City of Tustin Construction and Demolition Waste Recycling ...

City of Tustin Construction and Demolition Waste Recycling ... City of Tustin Construction and Demolition Waste Recycling ...

17.04.2014 Views

City of Tustin Construction and Demolition Waste Recycling Requirements The City of Tustin requires project applicants to recycle or divert from landfills at least 50% of the waste created by certain projects. • All construction, demolition, and renovation projects valued at $50,000 or greater are required to divert at least 50% of all project-related C&D Debris. • Prior to issuance of any building permit for new construction, renovation, or demolition, the project applicant shall submit a Waste Management Plan to the Building Official. o Applicants are required to pay a non refundable $50 application fee. o City staff must review all waste management plans and approve them when satisfactorily completed. o A $50 dollar per ton refundable deposit is also required prior to the issuance of a permit. • Upon project completion, all permittees are required to submit a report detailing all project related C&D debris collection, disposal and diversion information Project Site Waste Management The City of Tustin recommends that contractors implement project site waste separation practices to insure that recyclable materials are recovered and sent to recycling facilities. Utilizing separate disposal bins for different material types is one method to easily separate materials. If you are utilizing a construction site cleanup crew to collect and remove waste materials, insure that they sort the materials and will take the materials to appropriate recovery and disposal facilities. The City does not recommend the use of municipal mixed waste processing facilities as the recovery rates at these facilities are very low. A list of acceptable facilities is attached to this document. This is not a complete list. Attachments: • Recycling Facilities List • Waste Management Plan Application Form (3 pages) • Waste Management Final Project Report Form (3 pages) If you have any questions regarding this issue, please contact Joe Meyers in the City of Tustin Public Works Department at (714) 573-3173 or at jmeyers@tustinca.org.

<strong>City</strong> <strong>of</strong> <strong>Tustin</strong><br />

<strong>Construction</strong> <strong>and</strong> <strong>Demolition</strong> <strong>Waste</strong><br />

<strong>Recycling</strong> Requirements<br />

The <strong>City</strong> <strong>of</strong> <strong>Tustin</strong> requires project applicants to recycle or divert from<br />

l<strong>and</strong>fills at least 50% <strong>of</strong> the waste created by certain projects.<br />

• All construction, demolition, <strong>and</strong> renovation projects valued at $50,000 or greater<br />

are required to divert at least 50% <strong>of</strong> all project-related C&D Debris.<br />

• Prior to issuance <strong>of</strong> any building permit for new construction, renovation, or<br />

demolition, the project applicant shall submit a <strong>Waste</strong> Management Plan to the<br />

Building Official.<br />

o Applicants are required to pay a non refundable $50 application fee.<br />

o <strong>City</strong> staff must review all waste management plans <strong>and</strong> approve them when<br />

satisfactorily completed.<br />

o A $50 dollar per ton refundable deposit is also required prior to the issuance<br />

<strong>of</strong> a permit.<br />

• Upon project completion, all permittees are required to submit a report detailing all<br />

project related C&D debris collection, disposal <strong>and</strong> diversion information<br />

Project Site <strong>Waste</strong> Management<br />

The <strong>City</strong> <strong>of</strong> <strong>Tustin</strong> recommends that contractors implement project site waste separation<br />

practices to insure that recyclable materials are recovered <strong>and</strong> sent to recycling facilities.<br />

Utilizing separate disposal bins for different material types is one method to easily separate<br />

materials.<br />

If you are utilizing a construction site cleanup crew to collect <strong>and</strong> remove waste materials,<br />

insure that they sort the materials <strong>and</strong> will take the materials to appropriate recovery <strong>and</strong><br />

disposal facilities.<br />

The <strong>City</strong> does not recommend the use <strong>of</strong> municipal mixed waste processing facilities as<br />

the recovery rates at these facilities are very low. A list <strong>of</strong> acceptable facilities is attached<br />

to this document. This is not a complete list.<br />

Attachments:<br />

• <strong>Recycling</strong> Facilities List<br />

• <strong>Waste</strong> Management Plan Application Form (3 pages)<br />

• <strong>Waste</strong> Management Final Project Report Form (3 pages)<br />

If you have any questions regarding this issue, please contact Joe Meyers in the<br />

<strong>City</strong> <strong>of</strong> <strong>Tustin</strong> Public Works Department at (714) 573-3173 or at<br />

jmeyers@tustinca.org.


