bid document for the work - IDCO
bid document for the work - IDCO
bid document for the work - IDCO
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
h) Centering, shuttering as required <strong>for</strong> all concrete <strong>work</strong>.<br />
i) Bending, binding, tying <strong>the</strong> grill and placing in position, including supply of all<br />
materials and labour etc.<br />
j) To provide water and power required <strong>for</strong> construction, testing and<br />
commissioning.<br />
k) Testing of materials and <strong>work</strong>s as per specification and direction.<br />
Signature of Tenderer.<br />
General Manager (Civil)<br />
29