FORM OF BID/TENDER<br />

[Note: <strong>the</strong> Appendix <strong>for</strong>ms part of <strong>the</strong> Bid/Tender. Bidders/Tenderers are required to fill up all <strong>the</strong><br />

blank spaces in this Form of Bid/Tender and Appendix]<br />

From:<br />

[Name & address of <strong>the</strong> tenderer]<br />

To<br />

The General Manager(Civil),<br />

WS &EC Division,<br />

<strong>IDCO</strong>, <strong>IDCO</strong> Tower,<br />

Bhubaneswar.<br />

Sub: Repair, Renovation of existing Elevated Storage Reservoir (ESR) of capacity 2.00<br />

lakh Ltrs. and 15.00 Mtr. staging including all Civil, Mechanical & PH <strong>work</strong>s at<br />

Kalunga I/E, Rourkela.<br />

1. Having examined <strong>the</strong> Drawings, Conditions of Contract, Specification and Bill of Quantities<br />

<strong>for</strong> <strong>the</strong> execution of <strong>the</strong> above named <strong>work</strong>s, I/We, <strong>the</strong> undersigned, offer to execute,<br />

complete and maintain <strong>the</strong> whole of <strong>the</strong> said <strong>work</strong>s in con<strong>for</strong>mity with <strong>the</strong> said Drawings,<br />

Condition of Contract, Specifications and Bill of Quantities <strong>for</strong> <strong>the</strong> sum of<br />

(Rs................................................. ...................... ...................... .....................) or such<br />

o<strong>the</strong>r sum as may be ascertained in accordance with <strong>the</strong> said Conditions.<br />

2. I/We undertake, if my/our Bid is accepted, to commence <strong>the</strong> <strong>work</strong>s as per stipulation<br />

prescribed in <strong>the</strong> tender <strong>document</strong> and complete and deliver <strong>the</strong> whole of <strong>the</strong> <strong>work</strong>s<br />

comprised in <strong>the</strong> Contract within 03 (Three ) Calendar Mmnths from <strong>the</strong> date of issue of<br />

<strong>work</strong> order .<br />

3. If my/our Bid is accepted I/We will furnish a security in <strong>the</strong> <strong>for</strong>m of Bank Guarantee<br />

(approved <strong>for</strong>m) to be jointly and severally bound with me/us in an amount of 2 (Two)<br />

percent of <strong>the</strong> above named sum in accordance with <strong>the</strong> Conditions of Contract or a<br />

Demand Draft in an amount of 2 (Two) percent of <strong>the</strong> above named sum in accordance with<br />

<strong>the</strong> Conditions of Contract.<br />

4. I/We agree to a<strong>bid</strong>e by this Bid <strong>for</strong> <strong>the</strong> period of 120 (One hundred twenty) days from <strong>the</strong><br />

date of Bid opening prescribed in <strong>the</strong> general rules and guide lines to contractors and it<br />

shall remain binding upon us and may be accepted at any time be<strong>for</strong>e <strong>the</strong> expiration of that<br />

period.<br />