MATERIALS ACCEPTED<br />

Adams Steel<br />

Facility Name<br />

Aguinaga Fertilizer<br />

All Variety Metals, Inc<br />

Brea Green <strong>Recycling</strong><br />

D&D <strong>Recycling</strong> Incorporated<br />

(Anaheim Plant)<br />

Dan Copp Crushing Corp.<br />

Ewles Materials (Irvine Plant)<br />

Ewles Materials (San Juan<br />

Capistrano Plant)<br />

Ewles Materials (Staton Plant)<br />

Hanson Aggregates<br />

Hanson Aggregates<br />

JP Rebond Wholesalers<br />

Address<br />

3200 East Frontera Street<br />

Appliance<br />

Asphalt<br />

Brick<br />

Carpet<br />

Carpet padding<br />

Concrete<br />

Drywall<br />

Electronic<br />

Equipment<br />

Flooring<br />

Glass<br />

Gravel<br />

Green <strong>Waste</strong><br />

Metal<br />

OCC - Cardboard<br />

Other<br />

Pallets<br />

Plastic<br />

Ro<strong>of</strong>ing<br />

S<strong>and</strong><br />

Soil<br />

Anaheim, CA 92806 X X X X<br />

714-632-2032<br />

16355 <strong>Construction</strong> Cir West<br />

Irvine, CA 92620<br />

949-786-9558<br />

1016 Santiago St.<br />

Santa Ana, CA 92701<br />

714-835-9235<br />

1983 Valencia Ave.<br />

Brea, CA X X<br />

714-529-0100<br />

1651 East Badditt Avenue<br />

Anaheim, CA 92805<br />

X<br />

714-634-9600<br />

1120 North Richfield Road<br />

Anaheim, CA 92807 X X<br />

714-777-6400<br />

16081 <strong>Construction</strong> Circle<br />

Irvine, CA 92606 X X<br />

949-552-6008<br />

32501 Ortega Hwy.<br />

San Juan Capistrano, CA 92675 X X<br />

949-728-0436<br />

8182 Katella Ave.<br />

Staton, CA 90680 X X<br />

714-894-1988<br />

18043 Gothard<br />

Huntington Beach, CA X X<br />

800-300-6120<br />

6145 Santiago Canyon<br />

Orange, CA 92865 X X<br />

800-300-6120<br />

1301 North Hancock St. Unit C<br />

Anaheim, CA 95807<br />

X<br />

714-779-1565<br />

X<br />

Wood


Madison Materials<br />

R. J. Noble<br />

Sun West Metals<br />

Tierra Verde Industries<br />

TVI Gold Coast <strong>Recycling</strong>(part<br />

<strong>of</strong> Tierra Verde Ind.)<br />

1035 East 4th Street<br />

Santa Ana, CA 92701 X X X X X X X X X X X X X X X X X X<br />

714-664-0159<br />

15505 East Lincoln Ave.<br />

Orange, CA 92865 X X X X<br />

714-637-1550<br />

1150 North Anaheim Street<br />

Anaheim, CA 92801-2502<br />

714-635-0470<br />

7973/7982 Irvine Blvd.<br />

Irvine, CA X X<br />

949-551-0363<br />

7973 Irvine Blvd.<br />

Irvine, CA 92618 X X X X X X X X X X X X X X X X X<br />

949-551-0363<br />

X


<strong>Construction</strong> & <strong>Demolition</strong> Debris <strong>Waste</strong> Management<br />

PROJECT APPLICATION<br />

A <strong>Waste</strong> Management Plan must be completed for all <strong>Construction</strong> <strong>and</strong> <strong>Demolition</strong> projects with a<br />

valuation <strong>of</strong> $50,000 or greater.<br />

Fee: $50 application fee <strong>and</strong> a $50 per ton refundable deposit.<br />

Note:<br />

Building or demolition permits projects will not be issued without an approved WMP.<br />

