11.04.2014 Views

details - Chennai Telephones - BSNL

details - Chennai Telephones - BSNL

details - Chennai Telephones - BSNL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including 5<br />

years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong><br />

BHARAT SANCHAR NIGAM LIMITED<br />

(A Govt of India Enterprise)<br />

(Electrical Wing)<br />

O/o the CHIEF ENGINEER (E)<br />

<strong>BSNL</strong> Electrical zone<br />

No: 56/57, Ayyavoo, Street,<br />

Aminjikarai,<br />

CHENNAI-600 030<br />

Phone: 044-26646363<br />

Fax No: 044-26646644<br />

TENDER DOCUMENT/DNIT<br />

Name of Work: - SITC of 22 Nos 7TR Capacity (Sensible cooling) Micro processor Controlled<br />

precision package AC units for various sites under <strong>Chennai</strong> <strong>Telephones</strong> (Rate Contract)<br />

Name of the Contractor<br />

(To be filled in by the Contractor)<br />

Address<br />

____________________________<br />

____________________________<br />

____________________________<br />

____________________________<br />

_______________Pin.__________<br />

Phone: _____________________<br />

Fax:________________________


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC<br />

units including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

DNIT<br />

Draft NIT.No: 01/CEE/<strong>BSNL</strong>/EZ-CHTD/ 2013-14<br />

49/<strong>BSNL</strong>/ED III/CH/2013-14<br />

Name of work: SITC of 22 Nos 7TR Capacity (Sensible cooling) Micro processor<br />

Controlled precision package AC units for various sites under<br />

<strong>Chennai</strong> <strong>Telephones</strong>. (Rate Contract)<br />

Estimated cost put to tender:Rs.86,65,162/-<br />

Certified that this Draft NIT contains Sixty Eight ( 68 pages only)<br />

SDE (EP)<br />

SW(E)<br />

Draft NIT approved for. Rs.86,65,162/- (Rupees Eighty Six Lakhs Sixty Five thousand<br />

one hundred and sixty two only)<br />

Chief Engineer (E)<br />

<strong>BSNL</strong>, Electrical Zone,CHTD<br />

<strong>Chennai</strong>


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

INDEX<br />

SL NO. DESCRIPTION PAGE NUMBER<br />

1 Index 1<br />

2 Check list 2<br />

3 General Guidelines 5<br />

4<br />

Important Instructions to tenderers downloading the tender document<br />

from website<br />

6<br />

5 Special conditions of contract 7<br />

6 Notice Inviting Tender form – <strong>BSNL</strong> EW 6 13<br />

7 <strong>BSNL</strong> EW – 8 form 18<br />

8 Modifications to <strong>BSNL</strong> EW 6 & EW8 ( two bid system) 19<br />

9 Schedule of Quantities (Unpriced) 29<br />

10 Technical Specification 35<br />

11 General Description of work 36<br />

12 Specifications for Precision Air conditioning package unit 37<br />

13<br />

GENERAL SPECIFICATIONS and CONDITIONS FOR Comprehensive<br />

AMC<br />

44<br />

14 TECHNICAL SPECIFICATIONS FOR COMPREHENSIVE AMC 49<br />

15 Undertaking regarding EPF Provisions 51<br />

16 Undertaking to abide by EW6 & EW8 (Undertaking A) 52<br />

17 Terms of Payment 53<br />

18 Declaration by Contractor 55<br />

19 Annexure-I (Model form of bank guarantee) 56<br />

20<br />

21<br />

Annexure-II (Performance security guarantee bond)<br />

Proforma of schedules<br />

57<br />

61<br />

22 Priced Schedule(Page 58 to 64 to be submitted in Envelope II) 65<br />

23 List of Approved Makes 66<br />

SDE (A&P) DNIT SW (E)<br />

1 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

CHECK LIST<br />

(In case tender document is down loaded from website)<br />

ENVELOPE - I (Duly Sealed):<br />

Pl. Tick (√)<br />

1. Cost of bid document if downloaded from website<br />

2. Self attested copy of PAN Card<br />

3. Self attested copy of EPF Registration certificate (if applicable)<br />

4. Self attested copy of Service Tax registration certificate<br />

5. Self attested copy of Chartered Accountant Certificate for turnover<br />

6. Valid WCT / Sales Tax / VAT registration certificate.<br />

7. Documents establishing the Eligibility criteria:-<br />

The Contractors satisfying the following conditions:<br />

(i) Average annual turnover during the last 3 years, ending 31 st March of the previous<br />

Financial year should be at least 30% of the estimated cost put to tender.<br />

AND<br />

(ii) <strong>BSNL</strong> Corporate Office (Electrical) approved Package AC Manufacturer.<br />

OR<br />

(iii) The dealer authorized by <strong>BSNL</strong> Corporate Office (Electrical) approved Package AC Manufacturers.<br />

The letter of Authorization in Original from the manufacturer will have to be produced by the dealers.<br />

OR<br />

(iii)<br />

Experience of having successfully completed similar works in Central Government/State<br />

Government /Central Autonomous Body/Central Public sector Undertaking during last 7 years<br />

ending last day of month previous to the one in which applications are invited should be<br />

either of the following :-<br />

Three similar successfully completed works each costing not less than the Amount equal to<br />

Rs.9.45 lakhs with Central/Package AC Plant with equipment Module not less than 35 TR<br />

capacity of the Central/Package AC Plant proposed in the NIT.<br />

OR<br />

Two similar successfully completed works each costing not less than the amount equal to Rs.14.18<br />

lakhs with Central/Package AC Plant with equipment Module not less than 35 TR capacity of the<br />

Central/Package AC Plant proposed in the NIT.<br />

OR<br />

One similar successfully completed work costing not less than the amount equal to<br />

Rs.18.91 lakhs with Central/Package AC Plant with equipment Module not less than<br />

35 TR capacity of the Central/Package AC Plant proposed in the NIT.<br />

8. EMD for Rs. 1,73,303/-in the format as per NIT.<br />

SDE (A&P) DNIT SW (E)<br />

2 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

9. Tender document containing the following duly signed in all the pages:<br />

i. Declaration duly signed by the contractor downloading the tender document from the web as per page<br />

No. 52<br />

ii.<br />

iii.<br />

iv.<br />

Duly filled under taking to abide by EW-6 & EW-8 as per Page No.52<br />

Duly filled undertaking for EPF provisions as per Page No.51<br />

Duly filled near relative certificate as per Page No.55<br />

v. Duly signed un-priced schedule as per page no.29 to 35<br />

vi.<br />

Statement of Technical & Commercial deviation from NIT if any<br />

The above check list gives brief information about the documents to be enclosed with the tender document.<br />

For further <strong>details</strong> refer the relevant pages of NIT.<br />

ENVELOPE II (Duly Sealed):<br />

Duly filled & signed Priced schedule (Financial Bid) as per Page No. 61 to 65<br />

Signature of contractor<br />

SDE (A&P) DNIT SW (E)<br />

3 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

CHECK LIST<br />

(In case tender document issued from <strong>BSNL</strong> Division office)<br />

ENVELOPE - I (Duly Sealed):<br />

1. EMD for Rs. 1,73,303/- in the format as per NIT.<br />

Pl. Tick (√)<br />

2. Tender document containing the following duly signed in all the pages:<br />

i. Duly filled under taking to abide by EW-6 & EW-8 as per Page No.52<br />

ii.<br />

iii.<br />

Duly filled undertaking for EPF provisions as per Page No.51<br />

Duly filled near relative certificate as per Page No.55<br />

iv. Duly signed un-priced schedule as per page no.29 to 35<br />

v. Statement of Technical & Commercial deviation from NIT if any<br />

ENVELOPE II (Duly Sealed):<br />

Duly filled & signed Priced schedule (Financial Bid) as per Page No. 61 to 65.<br />

The above check list gives brief information about the documents to be enclosed with the tender document.<br />

For further <strong>details</strong> refer the relevant pages of NIT.<br />

Signature of contractor<br />

SDE (A&P) DNIT SW (E)<br />

4 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

GENERAL GUIDELINES<br />

1. <strong>BSNL</strong> EW-6, Form <strong>BSNL</strong> EW 8, Schedules A to F , special conditions/specifications and drawings<br />

will be issued to intending tenderers only. The Standard Form will not be issued along with<br />

the Tender Documents but the same shall form part of the agreement to be drawn and signed<br />

by the both parties after acceptance of tender. The standard Forms shall be available in<br />

downloadable manner from website http://www.chennai.bsnl.co.in<br />

2. All blanks are confined to Notice Inviting Tender (<strong>BSNL</strong> EW-6 ) and Schedules A to F.<br />

3. Authority approving the Notice Inviting Tenders (NIT) shall fill up all the blanks in <strong>BSNL</strong> EW-6<br />

and in schedules B to F before issue of Tender Papers.<br />

4. The intending tenderers will quote their rates in Schedule A.<br />

The proforma for registers and Schedules A to F are only for information and guidance. These are<br />

not to be filled in the Standard Form. The Schedules with all blanks, duly filled, shall be<br />

separately issued to all intending tenderers for filling and returning the same in the manner<br />

prescribed. The Schedules can also be downloaded from website http://www.chennai.bsnl.co.in<br />

SDE (A&P) DNIT SW (E)<br />

5 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

IMPORTANT INSTRUCTIONS TO TENDERERS DOWNLOADING THE TENDER DOCUMENT FROM WEB SITE<br />

The Tenderers who have down loaded the tenders from the web site, shall read the following important<br />

instructions carefully before quoting the rates and submitting the tender documents:-<br />

1. The tenderer should see carefully and ensure that the tender document containing all the pages as per<br />

the index has been down loaded for making required entries. The balance pages of Standard <strong>BSNL</strong> /<br />

EW8 forms will be attached with the agreement after the award of work. The entire <strong>BSNL</strong> / EW8 clauses<br />

are available in the web site www.chennai.bsnl.co.in in the electrical tenders section for ready<br />

reference.<br />

2. A clear print out of tender document shall be taken on good quality A4 size paper and the printer<br />

settings, etc., shall be such that the document is printed as appearing in the web and without any<br />

change in format, number of pages, etc., and shall also ensure that no page is missing. Only original<br />

computer print out of the document shall be used. Photocopy shall not be accepted.<br />

