20.04.2014 Views

bid document for the work - IDCO

bid document for the work - IDCO

bid document for the work - IDCO

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

14. The holes in walls, RCC members, etc. shall be made very carefully after prior<br />

permission of <strong>the</strong> authorized officer of <strong>the</strong> Corporation be<strong>for</strong>e laying necessary pipe<br />

lines and <strong>the</strong> same shall be made good as per <strong>the</strong> surrounding surface without any<br />

extra cost, as per <strong>the</strong> satisfaction of <strong>the</strong> authorized officer.<br />

15. The Corporation can omit or add item. Any extra item of to be carried out, <strong>the</strong> rate <strong>for</strong><br />

<strong>the</strong> same shall be decided by <strong>the</strong> Authorized Officer of <strong>the</strong> Corporation as per item<br />

no-6.<br />

16. All <strong>the</strong> fittings of external pipes and sanitary ware shall be fitted in such a way that <strong>the</strong>y<br />

shall be absolutely water tight.<br />

17. All <strong>the</strong> fittings and fixtures shall be of I.S.I/ Approved make.<br />

General Manager(Civil)<br />

<strong>IDCO</strong>, W/S & EC Divn.,BBSR.<br />

62

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!