Allow 3-5 business days for processing your WMP.<br />

Submit with Permit Application to:<br />

Building Permit Counter, 300 Centennial Way, <strong>Tustin</strong>, CA.<br />

Or fax to 714.573.3129. If you have questions, please call 714.573.3131 or 3132.<br />

Permit #:<br />

Date:<br />

Project Address (Include floor, suite, etc.):<br />

Contact Name:<br />

Company Name:<br />

Mailing Address:<br />

Phone: Fax: E-mail:<br />

Type <strong>of</strong> Project: New <strong>Construction</strong> Addition/Alteration <strong>Demolition</strong><br />

Type <strong>of</strong> Building: Commercial Single Family Residence Apartment<br />

Tenant Improvement? Yes No<br />

Project Size: sq. ft. Project Valuation $<br />

Estimated Start Date / / Estimated Completion Date / /<br />

Briefly state how waste materials will be h<strong>and</strong>led at your job site to ensure salvage/reuse or<br />

recycling:<br />

For <strong>City</strong> Use Only:<br />

WMP Submitted / /____<br />

PW Staff Initials Review Date: / /<br />

Approved ___ Hold pending addition details _________ Not Approved __ _ ___<br />

Notes:


WASTE DIVERSION CALCULATION<br />

Column A:<br />

Columns B, C, D:<br />

Column E:<br />

List Estimated Quantities <strong>of</strong> waste for each material type (in tons). To convert volume to tons,<br />

use the Materials Conversion Worksheet provided in your packet.<br />

List the estimated quantities to be reused, recycled or disposed.<br />

State the name <strong>of</strong> all vendors or facilities proposed to be used to reuse, recycle or dispose <strong>of</strong><br />

material listed.<br />

Column Totals: Add up all quantities listed in Column A. Do the same for Columns B, C <strong>and</strong> D.<br />

NOTE: Receipts <strong>and</strong>/or weigh tickets must be provided with your Final Project Report.<br />

Material Type<br />

Asphalt & Concrete<br />

PROPOSED WASTE DIVERSION & DISPOSAL<br />

A<br />

Total<br />

Quantity<br />

(tons)<br />

B<br />

Salvage or<br />

Reuse<br />

(tons)<br />

C<br />

<strong>Recycling</strong><br />

(tons)<br />

D<br />

Disposal<br />

(tons)<br />

E<br />

Proposed Destination<br />

(Facility Name <strong>and</strong> <strong>City</strong>)<br />

Brick/ Masonry / Tile<br />

Building Materials (doors,<br />

windows, fixtures, etc.)<br />

Carpet<br />

Carpet Padding / Foam<br />

Cardboard<br />

Ceiling Tile (acoustic)<br />

Drywall (Used)<br />

Drywall (New, unpainted<br />

sheets or scrap)<br />

L<strong>and</strong>scape Debris (brush,<br />

trees, stumps, etc.)<br />

Scrap Metal<br />

Unpainted wood & pallets<br />

Garbage/ Trash<br />

Other (do not include dirt)<br />

Recycled Mixed Debris<br />

(see instructions above)<br />

Column Totals<br />

A B C D E<br />

Fill in the blanks below to determine if you will meet the <strong>City</strong>’s requirement to reduce project waste<br />

disposal by 50% or more:<br />

Column Totals: B + C __ = / A = ___ x 100 = %<br />

Is the percentage listed above greater than or equal to 50%? Yes No<br />

If NO, explain why:<br />

Print Name:<br />

Signature:


MATERIALS VOLUME-TO-WEIGHT<br />

CONVERSION WORKSHEET<br />

This worksheet lists materials typically generated from a construction or demolition project <strong>and</strong> provides<br />

formulas for converting common units (i.e. cubic yards, square feet <strong>and</strong> board feet) to tons. It’s use is required<br />

for preparing your WMP <strong>and</strong> Final Project Report, which require that quantities be provided in tons.<br />