3. In case of any doubt in the downloaded tender, the same shall be got clarified from the Engineer in<br />

charge calling the NIT before submission.<br />

4. The name of the tenderer shall be filled on the relevant pages of <strong>BSNL</strong> EW 6 form etc., and all the pages<br />

shall be invariably signed. (With stamp)<br />

5. The tenderer shall ensure that the downloaded tender document is properly stitched before submitting<br />

the document.<br />

6. There shall be no correction / addition / alteration / omission made in the text of the downloaded<br />

tender document. If found otherwise, the same shall be treated as non-responsive and rejected.<br />

7. The tenderer shall sign the declaration enclosed before submitting the tender.<br />

8. The tenderer shall submit the tenders in 2 covers marked as No.1 and No.2. the tenderer shall submit<br />

the credentials for meeting the eligibility conditions along with the cost of the tender (in the shape of<br />

Demand Draft) and EMD as detailed in NIT, Un priced Documents (Technical bid) duly filled in all<br />

relevant pages along with a covering letter on his printed letter head stating the <strong>details</strong> of enclosures<br />

in the first cover. The credentials shall be self attested. The second cover shall contain the Financial<br />

bid. The rates and amounts should be filled in the schedule of work attached thereto.<br />

CONTRACTOR<br />

ENGINEER IN CHARGE<br />

SDE (A&P) DNIT SW (E)<br />

6 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

SPECIAL CONDITIONS OF CONTRACT<br />

1.0 I.S STANDARDS<br />

The Air Conditioning equipment and installation shall conform to various standards amended<br />

up to date wherever applicable.<br />

2.0 DRAWING TO BE SUBMITTED FOR APPROVAL<br />

The contractor shall get the following drawings approved before the start of the work:<br />

(a) A dimensional drawing giving complete <strong>details</strong> of the erection of the equipment in plant room<br />

(including condensers, electrical panels and refrigerant piping & <strong>details</strong> of foundations). While<br />

(b)<br />

deciding layout, future expansion, if any, has to be taken in to consideration.<br />

Electric wiring diagrams for all Electrical equipment including controls showing cable sizes and<br />

equipment capacities.<br />

3.0 CO-ORDINATION<br />

Wherever air conditioning work is being carried out by more than one agency, it should be the<br />

aim of different agencies that on their account the work of other agency/agencies is not<br />

delayed. Full cooperation and full coordination is to be extended during progress of work and at<br />

the time of testing by all the agencies.<br />

4.0 COMPLETION DRAWINGS<br />

(a)<br />

The contractor on completion of the work shall submit three sets of following drawings.<br />

1. Plant installation drawing giving complete <strong>details</strong> of the entire equipment including<br />

foundations.<br />

2. Electrical drawings showing cable sizes, equipment capacity, control components and<br />

control outlet.<br />

3. Schematic control drawing giving detailed sequence of operation and notes to explain<br />

the operation of the control circuit.<br />

4. Piping drawing showing all pipes size, valves and fittings.<br />

5. Three sets of service manuals of air conditioning plant including salient features of the<br />

plant.<br />

5.0 COMPLETION OF WORK<br />

The work shall be deemed to have been completed after the fulfillment of the following: -<br />

(a) Physical completion of installation of A.C. system including balancing of air and water circuits<br />

(wherever applicable) and successful trial run of the A.C. system by the contractor for a period<br />

of 7 days subject to a minimum of 120 hours of running during that period in the presence of<br />

representative of Engineer-in-Charge.<br />

(b) Successful completion of the initial Acceptance Testing as per the departmental standards in<br />

the presence of representatives of Engineer-in –Charge, T & D circle and user.<br />

6.0 INSPECTION AT CONTRACTOR’S PREMISES<br />

The Department's authorized representative shall have full powers to inspect drawings of any<br />

portion of the work or examine the materials and workmanship of the plant at the contractor's<br />

works or at any other place from where the material or equipment is obtained. Acceptance of any<br />

material or equipment shall in no way, relieve the contractor of his responsibility for meeting the<br />

requirement of the specifications but shall have to be replaced free of cost by the contractor in<br />

case the equipment or work is found defective or of inferior quality.<br />

7.0 Testing<br />

(i) Routine tests certificate for package unit shall be furnished along with supply of equipment.<br />

(ii) Department may depute representative for inspection of material/equipment and witness the test<br />

at contractors/suppliers works and the firm shall be required to perform routine/type tests for<br />

unit of each type/model of package unit in the presence of Departments' representative. At least<br />

SDE (A&P) DNIT SW (E)<br />

7 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

one week's notice shall be given by the contractor to the department for fixing up inspection and<br />

factory tests.<br />

(iii) For Micro-vee filters and motors etc only routine test certificate from manufacturers shall be<br />

furnished.<br />

(iv) The contractor shall operate, test and adjust all air conditioning system units, fans, motors, all air<br />

handling appliances provided in connection with this installation and shall make all necessary<br />

adjustments of all regulating damper for the purpose of equalization of the flow of air to each<br />

and every outlet and inlet.<br />

(v) A carefully recorded detailed record of the results of these adjustments shall be furnished by the<br />

contractor for approval of the Engineer-in-Charge.<br />

(vi) Following tests at site shall be conducted after completion of the plant.<br />

(A) TRIAL RUN<br />

After installation is complete physically and all adjustments as listed above are carried out, the<br />

plant shall be subjected to trial run. The trial run is to be conducted for a period of 7 days subject<br />

to minimum running of 120 hours in the presence of representative of the Department. During<br />

this test performance, all the equipment and control system shall be checked. Inside conditions<br />

shall also be recorded in this trial run. A record of this test shall be submitted to the Engineer-in-<br />

Charge who shall arrange for capacity testing thereafter.<br />

(B) INITIAL ACCEPTANCE TESTING<br />

After completion of trial run, the plant shall be subjected to initial acceptance testing as per<br />

standards of the department. This testing shall be conducted jointly by the representative of the<br />

Engineer-in-Charge, T&D circle and user. A list of all defects and discrepancies shall be prepared<br />

during the test.<br />

(C) FINAL PERFORMACE TEST CUM SEASONAL TESTS<br />

This test shall be conducted jointly by the representative of the Engineer-in-Charge,<br />

T&D Circle and user as per standards of the Department. The test shall be conducted<br />

between 1st April to 30th September.<br />

(D) The Department shall have the right to operate all equipment in operating Condition whether or not<br />

such equipment has been accepted as complete and satisfactory. Repairs and alteration shall be<br />

made at such time as directed by the Engineer-in-charge.<br />

(E) In special circumstances, the department may have to use the plant to air Condition some areas<br />

even before the completion of whole work. The firm shall cooperate fully under such<br />

circumstances<br />

(F) Wherever relaxations are required, these should be obtained from Superintending Engineer<br />

(Electrical) well before the final performance-cum-capacity test.<br />

(G) All test equipment, the operating personnel, oil and refrigerant required for Testing shall be<br />

supplied by the contractor.<br />

8.0 REJECTION OF DEFECTIVE PLANTS<br />

(a)<br />

(b)<br />

If the completed plant or any portion thereof, before it is taken over, be found defective or fails<br />

to fulfill the intent of the specifications, the contractor shall on receipt of a written notice from<br />

the Engineer-in –Charge, forthwith make good the defective plant.<br />

Should the contractor fail to rectify the defects and or make good the defective plant within a<br />

stipulated time mentioned in the written notice or replace the plant at no extra cost,<br />

department may make good, reject and or replace at the risk and expenses of the contractor,<br />

the whole or any portion of the plant which is defective or fails to fulfill the requirements of the<br />

contract.<br />

SDE (A&P) DNIT SW (E)<br />

8 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

(c)<br />

All equipment shall be tested as per tender specifications. Where test results indicate capacity<br />

less than specified in the equipment schedule, the contractor shall pay to the Department prorata<br />

compensation against each item. No compensation shall be payable, if the short fall is 3%<br />

or less.<br />

9.0 CHANGES IN SPECIFICATIONS<br />

The department reserves the right to make changes in the specifications of the work if in its<br />

opinion the same is found necessary. However such alterations shall be made after mutual<br />

discussion and agreement between the department and the contractor. Any price implication in<br />

this regard shall be mutually discussed and agreed upon, in terms of clause 12 of <strong>BSNL</strong> EW-8<br />

The department as a matter of principle will not permit modification or alterations by the<br />

contractor in the design/specification of any equipment/material. However the same can be<br />

agreed by the department under the exceptional circumstances where:-<br />

(a) The same is necessitated due to non-availability of material/component of Certain specification<br />

or make<br />

OR<br />

(b) Such alterations constitute an improvement in the opinion of the contractor and department.<br />

Prior written approval of the department is necessary before undertaking any<br />

alteration/modification in the specifications of the equipment.<br />

10.0 PACKING, FORWARDING & STORAGE AT SITE:<br />

Before dispatch to site, the equipment/component/materials shall be properly packed so as to<br />

afford protection against transit damages and damages against storage in open areas either at<br />

transporter’s premises or at work site. Special care shall be taken in respect of sensitive item<br />

like heat transfer surface of cooling coils, air-cooled condenser etc. When storage in open area<br />

is inevitable proper waterproof covering shall be provided to protect damages on account of<br />

rainwater etc. However, damaged items shall be replaced as per the direction of Engineer-incharge.<br />

11.0 GUARANTEE & DEFECTS LIABILITY PERIOD:<br />

(a) The Guarantee shall be valid for a period of 12 months after successful initial acceptance test.<br />

The Contractor shall guarantee that all equipment shall be free from any defect due to the<br />

defective materials and bad workmanship and that the equipment shall work satisfactorily and<br />

that the performance and efficiencies of the equipment shall be not less than the guaranteed<br />

values. Any parts found defective during the guarantee period shall be replaced by the<br />

contractor without any charge whatsoever. The services of the contractor’s personnel, if<br />

requisitioned during this period for such work, shall be made available free of any cost to the<br />

Department.<br />

(b) The contractor shall depute his representative to the site within 72 hours of notification of<br />

defects by the department.<br />

(c) A joint inspection report will be made by the department representative and representative of<br />

the firm regarding the nature of defects and remedial action required and time schedule for the<br />

rectification/ remedial action prepared.<br />

(d) In case the contractor fails to depute his representative within 72 hours of notification of<br />

defects or fails to cause remedial action within a reasonable time as decided in the joint<br />

inspection, the department may proceed to do so at the contractor’s risk and expenses without<br />

prejudice to any other right.<br />

(e) Supply of consumables like refrigerant gas due to leakage, oil etc., shall be the responsibility of<br />

the firm.<br />

(f) The following aspects are, however, not covered under the purview of guarantee:-<br />

