CLAUSE - IX :<br />

WORKS TO BE EXECUTED IN ACCORDANCE WITH SPECIFICATION, DRAWING AND<br />

ORDERS ETC. :<br />

The Contractor shall execute <strong>the</strong> whole and every of <strong>the</strong> <strong>work</strong> in <strong>the</strong> most substantial and <strong>work</strong>man<br />

like manner, and both as regards materials and o<strong>the</strong>rwise in every respect in strict accordance with<br />

<strong>the</strong> specification. The Contractor shall also con<strong>for</strong>m exactly, fully and faithfully to <strong>the</strong> designs<br />

drawing and instructions in writing relating to <strong>the</strong> <strong>work</strong> signed by <strong>the</strong> authorized officer of <strong>the</strong><br />

Corporation lodged in his office, and to which <strong>the</strong> Contractor shall be entitled to have access at<br />

such office, <strong>for</strong> <strong>the</strong> purpose of inspection during office hours and <strong>the</strong> Contractor shall, if he so<br />

require, be entitled at his own expenses to make or cause to be made copies of <strong>the</strong> specifications,<br />

and of all such designs, drawings and instructions as a<strong>for</strong>esaid.<br />

CLAUSE - X:<br />

DO NOT INVALIDATE CONTRACTS:<br />

The authorized officer of <strong>the</strong> Corporation shall have power to make any alterations minor addition<br />

to <strong>the</strong> original specifications drawings, designs and instructions, that may appear to him necessary<br />

and advisable during <strong>the</strong> progress of <strong>work</strong> and <strong>the</strong> Contractor shall be bound to carry out <strong>the</strong> <strong>work</strong><br />

in accordance with any instructions which may be given to him writing signed by <strong>the</strong> authorized<br />

officer of <strong>the</strong> Corporation and such alteration shall not invalidate <strong>the</strong> contract and any additional<br />

<strong>work</strong> which <strong>the</strong> Contractor may be directed to do in <strong>the</strong> manner above specified as part of <strong>the</strong> <strong>work</strong><br />

shall be carried out by <strong>the</strong> Contractor on <strong>the</strong> same conditions in all respects on which he agreed to<br />

do <strong>the</strong> main <strong>work</strong>, and at <strong>the</strong> same rates as are specified in <strong>the</strong> tender <strong>for</strong> <strong>the</strong> main <strong>work</strong>.<br />

EXTENSION OF TIME IN CONSEQUENCE OF ALTERATIONS :<br />

The time <strong>for</strong> <strong>the</strong> completion of <strong>the</strong> <strong>work</strong> shall be extended in <strong>the</strong> proportion that <strong>the</strong> additional <strong>work</strong><br />

bears to <strong>the</strong> original contract <strong>work</strong> and <strong>the</strong> certificate of <strong>the</strong> authorized officer of <strong>the</strong> Corporation<br />

shall be conclusive as to such proportion.<br />

RATES OF WORK NOT IN ESTIMATE OR SCHEDULE OF RATES<br />

OF ORISSA :<br />

OF THE GOVERNMENT<br />

And if <strong>the</strong> additional <strong>work</strong> includes any class of <strong>work</strong> <strong>for</strong> which no rate is specified in this contract,<br />

<strong>the</strong>n such class of <strong>work</strong> shall be carried out at <strong>the</strong> rates entered in <strong>the</strong> current sanctioned schedule<br />

of rates of <strong>the</strong> Government of Orissa <strong>for</strong> <strong>the</strong> locality during <strong>the</strong> period when <strong>the</strong> <strong>work</strong> is being<br />

carried on by adding/ subtracting only <strong>the</strong> differential cost of cement, steel, octroi, royalty and<br />

contract tax, no difference of labour rates is to be considered and if such last mentioned class of<br />

<strong>work</strong> is not entered in <strong>the</strong> current schedule of rates of <strong>the</strong> Government of Orissa <strong>the</strong>n <strong>the</strong><br />

Contractor shall within seven days of <strong>the</strong> date of his receipt of <strong>the</strong> order to carry out <strong>the</strong> <strong>work</strong><br />