20.04.2014 Views

bid document for the work - IDCO

bid document for the work - IDCO

bid document for the work - IDCO

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1.Validity of Offer<br />

2.Scope of Work<br />

3.Measurement of<br />

Rein<strong>for</strong>cement Steel.<br />

4.Testing of<br />

Materials<br />

5.Agreement<br />

6.Construction<br />

Water & Power<br />

G E N E R A L C O N D I T I O N S<br />

The tender submitted by <strong>the</strong> tenderer shall remain valid <strong>for</strong> acceptance <strong>for</strong><br />

a period of 120 days (One hundred twenty) days from <strong>the</strong> date of opening<br />

of tender.<br />

The E.S.R. should totally leak proof of water from container and entire<br />

repair <strong>work</strong> of concrete, plaster, stair including painting etc. all complete<br />

and as per direction of E.I.C. The technical specification <strong>for</strong> each items of<br />

<strong>work</strong> has been furnished separately in <strong>the</strong> Tender <strong>document</strong>. The <strong>work</strong> is<br />

inclusive of testing & commissioning strictly as per IS Specification/ EIC.<br />

Measurement of rein<strong>for</strong>cement steel will be done as per ISI standard<br />

weight. Nothing Extra will be paid <strong>for</strong> rolling factor<br />

All cost of mandatory testing of construction materials (as per ISS) will be<br />

borne by <strong>the</strong> Contractor.<br />

On acceptance of tender, <strong>the</strong> successful tender will have to execute<br />

agreement with latest addition and alternation made till <strong>the</strong> date of opening<br />

of <strong>the</strong> tender paper in non-judicial stamp paper of Rs.100.00 & sufficient<br />

cartridge paper which will be given by <strong>the</strong> tenderer<br />

The Contractor shall have to arrange water and power himself so as to execute<br />

<strong>the</strong> <strong>work</strong> as per <strong>the</strong> time schedule. Nothing extra will be paid on this<br />

account.The consumption of cement will be calculated as per latest OPWD<br />

analysis of rate. The Contractor has to make arrangement <strong>for</strong> keeping cement<br />

in his store. Watch and ward is to be maintained by <strong>the</strong> Contractor.The<br />

Engineer-in-charge or his representative reserves <strong>the</strong> right to check <strong>the</strong> store<br />

at any time. The Contractor has to maintain a proper stock book showing daily<br />

consumption and balance etc.<br />

7. The contractor has to make his own arrangement <strong>for</strong> approach road to <strong>the</strong><br />

<strong>work</strong> site etc. as required.<br />

26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!