15.04.2014 Views

Sea Turtle Recovery Action Plan for Barbados - WIDECAST

Sea Turtle Recovery Action Plan for Barbados - WIDECAST

Sea Turtle Recovery Action Plan for Barbados - WIDECAST

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CEP Technical Report No. 12<br />

BUDGET<br />

Funds to support and expand the monitoring programme and in<strong>for</strong>mation campaign in<br />

<strong>Barbados</strong> are needed. At present, the monitoring is done on a voluntary basis and Bellairs<br />

Research Institute (BRI) contributes towards costs such as are incurred through transport, the<br />

operation of sea water pumps, etc. BRI and the Fisheries Division (Ministry of Agriculture,<br />

Food and Fisheries) share the costs associated with the in<strong>for</strong>mation campaign. The table below<br />

summarizes the funding needed to implement the six activities proposed above.<br />

--------------------------------------------------------------------------------------------------------------------<br />

ITEM COST (US $) TOTAL (US $)<br />

--------------------------------------------------------------------------------------------------------------------<br />

ACTIVITY 1<br />

Technical adviser 10 days @ 200.00/d 2000.00D<br />

Office space 15 days @ 10.00/d 150.00B<br />

Transportation 10 days @ 30.00/d 300.00D<br />

Direction, camera work<br />

and equipment rental 15000.00D<br />

Tape stock 1000.00D<br />

Editing 7500.00D<br />

Script writing 2000.00D<br />

Voice over 500.00D<br />

Subtotal 28450.00<br />

D = Donor contribution 28300.00<br />

B = BRI contribution 150.00<br />

Contingency (10%) 2845.00<br />

TOTAL 31295.00<br />

ACTIVITY 2<br />

Programme co-ordinator 30 days over 6 mo @ 50.00/d 1500.00B<br />

Cellular phone 1500.00D<br />

Telephone operating costs 6 months @ 100.00/mo 600.00D<br />

Mileage 2250 km @ 0.50c/km 1125.00D<br />

Research assistant 6 months @ 750.00/mo 4500.00B<br />

Office space 6 months @ 300.00/mo 1800.00B<br />

<strong>Turtle</strong> tagging equipment 300.00D<br />

Subtotal 11325.00<br />

Page 58

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!