SPECIAL NOTE<br />
1. The rates to be quoted <strong>for</strong> different items must be inclusive of cost and<br />
carriage of all materials, labour, tools and plants, hire charges, curing and<br />
finishing, scaffoldings, centering and shuttering, Sales Tax, (VAT), Octroi,<br />
E.T, Royalties and all o<strong>the</strong>r local and Central Taxes and duties, insurance<br />
and o<strong>the</strong>r incidental charges etc. complete except where o<strong>the</strong>rwise<br />
specifically mentioned.<br />
2. The <strong>work</strong>s carried out <strong>for</strong> any item of <strong>work</strong> is to be completed as per <strong>the</strong><br />
direction of <strong>the</strong> Authorized Officer of <strong>the</strong> Corporation (herein referred as<br />
Authorized Officer) if not specifically o<strong>the</strong>rwise mentioned in <strong>the</strong> item.<br />
3. Royality on minor minerals used in <strong>the</strong> contract <strong>work</strong> shall be deducted from <strong>the</strong><br />
Contractor's bill at source at rates prescribed as per statutory rules. However, <strong>the</strong><br />
amount deducted towards royalty charges can be refunded to <strong>the</strong> Contractor if<br />
clearance certificate from <strong>the</strong> concerned Departments produced by <strong>the</strong> Contractor<br />
establishing payment of <strong>the</strong> royalty.<br />