1. Consequential losses and damages.<br />

(g) Terms and conditions of AMC shall be applicable during guarantee period including imposition of<br />

penalties except that no charges for services provided under guarantee / extended guarantee<br />

SDE (A&P) DNIT SW (E)<br />

9 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

shall be payable. Amount for penalties will be deducted from the pending payments against<br />

supplies or if that amount is insufficient then by invoking the PBG available against Supply and<br />

ITC or AMC or from the charges due for AMC.<br />

12.0 TRAINING OF <strong>BSNL</strong>/DOT PERSONNEL:<br />

The contractor shall arrange to impart the training to the <strong>BSNL</strong>/DOT personnel on the following<br />

aspects prior to provisional take over of the plant:-<br />

(a) Operation of Plant.<br />

(b) Gas charging and pumping down of the system.<br />

(c) Adjustments of settings for microprocessor controls and protection devices.<br />

(d) Preventive maintenance.<br />

13 BYE-LAWS, INDEMNITY AGAINST LIABILITIES:<br />

(a) The contractor shall comply with all bye-laws and regulations of local and statutory authorities having<br />

jurisdiction over the works and shall be responsible for payment of all fee and other charges and<br />

giving/receiving all necessary notices and keep the Engineer-in-charge informed about the notices issued<br />

and received.<br />

(b) The contractor shall indemnify the Department against all claim in respect of patent rights, Design, trade<br />

mark or name of other protected rights in respect of any plant, machine, work or materials used for or in<br />

connection with the works or temporary works and from against all claims, demands, proceedings, costs,<br />

charges and expenses whatsoever in respect of or in relation thereon. The contractor shall defend all<br />

actions arising from such claims and shall himself pay all royalties.<br />

(c) License fees, damages, cost and charges of all and every sort that may be legally incurred in respect<br />

thereof shall be borne by the contractor.<br />

(d) All liabilities/penal recoveries on matters arising out of tax/excise/levies such as incorrect deductions,<br />

discrepancies in the filling up returns, revised assessments by the concerned authorities etc. shall be<br />

borne by the contractor.<br />

(e) It is contractor’s liability to follow all safety procedures in accordance with relevant I.S. amended up to<br />

date during execution of work at site.<br />

14.The price shall be firm and validity of tenders shall be 90 days from the date of Opening of tender.<br />

15. The Department /<strong>BSNL</strong> also reserves the right to enforce curtailment in the quantities of work, if the<br />

contractor defaults in regard to works contract execution.<br />

16.Test certificates excise duty, gate pass and purchase bill for units shall be produced by the firms.<br />

17.The firm shall furnish all the technical catalogues and performance test certificates of the equipments<br />

offered.<br />

18.The firm should clearly indicate the Quantum of Excise Duty Component.<br />

19. CURRENCY OF CONTRACT<br />

a) The contract shall be valid for issue of L.O.I for 12 months after the date of award and also be<br />

extendable by mutual consent for a further period of 3 months.<br />

b) Letter of intent for work(s) will be issued by the SE(E)-II, EC, <strong>BSNL</strong> <strong>Chennai</strong> for <strong>Chennai</strong> Zone in<br />

consultation with CE (E).<br />

Time for completion shall be 3 months from the date of issue of award letter for individual work for<br />

Part – A & Part – B and 72 months for Part – C including 12 months guarantee period after successful<br />

initial Acceptance testing of the work.<br />

20. The rates incorporated in the Rate Contract in respect of different items shall be uniformly applicable to all<br />

works within jurisdiction of <strong>Chennai</strong> <strong>Telephones</strong> irrespective of their geographical locations.<br />

SDE (A&P) DNIT SW (E)<br />

10 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

21. Operation of the Rate Contract is for bonafide departmental use only and is further restricted to only such<br />

works as authorized by the CE (Electl), <strong>Chennai</strong> Electrical Zone. <strong>BSNL</strong> <strong>Chennai</strong> through the D.D.O.<br />

nominated by the Chief Engineer (E), <strong>Chennai</strong> Electrical zone <strong>BSNL</strong>, <strong>Chennai</strong> during the currency of the<br />

Rate Contract.<br />

22. OPERATION OF RATE CONTRACT<br />

(a) The operation of this Rate Contract shall be governed by the General Rules and conditions of the Contract.<br />

(b) Operation of Rate Contract shall be further governed by the following:<br />

1. The master agreement shall be signed between the firm & Superintending Engineer (E) <strong>BSNL</strong> Electrical<br />

Circle-II, <strong>Chennai</strong>.<br />

2. Individual Letter of Intent (LOI) shall be issued by the Superintending Engineer (E) <strong>BSNL</strong> Electrical Circle-II<br />

<strong>Chennai</strong> to the firm giving all <strong>details</strong>.<br />

3. The rate contract shall remain in force for a period of 12 months initially and another 3 months on mutual<br />

acceptance for issue of LOI from the date of award.<br />

4. A schedule of work indicating quantities of various items of works shall be supplied by Suptdg. Engineer (E)<br />

in respect of individual work to the concerned Executive Engineer (E).<br />

5. Formal work contract agreement will be made between the Executive Engineer (E) & the firm on the basis of<br />

specimen agreement & the schedule of work supplied by the Suptdg.Engineer (E).The date of<br />

commencement of individual works shall be reckoned from the date of award.<br />

C. No work shall be undertaken without proper Letter of Intent as per (2) above and Completion of<br />

agreement formality as per (5) above.<br />

23. Set off Clause<br />

Only those payments due to Government against a particular contract agreement shall be deducted from<br />

bills of the same work, and not deductible from other works.<br />

24. Increase/ Decrease of tendered quantity<br />

A) <strong>BSNL</strong> will have the right to increase or decrease up to 25% of the contract value depending upon the<br />

requirement of goods and services specified in the schedule of items without any change in the unit<br />

price or other terms and conditions at the time of award of contract.<br />

B )In exceptional situation where the requirement is of an emergent nature and it is necessary to ensure<br />

continued supplies from the existing vendors, the purchaser reserves the right to place repeat order up<br />

to 50% of the quantities of goods and services contained in the running tender/contract within a period<br />

of twelve months from date of award of work at the same rate or a rate negotiated (downwardly) with<br />

the existing vendors considering the reasonability of rates based on prevailing market conditions<br />

and the impact of reduction in duties and taxes etc.<br />

25. Important Note<br />

“If the contractor fails to commence a work/ works of an R.C., the amount of the earnest money to be<br />

forfeited to the dept. will be @ 2% of the estimated cost of the individual work/ works”.<br />

26. COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT<br />

AMC shall come into effect after completion of guarantee period and shall remain for 5 years. Guarantee of<br />

equipment / Units shall start after successful initial acceptance test..<br />

a) It shall be mandatory for the firms to undertake the Annual maintenance contract for 5 years to be<br />

signed at the time of acceptance of award letter for entire quantity proposed to be ordered. The firm<br />

has to enter into AMC agreement for individual work after issue of award letter.<br />

SDE (A&P) DNIT SW (E)<br />

11 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

b) For this purpose the firm shall quote all inclusive Comprehensive AMC charges for each year. AMC<br />

charges shall be included in evaluation of price bid. It is mandatory to quote yearly charge in Rs. in a<br />

column in Part – C price schedule of tender document.<br />

c) Performance Guarantee:- The firm shall submit a performance bank guarantee towards fulfillment of<br />

obligations under AMC for each work equivalent to 2% of the cost of equipment as per tender or the<br />

first year AMC charge pertaining to that work which ever is higher, in a prescribed proforma. The PBG<br />

shall be submitted at least two months in advance of date of start of AMC. The PBG shall be valid for a<br />

period of six years to cover one year or as specified over and above the 5 years AMC period. The PBG<br />

shall be extendable for a further period as required if there is any delay in start of AMC for any reason.<br />

For the additional equipment, the amount of PBG shall be increased at the same rate as indicated<br />

above, within a time period of one month of the date of such equipment getting covered under AMC.<br />

d) The Performance Bank Guarantee against the Supply & ITC will be released only after submission of<br />

PBG against AMC in each work and fulfillment of other obligations of AMC or Supply & ITC which are<br />

prerequisite for release of the PBG.<br />

e) For the services rendered during the half year, the payment shall be made at the end of each half year.<br />

SDE (A&P) DNIT SW (E)<br />

12 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

Electrical Division: DIVISION III<br />

<strong>BSNL</strong> EW-6<br />

Bharat Sanchar Nigam Limited<br />

(A Government of India Enterprise )<br />

Electrical Wing<br />

Certified that this tender schedule Contains 68 (sixty pages) only<br />

NIT No.:<br />

1. DIVISION: ED-III, <strong>Chennai</strong>.:49/<strong>BSNL</strong>/ED III/CH/2013-14<br />

2. SUB DIVISION:<br />

Notice Inviting Tenders<br />

( As per Tendering Procedure in <strong>BSNL</strong> revised upto date)<br />

01. Tenders in the prescribed form are hereby invited on behalf of the <strong>BSNL</strong> for the work of “ SITC of 22 Nos<br />

7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including 5 years<br />

Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”.<br />

Estimated cost: Rs.86,65,162/-<br />

02. (a) Printed forms of tenders consisting of the detailed plans, complete specifications, the schedule<br />

of quantities of the various classes of works to be done and the set of conditions of contract to be<br />

complied with by the persons whose tender may be accepted, can be purchased, at the Divisional / Sub<br />

divisional office between the hours of 1100 hrs and 1600 hrs. every day except on Sundays and public<br />

Holidays on payment of Rs.1050/- in cash.<br />

(b) The site for the work is available/ or the site for the works shall be made available in parts.<br />

(c) The tender forms can also be downloaded from the website.<br />

(d) Before tendering, the contractor shall inspect the site and fully acquaint himself about the<br />

condition with regard to accessibility of site and site nature and the extend of grounds, working<br />

condition, including stocking of materials, installation of T&P etc., and conditions affecting<br />

accommodation and movement of labour etc., required for the satisfactory execution of the<br />

contract. No claim whatsoever on such account shall be entertained by the <strong>BSNL</strong> in any<br />

circumstances.<br />

03. Tenders which should always be placed in sealed covers with the name of the work written on<br />

the envelope will be received by the Executive Engineer/ Sub Divisional Engineer (Elect.) Division-III<br />