Column I Column II Column III<br />

Material/Category Volume Unit Tons/unit Tons<br />

Asphalt/Concrete<br />

Asphalt (broken) ________ cy x 0.7 = ______________<br />

Concrete (broken) ________ cy x 0.9 = ______________<br />

Concrete (solid slab) ________ cy x 1.2975 = ______________<br />

Sum Total ______________<br />

Brick/Masonry/Tile<br />

Brick (broken) ________ cy x 0.7 = ______________<br />

Brick (whole, palletized) ________ cy x 1.512 = ______________<br />

Masonry block (broken) ________ cy x 0.6 = ______________<br />

Tile ________ sq ft x 0.00175 = ______________<br />

Sum Total ______________<br />

Building Materials (doors,<br />

windows, cabinets, etc.) ________ cy x 0.15 = ______________<br />

Cardboard (flat) ________ cy x 0.05 = ______________<br />

Carpet<br />

By square foot ________ sq ft x 0.0005 = ______________<br />

By cubic yard ________ cy x 0.3 = ______________<br />

Carpet Padding/Foam ________ sq ft x 0.000125 = ______________<br />

Ceiling Tiles<br />

Whole (palletized) ________ sq ft x 0.0003 = ______________<br />

Loose ________ cy x 0.0875 = ______________<br />

Sum Total ______________<br />

Drywall (new or used)<br />

1/2" (by square foot) ________ sq ft x 0.0008 = ______________<br />

5/8” (by square foot) ________ sq ft x 0.00105 = ______________<br />

Demo/used (by cubic yard) ________ cy x 0.25 = ______________<br />

Sum Total ______________<br />

L<strong>and</strong>scape Debris (brush, trees, etc) ________ cy x 0.15 = ______________<br />

Scrape Metal ________ cy x 0.453 = ______________<br />

Unpainted Wood & Pallets<br />

By board foot ________ bd ft x 0.001375 = ______________<br />

By cubic yard ________ cy x 0.15 = ______________<br />

Garbage/Trash ________ cy x 0.175 = ______________<br />

cy = cubic yards sq ft = square foot bd ft = board foot


<strong>Construction</strong> & <strong>Demolition</strong> Debris <strong>Waste</strong> Management<br />

FINAL PROJECT REPORT<br />

This report form must be completed for the all <strong>Construction</strong> <strong>and</strong> <strong>Demolition</strong> projects with a valuation <strong>of</strong><br />

$50,000 or greater.<br />

Note: Project Deposit for major projects will not be released without an approved Final Project Report.<br />

Allow 3-5 business days for processing your Final Project Report. A separate Final Project Report is<br />

required for each building or demolition permit issued.<br />

Submit this Project Report with disposal <strong>and</strong> recycling documentation to:<br />

Building Permit Counter, 300 Centennial Way, <strong>Tustin</strong>, CA.<br />

Or fax to 714.573.3129. If you have questions, please call 714.573.3131 or 3132.<br />

Permit #:<br />

Date:<br />

Project Address (Include floor, suite, etc.):<br />

Contact Name:<br />

Company Name:<br />

Mailing Address:<br />

Phone: Fax: E-mail:<br />

Type <strong>of</strong> Project: New <strong>Construction</strong> Addition/Alteration <strong>Demolition</strong><br />

Type <strong>of</strong> Building: Commercial Single Family Residence Apartment<br />

Tenant Improvement? Yes No<br />

Project Size: sq. ft. Project Valuation $<br />

Actual Start Date / / Completion Date / /<br />

Briefly state how waste materials will be h<strong>and</strong>led at your job site to ensure salvage/reuse or<br />

recycling:<br />

For <strong>City</strong> Use Only:<br />

WM Report Submitted / /____<br />

PW Staff Initials Review Date: / /<br />

Approved ___ Hold pending addition details _________ Not Approved __ _ ___<br />

Notes: ______________________________________________________<br />

_______________________________________________________


WASTE DIVERSION CALCULATION<br />

Column A:<br />

Columns B, C, D:<br />

Column E:<br />

List Actual Quantities <strong>of</strong> waste for each material type (in tons). To convert volume to tons, use<br />

the Materials Conversion Worksheet provided in your packet.<br />

List the estimated quantities to be reused, recycled or disposed.<br />

State the name <strong>of</strong> all vendors or facilities proposed to be used to reuse, recycle or dispose <strong>of</strong><br />

material listed.<br />

Column Totals: Add up all quantities listed in Column A. Do the same for Columns B, C <strong>and</strong> D.<br />

