bid document for the work - IDCO
bid document for the work - IDCO bid document for the work - IDCO
TECHNICAL SPECIFICATIONS FOR EXECUTION OF DIFFERENT ITEM OF WORKS 1. Concrete shall be with conformity to IS-456/2000 2. Foundation shall be with conformity to IS:1080/1995 3. Cement plastering shall be with conformity to IS:1661/1972 4. Cement concrete shall be with conformity to IS:2571./1970 5. Painting to all surface shall be with conformity to IS:2395/1994 (Part- I & II) 6. Steel painting shall be conformity to IS: 7. Laying & jointing of MS pipes shall be in conformity to IS-5822 -1986 NOTE: Incase of any mistake/error in IS No., the relevant I.S. no. as per BIS to be followed. Signature of contractor 54
SPECIAL CONDITION. The contractor shall abide by the Employee Provident Fund and Miscellaneous Provision Act-1952. He should maintain wages register properly and must obtain Employees Provident Fund Code No. and a clearance from the Regional Provident Fund Authorities to the effect that, he has provided provident fund benefits to his labourers / employees. Cess @ 1% will be deducted from the gross bill of the contractor as per Government Resolution on 12653 dt.15.12.2008 for welfare of construction workers. Sd/- General Manager(Civil) 55
- Page 3 and 4: ORISSA INDUSTRIAL INFRASTRUCTURE DE
- Page 5 and 6: Sl. No Orissa Industrial Infrastruc
- Page 7 and 8: 3 // Memo No. 31/ Dt.11.01.2012 Cop
- Page 9 and 10: TENDER FOR WORKS. I/We hereby tende
- Page 11 and 12: FORM OF BID/TENDER [Note: the Appen
- Page 13 and 14: FORMS AND FORMATS 13
- Page 15 and 16: We, the said Bank, lastly undertake
- Page 17 and 18: forbearance, act or omission on the
- Page 19 and 20: (iii) The rights of the Owner to re
- Page 21 and 22: 6. The Contractor shall make good a
- Page 23 and 24: GENERAL INFORMATION 1. SCOPE OF WOR
- Page 25 and 26: 7. TENDER PRICES 7.1 The contractor
- Page 27 and 28: 8. Contractors responsibility: a) T
- Page 29 and 30: h) Centering, shuttering as require
- Page 31 and 32: Penalty levied for any delay which
- Page 33 and 34: In the event of the authorized offi
- Page 35 and 36: Besides above, 5% ( five per cent)
- Page 37 and 38: Inform the authorized officer of th
- Page 39 and 40: eyond the reach of measurement any
- Page 41 and 42: a) The authorized person of the Cor
- Page 43 and 44: The expression “words” of “wo
- Page 45 and 46: suffered by a worker or workers by
- Page 47 and 48: SCOPE OF WORK GENERAL The intent of
- Page 49 and 50: 1.4 Inspection & Testing: For all m
- Page 51 and 52: 10. The surplus earth and debris sh
- Page 53: PAYMENT BREAK-UP SCHEDULE Sl.No. De
- Page 57 and 58: NOTES: - SCHEDULE OF ITEMS 1. Detai
- Page 59 and 60: SPECIAL NOTE 1. The rates to be quo
- Page 61 and 62: d) If the rate can not be derived a
- Page 63 and 64: ORISSA INDUSTRIAL INFRASTRUCTURE DE
- Page 65 and 66: 10. When a tender is selected for a
- Page 67 and 68: COMMERCIAL & TECHNICAL INFORMATION
- Page 69 and 70: 8. RESIDENT ENGINEER: The contracto
- Page 71 and 72: 15. No overhead lines should be ere
- Page 73 and 74: SPECIAL CONDITIONS FORMING A PART O
- Page 75 and 76: The amount so due as aforesaid shal
- Page 77 and 78: liabilities Civil or Criminal arisi
- Page 79 and 80: him regarding the correctness of th
- Page 81 and 82: ORISSA P.W.D./ ELECTRICITY DEPARTME
- Page 83 and 84: i) Deductions for absence from duty
- Page 85: BILL OF QUANTITY Sl.No. Description
SPECIAL CONDITION.<br />
The contractor shall a<strong>bid</strong>e by <strong>the</strong> Employee Provident Fund and Miscellaneous<br />
Provision Act-1952. He should maintain wages register properly and must obtain<br />
Employees Provident Fund Code No. and a clearance from <strong>the</strong> Regional Provident Fund<br />
Authorities to <strong>the</strong> effect that, he has provided provident fund benefits to his labourers /<br />
employees.<br />
Cess @ 1% will be deducted from <strong>the</strong> gross bill of <strong>the</strong> contractor as per<br />
Government Resolution on 12653 dt.15.12.2008 <strong>for</strong> welfare of construction <strong>work</strong>ers.<br />
Sd/-<br />
General Manager(Civil)<br />
55