SECURITY DEPOSIT BANK GUARANTEE PROFORMA IN LIEU OF SECURITY DEPOSIT Bank Guarantee to be executed on non-judicial stamped paper worth Rs.40.00 (Rupees forty only). 1. In consideration of the ____________________, Orissa Industrial Infrastructure Development Corporation (hereinafter called “The Corporation having agreed to allow (M/s___________________) (hereinafter called “the said Contractor_________________ terms and conditions of an agreement no. ( _______________________date _________________ ) made between the Corporation and (M/s______________________) for supply of materials ( as detailed in the said agreement) and for the due fulfillment by the said contractor(s) of the terms and conditions contained in the said agreement, on production of Bank Guarantee for Rs._____________) we (______________________) (hereinafter referred to “the Bank”) do hereby undertake to pay the Corporation an amount not exceeding Rs.__________ against any loss or damage caused to or suffered by or would be caused or suffered by the Corporation by reason of any breach by the said contractor(s) of any of the terms of conditions contained in the said agreement. 2. We (_________________________) do hereby undertake to pay the amounts due and payable under this guarantee without any demur, merely on a demand from the Corporation Stating that the amount claimed is due from the Corporation Stating that the amount claimed is due by way of loss or damage caused to or suffered by the Corporation by reason of any breach by the said contractor (s) of any of the terms and conditions contained in the said agreement or by reason of the contractor (s) failure to perform the said agreement. Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the Bank under this guarantee. However, our liability under this guarantee shall be restricted to an amount not exceeding Rs. ____________. 3. We (___________________________________) further agree that the guarantee herein contained shall remain in full force and effect during the period that would be taken for the performance of the said agreement and that it shall continue to be enforceable till all the dues of the Corporation under or by virtue of the said agreement have been fully paid and its claims satisfied or discharged or the (___________________________), Orissa Industrial Infrastructure Development Corporation, certifies that the terms and conditions of the said agreement have been full and properly carried out by the said contractor(s) and the guarantee shall then be in-effective. Unless a demand or claim under this guarantee is made on us in writing or before the (_________________________)we shall be discharged from all liability under this guarantee thereafter. 4. We (_____________________________) further agree that the corporation shall have the fullest liberty without our consent and without affecting in any manner our obligations hereunder to vary any of the terms and conditions of the said agreement or to extend time of performance by the said contractors and we shall not be relieved from our liability by reason of any such variation, or extension being granted to the said contractor(s) or for any 16

forbearance, act or omission on the part of the Corporation or any indulgence by the Corporation to the said contractor(s) or by any such matter or thing whatsoever which under the law relating to sureties would but for this provision have effect of so relieving us. 5. We (_______________________________) lastly undertake not to revoke this guarantee during its currency. 6. Not withstanding what is stated above the guarantee is valid upto (___________________________________) from the date of execution and our liability therein is limited to a maximum of Rs._______________ unless a suit or an action to enforce a claim under the guarantee is filed against (___________________________________________________ ) on or before (___________________________) all rights of the Orissa Industrial Infrastructure Development Corporation, under the guarantee, shall be forfeited and the said Bank shall be released and discharged from all liabilities there under. Date at _____________________ the _________________________ day of _______________________ two thousand ___________________. N.B. : 1. Name of the supplier. 2. Number and date of order/agreement. 3. Name of the Bank. 4. Name of the Division Office. 5. Validity period or date up to which the guarantee is valid. Signature of the Constituent Authority of the Bank With Seal 17

SECURITY DEPOSIT<br />

BANK GUARANTEE PROFORMA IN LIEU OF SECURITY DEPOSIT<br />

Bank Guarantee to be executed on non-judicial stamped paper worth Rs.40.00 (Rupees <strong>for</strong>ty only).<br />

1. In consideration of <strong>the</strong> ____________________, Orissa Industrial Infrastructure Development<br />

Corporation (hereinafter called “The Corporation having agreed to allow<br />

(M/s___________________) (hereinafter called “<strong>the</strong> said Contractor_________________<br />

terms and conditions of an agreement no.<br />

( _______________________date<br />

_________________ ) made between <strong>the</strong> Corporation and (M/s______________________)<br />

<strong>for</strong> supply of materials ( as detailed in <strong>the</strong> said agreement) and <strong>for</strong> <strong>the</strong> due fulfillment by <strong>the</strong><br />

said contractor(s) of <strong>the</strong> terms and conditions contained in <strong>the</strong> said agreement, on production<br />

of Bank Guarantee <strong>for</strong> Rs._____________) we (______________________) (hereinafter<br />

referred to “<strong>the</strong> Bank”) do hereby undertake to pay <strong>the</strong> Corporation an amount not exceeding<br />

Rs.__________ against any loss or damage caused to or suffered by or would be caused or<br />

suffered by <strong>the</strong> Corporation by reason of any breach by <strong>the</strong> said contractor(s) of any of <strong>the</strong><br />

terms of conditions contained in <strong>the</strong> said agreement.<br />

2. We (_________________________) do hereby undertake to pay <strong>the</strong> amounts due and<br />

payable under this guarantee without any demur, merely on a demand from <strong>the</strong> Corporation<br />

Stating that <strong>the</strong> amount claimed is due from <strong>the</strong> Corporation Stating that <strong>the</strong> amount claimed is<br />

due by way of loss or damage caused to or suffered by <strong>the</strong> Corporation by reason of any<br />

breach by <strong>the</strong> said contractor (s) of any of <strong>the</strong> terms and conditions contained in <strong>the</strong> said<br />

agreement or by reason of <strong>the</strong> contractor (s) failure to per<strong>for</strong>m <strong>the</strong> said agreement. Any such<br />

demand made on <strong>the</strong> Bank shall be conclusive as regards <strong>the</strong> amount due and payable by <strong>the</strong><br />

Bank under this guarantee. However, our liability under this guarantee shall be restricted to an<br />

amount not exceeding Rs. ____________.<br />

3. We (___________________________________) fur<strong>the</strong>r agree that <strong>the</strong> guarantee herein<br />

contained shall remain in full <strong>for</strong>ce and effect during <strong>the</strong> period that would be taken <strong>for</strong> <strong>the</strong><br />

per<strong>for</strong>mance of <strong>the</strong> said agreement and that it shall continue to be en<strong>for</strong>ceable till all <strong>the</strong> dues<br />

of <strong>the</strong> Corporation under or by virtue of <strong>the</strong> said agreement have been fully paid and its claims<br />

satisfied or discharged or <strong>the</strong> (___________________________), Orissa Industrial<br />

Infrastructure Development Corporation, certifies that <strong>the</strong> terms and conditions of <strong>the</strong> said<br />

agreement have been full and properly carried out by <strong>the</strong> said contractor(s) and <strong>the</strong> guarantee<br />

shall <strong>the</strong>n be in-effective.<br />

Unless a demand or claim under this guarantee is made on us in writing or be<strong>for</strong>e <strong>the</strong><br />

(_________________________)we shall be discharged from all liability under this guarantee<br />

<strong>the</strong>reafter.<br />

4. We (_____________________________) fur<strong>the</strong>r agree that <strong>the</strong> corporation shall have <strong>the</strong><br />

fullest liberty without our consent and without affecting in any manner our obligations hereunder<br />

to vary any of <strong>the</strong> terms and conditions of <strong>the</strong> said agreement or to extend time of per<strong>for</strong>mance<br />

by <strong>the</strong> said contractors and we shall not be relieved from our liability by reason of any such<br />

variation, or extension being granted to <strong>the</strong> said contractor(s) or <strong>for</strong> any<br />