<strong>Chennai</strong> / Sub Division Upto 1500 hours on 01-07-2013 and will be opened by him in his office on the<br />

same day at 1530 hours.<br />

04. The time allowed for carrying out the work will be<br />

a) For Part-A and Part-B 3 (Three) months from the date of issue of award letter for individual work.<br />

b) For Part-C 72 (seventy two) months including 12 months guarantee period after<br />

successful initial acceptance test for individual work.<br />

05. Issue of tender form will be stopped two days before the date fixed for opening of tenders. Tenders will be<br />

sold on working days; no tenders will be sold after 1600 hours.<br />

06.a) Earnest Money amounting to Rs. 1,73,303/- in the form of demand draft/ FDR/ BG/ CDR of a<br />

nationalized/scheduled bank guaranteed by the Reserve Bank of India, drawn in favour of Accounts<br />

Officer, <strong>BSNL</strong> Electrical Division-III, <strong>Chennai</strong> must accompany each tender and each tender should be in two<br />

sealed covers, one cover containing the EMD in proper form ,other eligibility documents & unpriced technical<br />

bid and other cover containing Financial Bid .Each envelope should be super scribed as Tender for the work of ”<br />

SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..”Technical Bid and<br />

Financial Bid respectively, and addressed to Executive Engineer (E)/ Sub Divisional Engineer (Electrical) <strong>BSNL</strong>,<br />

Electrical Division-III, <strong>Chennai</strong>/ Sub Division. The Validity period of EMD is 120 days, from the date of opening of<br />

SDE (A&P) DNIT SW (E)<br />

13 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

tender. In case of e-tendering ,each tender should be in two sealed covers, first containing credentials<br />

for meeting the Eligibility conditions along with the cost of tenders and EMD in proper form, Un priced<br />

Documents (Technical bid) duly filled in all relevant pages and second cover containing Financial Bid of tender<br />

documents. The credentials shall be self attested and certified by any <strong>BSNL</strong> Executive. If not certified by <strong>BSNL</strong><br />

Executive then original documents shall be produced at the time of tender opening. After verification of the<br />

contents of this envelope then second envelope containing the Financial bid document shall be opened.<br />

b) The EMD of all the unsuccessful tenderers shall be released on issue of award letter to the successful<br />

tenderer. This shall be done within one week of award letter.<br />

c) Exemption from payment of earnest money and security deposit by any other unit/ department shall not<br />

hold good for <strong>BSNL</strong>.<br />

07)a) The contractor should submit and confirm Chartered Accountant Certificate in respect of turnover and<br />

other registration certificate [Enlistment in <strong>BSNL</strong>, Electrical License, Sales Tax] with self attested copies as<br />

applicable along with the application on printed letter head for purchase of tender.<br />

b) The contractor shall submit and confirm his permanent account number (PAN) issued by the Income Tax<br />

Department.<br />

c) The tenderer should submit the valid WCT/ Sales Tax/ VAT registration certificate<br />

08.i) Performance Guarantee: The contractor is required to furnish performance guarantee for an amount<br />

equal to 5% of the contract value (Part-A and Part-B) in the form of bank guarantee / CDR/FDR/DD (of a<br />

Nationalized/ Scheduled Bank in a standard format) within two weeks from the date of issue of award<br />

letter. This period can be further extended by the Engineer-in-charge upto a maximum period of 2 weeks on<br />

written request of Contractor. The validity period of the performance security in the form of performance<br />

bank guarantee shall be one year from the date of actual completion of work.<br />

ii) Security deposit:In addition to performance guarantee stated above, a sum @10% of the gross amount of<br />

the bill shall be deducted from each running bill of the contractor till the sum be deducted with the sum<br />

already deposited as earnest money, will amount to security deposit of 5% of the Tendered value of the<br />

work (Part-A and Part-B). (Deduction of security deposit shall be applicable for the value of work under<br />

Part-A and Part-B only. No security deposit shall be deducted for Part-C)<br />

09.The acceptance of a tender will rest with the Chief Engineer(Electrical), <strong>BSNL</strong> <strong>Chennai</strong> <strong>Telephones</strong><br />

Zone,<strong>Chennai</strong>-30, who does not bind himself to accept the lowest tender or any other tender and<br />

reserves to himself the Authority to reject lowest or all the tenders received without assigning any reason.<br />

All tenders in which any of the prescribed conditions are not fulfilled or incomplete in any respect are<br />

liable to be rejected. Tenders with any condition including that of conditional rebates shall be rejected<br />

forthwith summarily.<br />

10. Canvassing in connection with tender is strictly prohibited and the tenders submitted by the contractors<br />

who resort to canvassing will be liable for rejection.<br />

11.The <strong>BSNL</strong> reserves itself the right of accepting the whole or any part of the tender and the tenderer shall be<br />

bound to perform the same at the rates quoted.<br />

12.i) The tenderer should give a certificate that none of his/her relative is employed in <strong>BSNL</strong> units. In case of<br />

proprietorship firm, certificate will be given by the proprietor and for partnership firm certificate will be<br />

given by all the Directors of the company.<br />

ii) Near relatives of all <strong>BSNL</strong> employees either directly recruited or on deputation are prohibited from<br />

participation in tenders and execution of works in the different units of <strong>BSNL</strong>. The near relatives for this<br />

purpose are defined as:<br />

a) Members of a Hindu Undivided family.<br />

b) They are husband and wife.<br />

c) The one is related to the other in the manner as father, mother, son(s) & son's wife(daughter-inlaw),<br />

Daughter(s) & daughter's husband(son-in-law), brother(s) & brother's wife, sister(s) & sister's<br />

husband(brother -in-law).<br />

iii) The company or firm or any other person is not permitted to tender for works in <strong>BSNL</strong> Unit in which<br />

his near relative(s) is(are) posted. The unit is defined as SSA/Circle/Chief Engineer/Chief<br />

Archt./Corporate office for non executive employees and all SSA in a circle including circle office/Chief<br />

Eng./Chief Archt./Corporate office for executive employees (including those called as Gazetted officers at<br />

SDE (A&P) DNIT SW (E)<br />

14 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

present). The tenderer should give a certificate that none of his/her such near relative is working in the units<br />

as defined above where he is going to apply for tender/work, for proprietorship, partnership firms and<br />

limited company certificate shall be given by the authorized signatory of the firm. Any breach of these<br />

conditions by the company or firm or any other person, the tender/work will be Cancelled and earnest<br />

money/performance guarantee will be forfeited at any stage whenever it is so noticed. <strong>BSNL</strong> will not pay<br />

any damages to the company or firm or the concerned person. The company or firm or the person will also<br />

be debarred for further participation in the concerned unit.<br />

The format of the certificate to be given is,<br />

"I………………………………… Son of Shri.………………………..…….…….Resident of……………………... hereby certify<br />

that none of my relative(s) as defined in the tender document is/are employed in <strong>BSNL</strong> unit as per<br />

<strong>details</strong> given in tender document. In case at any stage, it is found that the information given by me is<br />

false/incorrect, <strong>BSNL</strong> shall have the absolute right to take any action as deemed fit/without any prior<br />

intimation to me".<br />

(Seal of the firm) ( Signature of Contractor )<br />

13.No employee in <strong>BSNL</strong>/ Govt. of India is allowed to work as a contractor for a period of two years of his<br />

retirement from service without the prior permission. The contract is liable to be cancelled if either the<br />

contractor or any of his employees is found at any time to be such a person who had not obtained<br />

the permission as aforesaid before submission of tender and engagement in the contractors service.<br />

14.The tender for the works shall not be witnessed by the contractor who himself/themselves has/ have<br />

tendered or who may and has/have tender for the same work. Failure to observe this condition would<br />

render tenders of the contractors tendering as witnessing the tender is/are liable for summarily rejection.<br />

15.It will be obligatory on the part of the tenderer to sign each page of the Schedule of work and the tender<br />

documents for all the component parts and after the work is awarded he will have to enter into a separate<br />

agreement for each component with the officer concerned.<br />

16.Any tender not submitted in proper manner or if it contains too many corrections, over writings of absurd<br />

rates, and absurd amount will be liable to be rejected and the <strong>BSNL</strong> will be at liberty to take such action as it<br />

may deem fit without any reference to the tenderer.<br />

17.The tenders for the work shall remain open for acceptance for a period of 90 days from the date of opening<br />

of the tenders. If any tenderer withdraws his tender before the said period or makes any modification in the<br />

terms and conditions of the tender which is not acceptable to the <strong>BSNL</strong> shall, without prejudice to any other<br />

right of remedy be at liberty to forfeit 50% (fifty percent only) of the said earnest money absolutely.<br />

20.Extension of validity: In case, where the letter of award of work cannot be placed within the validity<br />

period of the tender, the <strong>BSNL</strong> can request all tenderers to extend the validity of their respective tenders<br />

and the Earnest Money deposit by a reasonable period. In such cases, extension of validity of Earnest<br />

Money deposit by 30 days beyond the extended validity date of tender should also be asked for. While<br />

<strong>BSNL</strong> can make the request for extension, the tenderer is free to either extend the validity or refuse the<br />

request to extend the validity.<br />

21.Unsealed tenders will be summarily rejected.<br />

22.The contractor should read the tender documents carefully before submitting the tender.<br />

23.Agreement shall be drawn with the successful tenderer on prescribed form. Tenderer shall quote his rates as<br />

per various terms and conditions of the said form, which will form part of the agreement.<br />

24.The tenderer shall furnish a declaration to this effect (incase downloaded tender) that no<br />

addition/deletion/correction have been made in the tender document submitted and is identical to the<br />

tender document appearing on website. Every page of downloaded tender shall be signed by the<br />

tenderer with stamp (seal ) of his firm /organization.<br />

25.This Notice Inviting Tender shall form part of the Contract document. The successful<br />

tenderer/contractor on acceptance of his tender by the Accepting authority, shall, within 15 days from the<br />

stipulated date of start of the work, sign the contract consisting of:-<br />

SDE (A&P) DNIT SW (E)<br />

15 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

a) The Notice Inviting Tender, all the documents including additional conditions, specifications and drawings,<br />

if any forming the tender as issued at the time of invitation of tender and acceptance thereof<br />

together with any correspondence leading thereto.<br />

b) Standard form.<br />

26. Eligibility criteria:<br />

The Contractors satisfying the following conditions:<br />

(1) Average annual turnover during the last 3 years, ending 31 st March of the previous financial year,<br />

should be at least 30% of the estimated cost put to tender.<br />

AND<br />

(2) <strong>BSNL</strong> Corporate Office (Electrical) approved Package AC Manufacturer.<br />

