PREAMBLE TO THE SCHEDULE OF QUANTITIES<br />
1. The quantities given in this Schedule of Quantities are liable to variation. Such variation<br />
in quantities shall not, however, vitiate <strong>the</strong> contract in any way whatsoever and<br />
Contractor shall be paid <strong>for</strong> actual measured quantities of <strong>work</strong> executed by <strong>the</strong>m at <strong>the</strong><br />
rates given in <strong>the</strong> tender.<br />
2. The rate quoted shall include all <strong>the</strong> operations, materials, equipments etc. mentioned<br />
in <strong>the</strong> specifications of respective items of <strong>work</strong> required to complete job.<br />
3. The rate quoted shall include all statutory taxes in <strong>for</strong>ce of local body, State or Central<br />
Govt., such as Entry Tax, VAT, Octroi, Sales Tax, VAT. Contract Sales Tax, Royalty<br />
etc., <strong>the</strong> cost of all carriage of materials, labour, tools and plants, curing and finishing,<br />
centering and shuttering, loading and unloading, storage, insurance and all o<strong>the</strong>r<br />
incidental charges etc. complete.<br />
4. The rates quoted in <strong>the</strong> Schedule of Quantities are to be full and inclusive of <strong>the</strong> <strong>work</strong>s<br />
described in <strong>the</strong> Schedule of Quantities, specification including all costs and expenses<br />
which may be required <strong>for</strong> <strong>the</strong> execution of <strong>the</strong> <strong>work</strong> described toge<strong>the</strong>r with o<strong>the</strong>r<br />
associated items such as general risks, liabilities and obligations, construction of<br />
temporary stores, fencing, watching, lighting, insurance of men and materials, cleaning<br />
of site and building after completion of <strong>work</strong>.<br />
5. The Contractor shall submit various samples of materials <strong>for</strong> <strong>the</strong> <strong>work</strong>. Only such<br />
materials as are approved shall be used in <strong>the</strong> <strong>work</strong>. All samples of approved materials<br />
shall be kept at site in <strong>the</strong> custody of <strong>the</strong> clients and shall be handed over to <strong>the</strong><br />
Contractor after completion of <strong>the</strong> <strong>work</strong>.<br />
6. All extra or additional <strong>work</strong> done by order of Engineer-in-charge shall be valued at <strong>the</strong><br />
rate and prices set out in <strong>the</strong> contract, if applicable.<br />
For extra items where rate is not available in <strong>the</strong> contract <strong>the</strong> rate shall be determined as under.<br />
a) If <strong>the</strong> rate can be derived from similar items existing in <strong>the</strong> contract, it will be derived so.<br />
b) If <strong>the</strong> rate can not be derived from <strong>the</strong> existing item of contract, and <strong>the</strong> rate is existing<br />
in <strong>the</strong> schedule of rate, it will be paid at schedule of rate.<br />
c) If <strong>the</strong> rate is not existing in <strong>the</strong> schedule of rate but can be derived from analogous items<br />
existing in <strong>the</strong> schedule of rate, <strong>the</strong> rate will be derived accordingly.<br />