NOTE: Receipts <strong>and</strong>/or weigh tickets must be provided with your Final Project Report.<br />

Material Type<br />

Asphalt & Concrete<br />

Brick/ Masonry / Tile<br />

Building Materials (doors,<br />

windows, fixtures, etc.)<br />

Carpet<br />

Carpet Padding / Foam<br />

Cardboard<br />

Ceiling Tile (acoustic)<br />

Drywall (Used)<br />

ACTUAL WASTE DIVERSION & DISPOSAL<br />

A<br />

Total<br />

Quantity<br />

(tons)<br />

B<br />

Salvage or<br />

Reuse<br />

(tons)<br />

C<br />

<strong>Recycling</strong><br />

(tons)<br />

D<br />

Disposal<br />

(tons)<br />

E<br />

Destination<br />

(Facility Name <strong>and</strong> <strong>City</strong>)<br />

Drywall (New, unpainted<br />

sheets or scrap)<br />

L<strong>and</strong>scape Debris (brush,<br />

trees, stumps, etc.)<br />

Scrap Metal<br />

Unpainted wood & pallets<br />

Garbage/ Trash<br />

Other (do not include dirt)<br />

Recycled Mixed Debris<br />

(see instructions above)<br />

Column Totals<br />

A B C D E<br />

Fill in the blanks below to determine if you have complied with the <strong>City</strong>’s requirement to reduce project<br />

waste disposal by 50% or more:<br />

Column Totals: B + C __ = / A = ___ x 100 = %<br />

Is the percentage listed greater than or equal to 50%? Yes No<br />

If NO, explain why:<br />

Print Name:<br />

Signature:


MATERIALS VOLUME-TO-WEIGHT<br />

CONVERSION WORKSHEET<br />

This worksheet lists materials typically generated from a construction or demolition project <strong>and</strong> provides<br />

formulas for converting common units (i.e. cubic yards, square feet <strong>and</strong> board feet) to tons. It’s use is required<br />

for preparing your <strong>Waste</strong> Management Plan <strong>and</strong> Final Project Report, which require that quantities be provided<br />

in tons.<br />

Column I Column II Column III<br />

Material/Category Volume Unit Tons/unit Tons<br />

Asphalt/Concrete<br />

Asphalt (broken) ________ cy x 0.7 = ______________<br />

Concrete (broken) ________ cy x 0.9 = ______________<br />

Concrete (solid slab) ________ cy x 1.2975 = ______________<br />

Sum Total ______________<br />

Brick/Masonry/Tile<br />

Brick (broken) ________ cy x 0.7 = ______________<br />

Brick (whole, palletized) ________ cy x 1.512 = ______________<br />

Masonry block (broken) ________ cy x 0.6 = ______________<br />

Tile ________ sq ft x 0.00175 = ______________<br />

Sum Total ______________<br />

Building Materials (doors,<br />

windows, cabinets, etc.) ________ cy x 0.15 = ______________<br />

Cardboard (flat) ________ cy x 0.05 = ______________<br />

Carpet<br />

By square foot ________ sq ft x 0.0005 = ______________<br />

By cubic yard ________ cy x 0.3 = ______________<br />

Carpet Padding/Foam ________ sq ft x 0.000125 = ______________<br />

Ceiling Tiles<br />

Whole (palletized) ________ sq ft x 0.0003 = ______________<br />

Loose ________ cy x 0.0875 = ______________<br />

Sum Total ______________<br />

Drywall (new or used)<br />

1/2" (by square foot) ________ sq ft x 0.0008 = ______________<br />

5/8” (by square foot) ________ sq ft x 0.00105 = ______________<br />

Demo/used (by cubic yard) ________ cy x 0.25 = ______________<br />

Sum Total ______________<br />

L<strong>and</strong>scape Debris (brush, trees, etc) ________ cy x 0.15 = ______________<br />

Scrape Metal ________ cy x 0.453 = ______________<br />

Unpainted Wood & Pallets<br />

By board foot ________ bd ft x 0.001375 = ______________<br />

By cubic yard ________ cy x 0.15 = ______________<br />

Garbage/Trash ________ cy x 0.175 = ______________<br />

cy = cubic yards sq ft = square foot bd ft = board foot

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!