the</strong> memorandum of materials to be supplied by<br />
<strong>the</strong> Orissa Industrial Infrastructure Development Corporation, Bhubaneswar and <strong>the</strong>ir issue<br />
rates shall be filled in and completed in <strong>the</strong> office of <strong>the</strong> General Manager/Authorized<br />
Officer be<strong>for</strong>e <strong>the</strong> tender <strong>for</strong>m is issued, if a <strong>for</strong>m is issued to an intending tenderer without<br />
having been so filled in and completed, he shall request <strong>the</strong> office to have this done be<strong>for</strong>e he<br />
completes and delivers his tender.<br />
63