20.04.2014 Views

bid document for the work - IDCO

bid document for the work - IDCO

bid document for the work - IDCO

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SPECIAL CONDITION<br />

1. Notwithstanding any o<strong>the</strong>r condition in DTCN, No water will normally be supplied by<br />

Corporation. The Contractor is to arrange water <strong>for</strong> <strong>the</strong> <strong>work</strong> at his own cost. The Contractor will<br />

lay <strong>the</strong> pipeline net<strong>work</strong> required <strong>for</strong> <strong>the</strong> construction purpose at his own cost. No delay in<br />

construction is permissible on <strong>the</strong> ground of paucity of water. If <strong>the</strong> water is availed from <strong>the</strong><br />

Corporation source by <strong>the</strong> Contractor, water charges will be levied as per prevailing rate and <strong>the</strong><br />

amount will be recovered from his bill. Service roads are to be constructed by Contractor at his<br />

own cost.<br />

2. No time extension will be granted on <strong>the</strong> ground of scarcity of water, communication,<br />

material and machinery etc.<br />

3. Any site dispute arising during execution of <strong>the</strong> <strong>work</strong> shall be solved by <strong>the</strong> contractor at his<br />

own cost . <strong>IDCO</strong> will , however, provide assistance to solve such disputes on <strong>the</strong> request of <strong>the</strong><br />

contractor. Dismantling of small structures constructed unauthorizedly by over <strong>the</strong> pipe line<br />

alignment shall be done by <strong>the</strong> contractor at his own cost. No extra payment shall be made by<br />

<strong>IDCO</strong> towards site dispute/dismantling of unauthorized constructions as stated above . The<br />

contractor may at his cost visit <strong>the</strong> site of <strong>work</strong> and get himself acquainted with <strong>the</strong> site condition<br />

be<strong>for</strong>e tendering <strong>for</strong> <strong>the</strong> <strong>work</strong>.<br />

4. The responsibility to locate Govt. approved quarry and burrow area lies with <strong>the</strong> Contractor.<br />

5. Wherever levels are to be taken it will be <strong>the</strong> responsibility of Contractor to get <strong>the</strong> same<br />

done through concerned Junior Engineer and checked by <strong>the</strong> Dy.Manager(Civil)/Joint Manager<br />

(Civil)<br />

6. The Contractor will submit a detailed programme of completion of <strong>work</strong> with methodology<br />

<strong>for</strong> execution of each item of <strong>work</strong> at <strong>the</strong> time of execution of agreement.<br />

7. All machineries will be arranged by <strong>the</strong> Contractor at his own cost in proper time.<br />

8. The Contractor shall a<strong>bid</strong>e by <strong>the</strong> relevant Act like Minimum wages, Employees Provident<br />

Fund, ESI etc. and Rules and Regulations in <strong>for</strong>ce of <strong>the</strong> state of Orissa from time to time <strong>for</strong> <strong>the</strong><br />

labour employed in construction <strong>work</strong>. The contractor shall be fully and solely responsible <strong>for</strong> any<br />

compensation/ fine that may be imposed <strong>for</strong> violation of <strong>the</strong> said Rules/Regulations/Act.<br />

9 For any bad quality of <strong>work</strong> <strong>the</strong> amount of award given by any consumer court/ judicial court<br />

will be recovered from <strong>the</strong> executing Contractor.<br />

10. Where <strong>the</strong> agreement rates are more than 25% of <strong>the</strong> estimated rate, no extra quantity<br />

beyond <strong>the</strong> agreement quantity should be executed without <strong>the</strong> prior written approval of competent<br />

authority of <strong>IDCO</strong>.<br />

11. Additional per<strong>for</strong>mance security shall be deposited by <strong>the</strong> successful <strong>bid</strong>der when <strong>the</strong> <strong>bid</strong><br />

amount is seriously unbalanced i.e. less than <strong>the</strong> estimated cost by more than 10%. In such<br />

an event <strong>the</strong> successful <strong>bid</strong>der will deposit <strong>the</strong> additional per<strong>for</strong>mance security to <strong>the</strong><br />

amount of <strong>the</strong> differential cost of <strong>the</strong> <strong>bid</strong> amount and 90% of <strong>the</strong> estimated cost in shape of<br />

Bank draft or Bank Guarantee of any nationalized Bank.<br />

22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!