(OR)<br />

The dealer authorized by <strong>BSNL</strong> Corporate office (Electrical) approved Package AC Manufacturers. The letter of<br />

Authorization in Original from the manufacturer will have to be produced by the dealers.<br />

(OR)<br />

Experience of having successfully completed similar works in Central Government/State Government /Central<br />

Autonomous Body/Central Public sector Undertaking during last 7 years ending last day of month previous to the<br />

one in which applications are invited should be either of the following :-<br />

Three similar successfully completed works each costing not less than the amount equal to Rs.9.45 lakhs with<br />

Central/Package AC Plant with equipment Module not less than 35 TR capacity of the Central/Package AC Plant<br />

Proposed in the NIT.<br />

(OR)<br />

Two similar successfully completed works costing not less than the amount equal to Rs.14.18 lakhs with<br />

Central/Package AC Plant with equipment Module not less than 35 TR capacity of the Central/Package AC Plant<br />

Proposed in the NIT.<br />

(OR)<br />

One similar successfully completed work costing not less than the amount equal to Rs.18.91 lakhs with<br />

Central/Package AC Plant with equipment Module not less than 35 TR capacity of the Central/Package AC Plant<br />

proposed in the NIT.Note: The Price bid will not be opened at all, if the firm fails to submit the documentary<br />

proof for eligibility as said above.<br />

Signature of Executive Engineer<br />

For and on behalf of Bharat Sanchar Nigam Limited.<br />

<strong>BSNL</strong> EW -8<br />

BHARAT SANCHAR NIGAM LIMITED<br />

(A Government of India Enterprise)<br />

SDE (A&P) DNIT SW (E)<br />

16 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

CIRCLE – <strong>BSNL</strong> Electrical Circle-II <strong>Chennai</strong><br />

DIVISION – ED-III, <strong>Chennai</strong><br />

BRANCH : Electrical SUB DIVISION – -------<br />

(A) Tender for the work of:- “<br />

SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including 5 years<br />

Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”.<br />

(i) Issued to (contractor) _____________________________________<br />

(ii) Tender Cost: Rs.1050/-<br />

(iv) Date of application<br />

iii) Receipt No.<br />

(v) Date of issue:<br />

(vi) Signature of officer issuing the documents:<br />

(vii) Designation<br />

(B) (i) To be submitted by (time) 15.00 hours on (date) 01-07-2013 to Executive Engineer(E), <strong>BSNL</strong> Electrical Division-<br />

III, <strong>Chennai</strong><br />

(ii) To be opened in presence of tenderers who may be present at 15.30 hours on 01-07-2013 in the office of<br />

Executive Engineer(E), <strong>BSNL</strong> Electrical Division-III,<strong>Chennai</strong><br />

T E N D E R<br />

1.I/we have read and examined the notice inviting tender, schedule, specifications applicable, Drawings & Designs,<br />

General Rules and Directions, Conditions of Contract, clauses of contract, special conditions, Schedule of Rates and<br />

other documents and Rules referred to in the conditions of contract and all other contents in the tender<br />

document for the work.<br />

2 I/We hereby tender for the execution of the work specified for <strong>BSNL</strong> within the time specified, schedule of<br />

quantities and in accordance in all respects with the specifications, designs, drawings and instructions and other<br />

documents and Rules referred to in the conditions of contract and all other contents in the tender document for the<br />

work.<br />

3. I/We agree to keep the tender open for ninety (90) days from the due date of submission thereof and not to make<br />

any modifications in its terms and conditions.<br />

4.A sum of Rs 1,73,303/- is hereby forwarded in the form of Deposit at call receipt/FDR//Bank guarantee of a<br />

Nationalised /Scheduled Bank as earnest money. If I/We, fail to commence the work specified I/We agree that the<br />

said <strong>BSNL</strong> shall without prejudice to any other right or remedy, be at liberty to forfeit the said earnest money<br />

absolutely and the same may at the option of the competent authority on behalf of <strong>BSNL</strong> be recovered without<br />

prejudice to any other right or remedy available in law out of the deposit in so far as the same may extend in<br />

terms of the said bond and in the event of deficiency out of any other money due to me/us under this contract or<br />

otherwise.<br />

5.Should this tender be accepted, I/W e agree to execute all the works referred to in the tender documents upon<br />

the terms and conditions contained or referred to therein and to carry out such deviations as may be ordered upto<br />

maximum of percentage mentioned in clause 12.3 of the tender form and those in excess of that limit at rates to be<br />

determined in accordance with provisions contained in clause 12.2.<br />

6.I/we agree to furnish to <strong>BSNL</strong> Deposit at call receipt/FDR/ Bank guarantee of a Nationalized/ Scheduled Bank for<br />

an amount equal to 5% of the of the contract value in a standard format within two weeks from the date of<br />

issue of award letter. I/We agree to keep the performance bank guarantee valid for one year from the date of actual<br />

completion of work.<br />

7.I/We hereby declare that I/We shall treat the tender documents drawings and other records connected with the<br />

work as secret/confidential documents and shall not communicate information/derived therefrom to any person<br />

SDE (A&P) DNIT SW (E)<br />

17 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

other than to whom I/We am/are authorized to communicate the same or use the information in any manner<br />

prejudicial to the safety or interest of <strong>BSNL</strong>.<br />

Signature of Witness<br />

(required in the case of contractor’s thumb impression<br />

is given by the contractor in place of signature ) (Signature of contractor )<br />

(Name & Postal address)<br />

Seal of Contractor<br />

Occupation of Witness<br />

Date:<br />

A C C E P T A N C E<br />

The above tender (as modified by you as provided in the letters mentioned hereunder) is<br />

accepted by me for and on behalf of <strong>BSNL</strong> for a sum of Rs. ______ (Rupees<br />

_________________________________________________________ )<br />

The letters referred to below shall form part of this contract Agreement<br />

a)<br />

b)<br />

For & on behalf of <strong>BSNL</strong><br />

Dated<br />

Signature _____________<br />

Designation<br />

SDE (A&P) DNIT SW (E)<br />

18 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

MODIFICATIONS TO NEW <strong>BSNL</strong> EW 6 & EW8<br />

(IN CASE OF TWO BID SYSTEM)<br />

New EW 6<br />

S.<br />

No.<br />

Reference Pg.<br />

No.<br />

1. Para 3 2. Tenders which should always be placed<br />

in sealed covers with the name of the<br />

work written on the<br />

envelope will be received by the<br />

Executive Engineer/ Sub Divisional<br />

Engineer (Elect.) Division/ Sub<br />

Division ……………………………. Upto 1500<br />

hours on ……………………….. and will be<br />

opened by<br />

him in his office on the same day at<br />

1530 hours.<br />

To be read as<br />

Tenders opening:-<br />

Tenders, which should be placed in two sealed<br />

envelopes (marked envelope I & envelope II), in the<br />

manner detailed below, will be received by the<br />

Executive Engineer/Sub Divisional Engineer (Electrical)<br />

Division III, / SubDivision----- <strong>Chennai</strong> -up to 15:00 Hrs<br />

on--------------- and will be opened by him in his office<br />

on the same day at 1530 hours.<br />

Envelope I containing the technical bid,(properly<br />

bound/stitched); earnest money( Earnest money in the<br />

form of CDR/FDR/DD/BG of a nationalized/ scheduled<br />

bank guaranteed by the Reserve Bank of India drawn in<br />

favour of A.O., <strong>BSNL</strong>, Electrical Division,III <strong>Chennai</strong><br />

(Proforma as per Annexure-I)); tender cost (in case<br />

tender is downloaded from the website); and<br />

documents pertaining to eligibility (in case tender is<br />

downloaded from the website); etc. shall be opened on<br />

the due date.<br />

Envelope II containing the price bid (properly<br />

bound/stitched), shall NOT BE OPENED but retained in<br />

sealed unopened condition by the tender opening<br />

authority. The date of opening of financial bid to<br />

Tenderer found eligible shall be intimated separately.<br />

2. Para 3(a) 2. Does Not Exist If a holiday is declared on the tender opening day, the<br />

tender will be opened on the next working day.<br />

3. Para 6(a) 2. Earnest Money amounting to Rupees<br />

…………… in the form of demand draft/<br />

FDR/ BG/ CDR of a<br />

nationalized/scheduled bank<br />

guaranteed by the Reserve Bank of<br />

India, drawn in favour of Accounts<br />

Officer, <strong>BSNL</strong> Electrical Division<br />

…………….. must accompany each<br />

tender and each tender should be in<br />

two sealed covers, one cover<br />

containing the EMD in proper form<br />

and other cover containing tender ,<br />

superscribed as “ Tender for the work<br />

of ……………..” and addressed to<br />

Executive Engineer (E)/ Sub Divisional<br />

Engineer (Electrical) <strong>BSNL</strong>, Electrical<br />

Division/<br />

Sub Division. The Validity period of<br />

EMD is 120 days, from the date of<br />

opening of tender. In case of e-<br />

tendering ,each tender should be in<br />

two sealed coves, first containing<br />

credentials for meeting the Eligibility<br />

conditions alongwith the cost of<br />

tenders and EMD in proper form,<br />

second cover containing tender<br />

The validity period of EMD is 120 days, from the date<br />

of opening of tender.<br />

SDE (A&P) DNIT SW (E)<br />

19 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

4. Para<br />

6(a)(ii)<br />

documents. The credentials shall be<br />

self attested and certified by any <strong>BSNL</strong><br />

Executive. If not certified by <strong>BSNL</strong><br />

Executive then original documents<br />

shall be produced at the time of tender<br />

opening.<br />

After verification of the contents of<br />

this envelope then second envelope<br />

containing the bid document shall<br />

be opened.<br />

3. Does not exist E-TENDERING<br />

• The tender documents consisting of plans,<br />

specifications, schedule of quantities of the<br />

various classes of work to be done and the set<br />

of terms and conditions of the contract to be<br />

complied with by the contractor, whose<br />

tender may be accepted and all other relevant<br />

information / documents / drawings<br />

pertaining to the work can be downloaded for<br />

quoting the tender from our website<br />

www.chennai.bsnl.co.in.<br />

• Submission of tenders:- The bids shall be<br />

submitted as per two envelope system as<br />

described below:<br />

• The tenderer shall submit the tender in two<br />

nos. separate sealed envelopes marked as<br />

Envelope- I and Envelope - II. The name of the<br />

work, name of tenderer, last date of receipt of<br />

tender should be mentioned on each<br />

envelope.<br />

• The envelope-I shall contain the following:-<br />

• Cost of bid documents (which shall not be<br />

refunded, even if bidder is found ineligible for<br />

issue of tender documents) in form of a<br />

separate demand draft of a scheduled Bank or<br />

Nationalized Bank / State Bank guaranteed by<br />

Reserve Bank of India drawn in favour of A.O.,<br />

<strong>BSNL</strong>, Electrical Division-III, <strong>Chennai</strong> (in case<br />

