f) Cleaning, roughening and plastering with 1:4 CM, 12 mm thick of container outer<br />

wall, cone & bottom dome, columns, Ring Beam, walk way & misc., stair case etc.<br />

all complete, including all materials scaffolding, labour and as per direction of E.I.C.<br />

g) Replacement of hand railing consisting of 32 NB MS post & two layers of 32 NB MS<br />

horizontal runner in walk way along with painting (including all material, scaffolding,<br />

labour & T&) etc. complete & as directed by E.I.C..<br />

h) Repair & painting of stair case hand railing (including all materials, scaffolding,<br />

labour & T&P).<br />

i) Cleaning surface, chipping, sand blasting, removing loose materials, rebaring,<br />

welding application of bond coat, centering shuttering and concrete grouting <strong>for</strong><br />

jacketing, plastering to braces ( including all material, scaffolding, labour & T&P) &<br />

as directed by E.I.C. .<br />

j) External painting to all outer surface with two coats of wea<strong>the</strong>r proof cement paint<br />

over a coat of primer ( including all material, scaffolding, labour & T&P) and as<br />

directed by E.I.C..<br />

k) Plinth protection with CC M20 of 100 mm thick with plaster finish.<br />

l) Painting all pipes with black anti-corrosive paint as per site requirement.<br />

m) Supply and installation of CI manhole cover of 50 mm dia with locking arrangement.<br />

n) Ultrasonic water level indicator with remote display unit complete.<br />

1.2 Site Visit:<br />

The tenderer be<strong>for</strong>e tendering shall inspect <strong>the</strong> site at his own cost in consultation<br />

with Engineer-in-Charge of <strong>work</strong> and shall satisfy himself with regard to <strong>the</strong> nature and<br />

extent of <strong>the</strong> <strong>work</strong> involved, <strong>the</strong> actual site conditions, existing facilities & shall collect any<br />

o<strong>the</strong>r in<strong>for</strong>mation which may be required be<strong>for</strong>e submitting <strong>the</strong> tender. Any claim afterwards<br />

by <strong>the</strong> tenderer shall not be entertained on account of <strong>the</strong> ignorance of <strong>the</strong> site conditions.<br />

1.3 Format Language and Units:<br />

The language of all <strong>document</strong>s shall be in English. Units of measurement in <strong>the</strong><br />

<strong>document</strong>s, on <strong>the</strong> drawings, and <strong>the</strong> submissions shall be in S.I/ Metric Units.<br />

48

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!