Digitale metoder - IT in Civil Engineering. Aalborg University ...
Digitale metoder - IT in Civil Engineering. Aalborg University ...
Digitale metoder - IT in Civil Engineering. Aalborg University ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Process change: Steel Structures - Data Flow<br />
Yesterday<br />
•The eng<strong>in</strong>eer<br />
reviews the<br />
workshop draw<strong>in</strong>gs<br />
•The contractor<br />
prepares<br />
workshop<br />
draw<strong>in</strong>gs<br />
•The draughtsman<br />
prepares the<br />
detailed design<br />
•The eng<strong>in</strong>eer<br />
designs the steel<br />
structure<br />
•Customer<br />
prepares lay-out<br />
draw<strong>in</strong>gs and<br />
design<br />
conditions<br />
• accumulated risks of <strong>in</strong>troduc<strong>in</strong>g errors<br />
• many repetitions and much wasted time<br />
• slow data flow<br />
• cumbersome implementation of changes<br />
•Control data for<br />
cutt<strong>in</strong>g and drill<strong>in</strong>g<br />
are <strong>in</strong>put <strong>in</strong><br />
workshop<br />
•The steel is passed<br />
through cutt<strong>in</strong>g and<br />
drill<strong>in</strong>g mach<strong>in</strong>ery<br />
•Control is<br />
performed<br />
•Steel members<br />
ready for erection<br />
Slide