the tender documents are downloaded from<br />

the internet).<br />

• Earnest money in the form of<br />

CDR/FDR/DD/BG of a nationalized/ scheduled<br />

bank guaranteed by the Reserve Bank of India<br />

drawn in favour of A.O., <strong>BSNL</strong>, Electrical<br />

Division-III, <strong>Chennai</strong> (Proforma as per<br />

Annexure-I).<br />

• Self Attested Copy of PAN card issued by I/Tax<br />

Department.<br />

• Self Attested copy of Chartered Accountant<br />

Certificate for turnover.<br />

• Self Attested copy of Service Tax Registration<br />

Certificate<br />

• Self attested Documents for establishing<br />

eligibility. The testimonials regarding the list<br />

of works satisfactorily completed (at least for<br />

the requisite magnitude) should be obtained<br />

from an Officer not below the rank of<br />

SDE (A&P) DNIT SW (E)<br />

20 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

Executive Engineer / Manager in the<br />

organization concerned.<br />

• Self Attested copy of EPF Registration<br />

certificate (if applicable)<br />

• Un priced Documents (Technical bid) duly<br />

filled in all relevant pages and signed with<br />

stamp.<br />

• Statement of Technical and commercial<br />

deviation from NIT in case of any exception<br />

• or deviation from the provisions of NIT.<br />

• The envelope-II shall contain the following:-<br />

• Price Bid with the price break up filled in<br />

numerals and in words and duly signed in all<br />

pages.<br />

• Tenders opening:-<br />

• Tenders, which should be placed in two sealed<br />

envelopes (marked envelope I & envelope II),<br />

in the manner detailed above, will be received<br />

by the Executive Engineer/Sub Divisional<br />

Engineer (Electrical) Division-III, <strong>Chennai</strong> /<br />

SubDivision--------------------------------------up to<br />

15:00 Hrs and will be opened by him in his<br />

office on the same day at 1530 hours.<br />

• Envelope I containing the technical<br />

bid,(properly bound/stitched), earnest money,<br />

tender cost and documents pertaining to<br />

eligibility etc. shall be opened on the due<br />

date.<br />

• Envelope II containing the price bid (properly<br />

bound/stitched), shall NOT BE OPENED but<br />

retained in sealed unopened condition by the<br />

tender opening authority. The date of opening<br />

of financial bid to tenderers found eligible<br />

shall be intimated separately.<br />

5. Para 6(d) 3. Does Not Exist EVALUATION OF TENDER:<br />

• After the opening of Envelope I Technical bids<br />

shall be evaluated by <strong>BSNL</strong>.<br />

• Deviations, objectionable stipulations and<br />

discrepancies, if any, shall be brought to the<br />

notice of the eligible bidders by the <strong>BSNL</strong><br />

while giving a minimum 7 days notice.<br />

• (i)Techno–commercial negotiations will be<br />

conducted with all the bidders to clarify the<br />

deviations vis-à-vis tender specifications /<br />

requirements. After bringing the acceptable<br />

offers on a common platform, all the<br />

commercial terms / conditions and technical<br />

specifications, shall be frozen.<br />

• (ii)The bidders shall be required to submit<br />

their final Technical offer which meets all the<br />

NIT/modified requirement and be free from<br />

deviation and discrepancies. The price bids of<br />

only those tenderers who meet the NIT /<br />

modified requirement shall be opened.<br />

• The firms / vendors shall not be at any stage<br />

allowed to revise / modify the price bid /<br />

SDE (A&P) DNIT SW (E)<br />

21 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

6. Para 7 3. (a) The contractor should submit and<br />

confirm Chartered Accountant<br />

Certificate in respect of turnover<br />

and other registration certificate<br />

[Enlistment in <strong>BSNL</strong>, Electrical License,<br />

Sales Tax] with attested copies<br />

(self attested and counter attested by<br />

any executive of <strong>BSNL</strong>/MTNL or<br />

Gazetted officer of GOI) as<br />

applicable along with the application<br />

on printed letter head for purchase of<br />

tender.<br />

b)The contractor shall submit and<br />

confirm his permanent account<br />

number (PAN) issued by the Income<br />

Tax<br />

Department.<br />

c) The tenderer should submit the valid<br />

WCT/ Sales Tax/ VAT registration<br />

certificate.<br />

quoted prices once submitted with the<br />

tender document.<br />

• All communication with the bidders shall be in<br />

writing. Fax / E-mail shall be covered under<br />

this category and considered as adequate<br />

means of communication.<br />

The tender documents consisting of plans,<br />

specifications, schedule of quantities of the various<br />

classes of work to be done and the set of terms and<br />

conditions of the contract to be complied with by the<br />

contractor, whose tender may be accepted and all<br />

other information/documents/drawings pertaining to<br />

the work will be open for inspection by tenderer and<br />

can be had from the Office of Executive Engineer (E),<br />

<strong>BSNL</strong>, Electrical Division-III, <strong>Chennai</strong> between 11.00<br />

hours & 16.00 hours every working day except on<br />

Sundays and Public Holidays on payment of Rs.1050/-<br />

(Non refundable). The cost of tender documents<br />

deposited along with application for tender issue shall<br />

not be refunded, even if bidder is found ineligible for<br />

issue of tender documents.<br />

The firms shall submit application for issue of tender<br />

documents on its printed letter head, accompanied<br />

with Self Attested Copies of the following documents<br />

in support of fulfilling the eligibility criterion:<br />

a)The testimonials regarding the list of works<br />

satisfactorily completed (at least for the requisite<br />

magnitude) obtained from an Officer not below the<br />

rank of Executive Engineer / Manager in the<br />

organization concerned.<br />

b)Chartered Accountant Certificate for turnover with a<br />

copy of PAN card issued by Income Tax Department.<br />

c)Service Tax Registration Certificate<br />

d)EPF Registration Certificate (if applicable)<br />

7. Para 24(a) 5. Does not Exist i)The conditional tender or tenders with conditional<br />

rebate shall be summarily rejected.<br />

ii)The tenderer shall submit the original computer<br />

printout of the tender documents downloaded from<br />

the internet. Photocopy shall not be accepted.<br />

iii)The Tender documents shall not be sent through the<br />

Courier/Post. Tender documents received through<br />

Courier/post shall not be opened/considered at all.<br />

iv)All communication with the bidders shall be in<br />

writing. Fax / E-mail shall be covered under this<br />

category and considered as adequate means of<br />

communication.<br />

8. Para 25 5. This Notice Inviting Tender shall form<br />

part of the Contract document. The<br />

successful tenderer/contractor<br />

on acceptance of his tender by the<br />

Accepting authority, shall, within 15<br />

days from the stipulated date of<br />

start of the work, sign the contract<br />

consisting of :-<br />

a) The Notice Inviting Tender, all the<br />

documents including additional<br />

conditions, specifications and<br />

The Notice Inviting Tender shall form part of the<br />

contract document, in accordance with clause-1 of the<br />

contract. The contract shall be deemed to have come<br />

into effect on issue of communication of acceptance of<br />

tender. On such communication of acceptance, the<br />

successful tenderer /contractor shall within 15 days<br />

from such date, formally sign the contract consisting<br />

SDE (A&P) DNIT SW (E)<br />

22 of 68<br />

of:-<br />

(a)<br />

The Notice Inviting Tender, all the documents<br />

including additional conditions, specifications<br />

and drawings, if any, forming part of the tender


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

drawings, if any forming the tender as<br />

issued at the time of invitation of<br />

tender and acceptance<br />

Thereof together with any<br />

correspondence leading thereto.<br />

b) Standard form.<br />

(b)<br />

and as issued at the time of invitation of tenders<br />

and acceptance thereof together with any<br />

correspondence leading thereto.<br />

Standard E.W.-8 Form.<br />

9. Para 25(ii) 5. Does not exist EPF PROVISIONS:-<br />

The agency has to comply with the<br />

provisions of EPF and miscellaneous provisions Act-<br />

1952 and employees provident fund scheme-1952 as<br />

amended up to date in respect of<br />

labours/employees engaged by them for this work.<br />

Any consequence arising due to non- complying of<br />

provisions as specified above shall be the sole<br />

responsibility of the firm only. The agency shall give<br />

an undertaking to this effect as per the prescribed<br />

proforma (UNDERTAKING REGARDING EPF<br />

PROVISIONS)<br />

S.<br />

Reference<br />

No<br />

.<br />

1. Para 2 of<br />

“Tender”<br />

2. Para 2 of<br />

“General<br />

Rules and<br />

Directions”<br />

3. Para 14©<br />

of “General<br />

Rules and<br />

Directions”<br />

.<br />

Pg.<br />

No<br />

New EW 8<br />

6. I/We hereby tender for the execution<br />

of the work specified for <strong>BSNL</strong> within<br />

the time<br />

specified, schedule of quantities and in<br />

accordance…<br />

8. …and the amount of performance<br />

guarantee to be deposited by the<br />

successful tenderer(s).<br />

10. For the purpose of evaluation of<br />

financial Bid,composite price inclusive<br />

of all taxes<br />

and levies will be considered .<br />

The unit wise cost /break up is<br />

necessary for the purposes of<br />

information and<br />

verification of composite price so<br />

quoted by the contractor/supplier.<br />

The contractor supplier shall submit<br />

to <strong>BSNL</strong> documents /proof of payment<br />

of al<br />

taxes /levies alongwith exemption<br />

certificate if any ,to avail CENVAT<br />

benefits by<br />

<strong>BSNL</strong><br />

However the evaluation and<br />

comparison of respective bids shall be<br />

done on the<br />

basis of net cost to <strong>BSNL</strong> on the prices<br />

of the goods offered inclusive of duties<br />

and<br />

To be read as<br />

I/We hereby tender for the execution of the work<br />

specified for <strong>BSNL</strong> within the time<br />

specified, as per the schedule of quantities and in<br />

accordance…<br />

…and the amount of performance guarantee to be<br />

deposited by the successful tenderer(s), and the<br />

amount of Security Deposit to be deducted from the<br />

bills.<br />

• The evaluation and comparison of responsive bids<br />

shall be done on the basis of Net cost to <strong>BSNL</strong> on<br />

the prices offered inclusive of duties and taxes (but<br />

excluding CENVAT – able duties & taxes), sales tax,<br />

packing, forwarding, freight and insurance charges<br />

etc., as indicated in the price schedule.<br />

• Vendors should furnish the correct E.D. / Customs<br />

tariff Head in the price schedule. If the credit for the<br />

Duties and Taxes under CENVAT credit rules, 2004 is<br />

found to be not admissible at any stage<br />

subsequently owing to wrong furnishing of Tariff<br />

Head, then the vendors will be liable to refund such<br />

non-admissible amount, if already paid, along with<br />

penalty if charged by the concerned authority.<br />

• In case the Duties & Taxes which are non CENVAT –<br />

able as per the quotes indicated in the price<br />

schedule by the vendors and subsequently at any<br />

stage it is found that Credit for such Duties & Taxes<br />

is admissible as per CENVAT Credit Rules, 2004, then<br />

the vendors will be liable to refund the amount<br />

taxes (but –excluding CENVAT-able equivalent to such Duties & Taxes if already paid to<br />

