20.04.2014 Views

bid document for the work - IDCO

bid document for the work - IDCO

bid document for the work - IDCO

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

h) Centering, shuttering as required <strong>for</strong> all concrete <strong>work</strong>.<br />

i) Bending, binding, tying <strong>the</strong> grill and placing in position, including supply of all<br />

materials and labour etc.<br />

j) To provide water and power required <strong>for</strong> construction, testing and<br />

commissioning.<br />

k) Testing of materials and <strong>work</strong>s as per specification and direction.<br />

Signature of Tenderer.<br />

General Manager (Civil)<br />

29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!