SDE (A&P) DNIT SW (E)<br />

23 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

duties and taxes) sales<br />

,tax,packing,forwarding<br />

,freight and insurance charges as per<br />

existing <strong>BSNL</strong> policies.<br />

them. However, <strong>BSNL</strong> may allow the supplier to<br />

submit necessary documents in this regard which<br />

may enable <strong>BSNL</strong> to avail the CENVAT credit<br />

provided such credit is still available for the amount<br />

so paid as per CENVAT Credit Rules 2004.<br />

• <strong>BSNL</strong> reserves the right to ask the bidders to submit<br />

documentary proof confirming the correct Tariff<br />

Head from the E.D. / Customs authority where the<br />

Tariff Head furnished against the particular tendered<br />

item by different bidders differs from each other or<br />

the same is found apparently not furnished in<br />

accordance with E.D. / Customs Tariff notifications.<br />

• If the supplier fails to furnish necessary supporting<br />

documents i.e. Excise / Customs invoices etc. in<br />

respect of the Duties / Taxes which are Cenvatable,<br />

the amount pertaining to such Duties / Taxes will be<br />

deducted from the payment due to the firm.<br />

4. Para 25 of<br />

“General<br />

Rules and<br />

Directions”<br />

5. Para 26 of<br />

“General<br />

Rules and<br />

Directions”<br />

.<br />

• Invoice shall clearly indicate break up <strong>details</strong> of<br />

composite price i.e. Basic, E.D., Sales Tax, any other<br />

Duties and Taxes, Freight / Packing Charges, Service<br />

Tax etc.<br />

12. Does not exist Agency has to observe all the labour rules & regulation<br />

in force. Agency shall be fully responsible for any<br />

violation observed at any time.<br />

12 Does not exist<br />

Bye laws Indemnity against liabilities<br />

• The contractor shall comply with all by laws<br />

and regulations of the local and statutory<br />

authorities having jurisdiction over the works<br />

and shall be responsible for payment of all<br />

fees and other charges and giving and<br />

receiving all necessary notices and keep the<br />

Engineer –in-charge informed about the<br />

notices issued and received.<br />

• The contractor shall indemnify the<br />

department against all claims in respect of<br />

patent rights design, trademark or name of<br />

other protected rights in respect of any<br />

plant, machine, work or materials used for or<br />

in connection with the works or temporary<br />

works and from and against all claims<br />

demands, proceedings, costs, charges and<br />

expenses whatsoever in respect of or in<br />

relation thereto. The contractor shall defend<br />

all actions arising from such claims and shall<br />

himself pay all royalties, License fees,<br />

damages , costs and charges of all and every<br />

sort that may be legally incurred in respect<br />

hereof shall be borne by the contractor.<br />

• All liabilities / penal recoveries on matters<br />

arising out of tax/excise /levies such as<br />

incorrect deductions discrepancies in the<br />

filing of returns, revised assessments by the<br />

concerned authorities etc,. shall be borne by<br />

SDE (A&P) DNIT SW (E)<br />

24 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

6. Para 27 of<br />

“General<br />

Rules and<br />

Directions”<br />

.<br />

the contractor.<br />

12. Does not Exist Currency of contract:<br />

Rates quoted by the contractor shall be firm<br />

and shall be valid for the currency of contract.<br />

No cost escalation shall be permitted during<br />

the currency of contract.<br />

7. Para 8.1 of<br />

“Conditions<br />

of<br />

Contract”.<br />

8. Clause 7.3<br />

of “Clauses<br />

of<br />

Contract”.<br />

15. For rate contracts of Electrical<br />

Installation, Air Conditioning, Engine<br />

Alternator, Sub<br />

Station and Fire Detection works,<br />

work/quantities of item of works can<br />

be split amongst<br />

the lowest of three agencies who<br />

agree to the rates decided by <strong>BSNL</strong> in<br />

respect of 1st<br />

lowest in the following manner:-<br />

a) If the work stands distributed<br />

between the first three lowest<br />

tenderers, the<br />

proportion of work distributed shall be<br />

as below:-<br />

50% to the lowest tenderer and<br />

remaining quantities to other two<br />

tenderers in INVERSE RATIO of their<br />

Evaluated price.<br />

b) In case it is decided to split the work<br />

amongst the first two lowest firms, the<br />

proportion of work distribution shall<br />

be as follows:<br />

i) 70% to the first lowest tenderer.<br />

ii) 30% to the second lowest tenderer.<br />

In case the tenderers other than<br />

lowest tenderer does not agree to<br />

match the rates of L1<br />

then 100% works shall be awarded to<br />

the lowest tenderer.<br />

22. Payment to the contractors for Air<br />

Conditioning, Engine Alternator, Sub<br />

Station, Lifts, fire<br />

detection, fire fighting and other<br />

specialised items, during progress of<br />

work, will be<br />

regulated as below :-<br />

a) 80% of prorata of the approved<br />

price breakup of contract value on<br />

receipt of<br />

equipment at site and after<br />

satisfactory physical inspection.<br />

b) 10% of prorata of the approved<br />

price breakup of contract value after<br />

successful<br />

installation of equipment.<br />

c) 5% of the approved contract value<br />

after successful completion of Initial<br />

acceptance testing.<br />

For rate contracts of Electrical Installation, Air<br />

Conditioning, Engine Alternator, Sub<br />

Station and Fire Detection works, work/quantities of<br />

item of works can be split amongst<br />

the lowest agencies who agree to the rates decided by<br />

<strong>BSNL</strong> in respect of 1st<br />

lowest in the following manner:-<br />

Number of Bidders in<br />

whom the order is<br />

proposed to be placed<br />

Distribution of<br />

Quantity<br />

2 (two) L1 shall be given 70%<br />

L2 shall be given 30%<br />

In case lowest evaluated price (L1) is not accepted by<br />

other bidder, <strong>BSNL</strong> reserves the right to award the<br />

entire quantity under this tender on the bidder with<br />

lowest evaluated price.<br />

Deleted<br />

SDE (A&P) DNIT SW (E)<br />

25 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

d) 5% of the approved contract value<br />

after successful completion of the final<br />

acceptance testing.<br />

e) For the works where A/T is not<br />

applicable e.g. for substation, lift, fire<br />

fighting etc.<br />

5% of the approved contract value<br />

shall be released after clearance by<br />

Electrical<br />

inspector/ lift inspector/ Fire officer<br />

respectively.<br />

9. Does not Exist Annexure I<br />

MODEL FORM OF BANK GUARANTEE<br />

(for submitting EMD)<br />

Whereas____________________________<br />

(hereinafter called “the contractor(s)”) has<br />

submitted its Tender dated_________for the<br />

work<br />

________________________________________<br />

________________________________________<br />

____<br />

KNOW ALL MEN by these presents that<br />

WE___________________________<br />

OF___________________________ having our<br />

registered office at_______________________<br />

(hereinafter called “the Bank”) are bound unto<br />

_______________________ (hereinafter called<br />

“the <strong>BSNL</strong>”) in the sum of _________________<br />

for which payment will and truly to be made of<br />

the said <strong>BSNL</strong>, the Bank binds itself, its<br />

successors and assigns by these presents.<br />

THE CONDITIONS of the obligation are:<br />

1. If the Contractor(s) withdraws its<br />

Tender during the period of Tender validity<br />

specified on the Tender Form: or<br />

2. If the Contractor(s) having been<br />

notified of the acceptance of its Tender by the<br />

<strong>BSNL</strong> during the period of Tender validity.<br />

SDE (A&P) DNIT SW (E)<br />

26 of 68<br />

(a)<br />

Fails or refuses to execute the Contract.<br />

(b) Fails or refuses to furnish security<br />

Deposit in accordance with the conditions of<br />

Tender document.<br />

We undertake to pay to the <strong>BSNL</strong> up to the<br />

above amount upon receipt of its first written<br />

demand, without the <strong>BSNL</strong> having to<br />

substantiate its demand, provided that in its<br />

demand, the <strong>BSNL</strong> will note that the amount<br />

claimed by it is due to it owing to the occurrence<br />

of one or both of the two conditions, specifying<br />

the occurred condition or conditions.<br />

This guarantee will remain in force as specified in


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

the Tender Document up to and including Thirty<br />

(30) days after the period of the Tender validity<br />

and any demand in respect thereof should reach<br />

the Bank not later than the specified date/dates.<br />

Signature of the Bank<br />

10<br />

.<br />

Does not exist<br />

Signature of the Witness<br />

Name of Witness<br />

Address of Witness:<br />

ANNEXURE II<br />

PERFORMANCE SECURITY GUARANTEE BOND<br />

In consideration of the CMD, <strong>BSNL</strong> (hereinafter called<br />

‘<strong>BSNL</strong>’) having agreed to exempt<br />

___________________ (hereinafter called ‘the said<br />

contractor(s)’) from the demand under the terms and<br />

conditions of an agreement/Advance Purchase Order<br />

No ___________ dated __________ made between<br />

_________________ and _____________ for the<br />

supply of ________________ (hereinafter called “the<br />

said agreement ”), of security deposit for the due<br />

fulfillment by the said contractor (s) of the terms and<br />

conditions contained in the said Agreement, on<br />

production of the bank guarantee for<br />

________________________we, (name of the bank)<br />

_______________________ ( hereinafter refer to as<br />

“the bank”) at the request of _________________<br />

(contractor(s)) do hereby undertake to pay to the<br />

<strong>BSNL</strong> an amount not exceeding ________________<br />

against any loss or damage caused to or suffered or<br />

would be caused to or suffered by <strong>BSNL</strong> by reason of<br />

any breach by the said Contractor(s) of any of the<br />

terms or conditions contained in the said Agreement.<br />

2. We (name of the bank) ________________ do<br />

hereby undertake to pay the amounts due and<br />

payable under this guarantee without any demur,<br />

merely on a demand from the <strong>BSNL</strong> by reason of<br />

breach by the said contractor(s)’ of any of the terms or<br />

conditions contained in the said Agreement or by<br />

reason of the contractors(s)’ failure to perform the<br />

said Agreement. Any such demand made on the bank<br />

shall be conclusive as regards the amount due and<br />

payable by the Bank under this guarantee where the<br />

decision of <strong>BSNL</strong> in these counts shall be final and<br />

binding on the bank. However, our liability under this<br />

guarantee shall be restricted to an amount not<br />

exceeding __________________<br />

3. We under take to pay to the <strong>BSNL</strong> any money so<br />

demanded notwithstanding any dispute or disputes<br />

raised by the contractor(s)/supplier(s) in any suit or<br />

proceeding pending before any court or tribunal<br />

relating thereto our liability under this present being<br />

absolute and unequivocal. The payment so made by us<br />

under this bond shall be valid discharge of our liability<br />

for payment there under and the<br />

contractor(s)/supplier(s) shall have no claim against us<br />

for making such payment.<br />

4. We( name of the<br />

SDE (A&P) DNIT SW (E)<br />

27 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

bank)_________________________ further agree that<br />

the guarantee herein contained shall remain in full<br />

force and effect during the period that would be taken<br />

for the performance of the said agreement and that it<br />

shall continue to be enforceable till all the dues of the<br />

<strong>BSNL</strong> under or by virtue of the said Agreement have<br />

been fully paid and its claims satisfied or discharged or<br />

till ________________________(office/Department)<br />

<strong>BSNL</strong> certifies that the terms and conditions of the<br />

said Agreement have been fully or properly carried out<br />

by the said contractor(s) and accordingly discharges<br />

this guarantee. Unless a demand or claim under this<br />

guarantee is made on us in writing on or before the<br />

expiry of TWO/TWO AND HALF/THREE YEARS (as<br />

specified in P.O) from the date hereof, we shall be<br />

discharged from all liabilities under this guarantee<br />

thereafter.<br />

5. We (name of the<br />

bank)_________________________ further agree<br />

with the <strong>BSNL</strong> that the <strong>BSNL</strong> shall have the fullest<br />

liberty without our consent and without affecting in<br />

any manner our obligations hereunder to vary any of<br />

the terms and conditions of the said Agreement or to<br />

extend time of performance by the said contractor(s)<br />

from time to time or to postpone for any time or from<br />

time to time any of the powers exercisable by the<br />

<strong>BSNL</strong> against the said Contractor(s) and to forbear or<br />

enforce any of the terms and conditions relating to the<br />

said agreement and we shall not be relieved from our<br />

liability by reason of any such variation, or extension<br />

being granted to the said Contractor(s) or for any<br />

forbearance, act or omission on the part of the <strong>BSNL</strong><br />

or any indulgence by the <strong>BSNL</strong> to the said<br />

Contractor(s) or by any such matter or thing<br />

whatsoever which under the law relating to sureties<br />

would, but for this provision, have effect of so<br />

relieving us.<br />

6. This guarantee will not be discharged due to the<br />

change in the constitution of the Bank or the<br />

Contractor(s)/supplier(s).<br />

7. We (name of the bank) ____________________<br />

lastly undertake not to revoke this guarantee during<br />

its currency except with the previous consent of the<br />

<strong>BSNL</strong> in writing.<br />

Dated the ________________ day of _______ for<br />

__________________________________ (indicate the<br />

name of bank)<br />

SDE (A&P) DNIT SW (E)<br />

28 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including 5 years Comprehensive AMC for various sites under<br />

<strong>Chennai</strong> <strong>Telephones</strong>.<br />

Name of the work :- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including 5 years Comprehensive AMC for various sites under<br />

<strong>Chennai</strong> <strong>Telephones</strong>”..<br />

PART - A : Supply of Equipment<br />

SCHEDULE OF QUANTITIES<br />

Sl.<br />

No<br />

Description of Item<br />

Qty<br />

Basic price exclusive of all<br />

levies & charges<br />

Excise Duty +<br />

Cess/custom duty<br />

Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs.<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14<br />

1 Supply of factory assembled factory tested 7 TR (sensible)<br />

High Precision AC package units [Micro processor based<br />

air cooled unit] complete with upward flow / downward<br />

flow with motorized volume control damper, suitable<br />

mesh in the return air path having energy efficient high<br />

technology with scroll compressor working on R-22<br />

refrigerant in single/double refrigerant circuit, comprising<br />

of indoor & out door units with all components i/c supply<br />

of controls, interlocking, electrical accessories, SPP [for all<br />

three phase motors], voltage & current indications &<br />

sequential controls, communication port with suitable<br />

protocol to suit BMS compatibility but without software,<br />

air cooled condenser with fans each directly driven by<br />

motor having a matching heat rejection duty with heat<br />

rejecting coil constructed from copper tubes with<br />

expanded aluminum fins, MCBs, safety valve, pressure<br />

release valve, data/ communication cable between units<br />

etc. complete as required and as per specifications<br />

attached.<br />

Also See important note no 1 to 13 below.<br />

(Note:1.Top or Bottom feeding air flow<br />

arrangement will be decided as per site<br />

requirement and intimated while issuing separate<br />

letter of indent.<br />

Sales TAX /VAT (see<br />

important note.3 below)<br />

Freight, Insurance,<br />

Packing and forwarding<br />

Any other levies<br />

paid/payable by agency<br />

Unit price inclusive of all<br />

levis & taxes<br />

(4+5+6+7+8)<br />

Duties & Taxes CENVATable<br />

on unit price<br />

Discount offered (if any)/<br />

UNIT<br />

Net cost to <strong>BSNL</strong> per set<br />

(9-10-11)<br />

Total Net cost to <strong>BSNL</strong><br />

(col. 3 X 12)<br />

Total amount inclusive of<br />

all levis & taxes - Discount<br />

offered if any<br />

( (col. 3 x ( col.9- col 11) )<br />

SDE (A&P) DNIT SW (E)<br />

29 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including 5 years Comprehensive AMC for various sites under<br />

<strong>Chennai</strong> <strong>Telephones</strong>”..<br />

2.The PAC units should work in sequential<br />

mode in a group of units, so as to have equal run<br />

hours per day as detailed in the specifications.<br />

Necessary no. of sequential controllers required<br />

shall be provided and shall form part of the<br />

tenderer's scope of work.)<br />

1 no.<br />

Total for 1no.<br />

Total for 22 nos.(Part-A) X1= X2=<br />

PART-B : Installation Testing and commissioning of PAC & Other items<br />

SNo<br />

Description of Item<br />

Qty<br />

Rate (Rs.) per unit<br />

exclusive of Service tax<br />

Service Tax Applicable<br />

(Rs.) per unit<br />

Total Rs. (4+5) per unit<br />

CENVAT-able duties<br />

(sevice tax as per Col. 5)<br />

Net Cost to <strong>BSNL</strong> per<br />

set Rs. (col.6 - col.7)<br />

Total net cost to <strong>BSNL</strong><br />

Rs. (col.3 x col. 8)<br />

Total amount Rs.<br />

(col.3 x col. 6)<br />

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)<br />

1 Installation, testing and commissioning including Acceptance<br />

Testing of the above 7 TR microprocessor controlled Precision<br />

Package AC unit in item no.1 of part A complete with Electronically<br />

commutated motor for evaporator blower, motorised VCD and all<br />

components, controls including air cooled condenser, i/c providing<br />

and fixing of suitable MS stand for the indoor unit to requisite<br />

floor as per the specifications complete as required. 1 Job<br />

2 Providing and Laying of refrigerant pipe lines of size, for hot and<br />

cold circuits, leak and pressure testing of refrigerant lines,<br />

vacuumising , insulation of refrigerant piping arrangement and<br />

first charge of refrigerant for the AC system, complete as per<br />

specifications.<br />

(a) Liquid Line, 5/8" dia<br />

(NB: If higher size of Cu piping applicable, the same has to be<br />

supplied at same cost as 7/8”)<br />

10 mtrs.<br />

SDE (A&P) DNIT SW (E)<br />

30 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including 5 years Comprehensive AMC for various sites under<br />

<strong>Chennai</strong> <strong>Telephones</strong>”..<br />

(b) Hot Gas Line, 7/8" dia<br />

(NB: If higher size of Cu piping applicable, the same has to be<br />

supplied at same cost as 5/8”)<br />

3 Supplying and laying following sizes of PVC insulated PVC sheathed<br />

armoured U/G cable of 1.1KV grade, conforming to relevant IS on<br />

the wall/existing trench, existing cable trays i/c interconnections,<br />

end termination, gland earthing complete etc. as required<br />

10 mtrs.<br />

a) 4 Core 16 sq.mm Copper conductor U/G cable<br />

( Main switch to PAC Unit)<br />

10 mtrs.<br />

b) 3 Core 2.5 Sq.mm Copper conductor U/G Cable (PAC Indoor unit<br />

to Condenser unit) 15 mtrs.<br />

4 Providing plumbing work for condensate drain requirements i/c<br />

supply of GI pipes, pipe fittings such as bends, reducers, elbows,<br />

tees, unions, flanges etc for water connection of various<br />

components of the system.<br />

a) 25 mm ( Medium class ) GI pipe<br />

2 mtrs.<br />

b) 40mm GI pipe. (Medium class)<br />

5 Providing and fixing 6 SWG dia G I wire in surface or in recess for<br />

loop earthing along with existing surface / recessed conduit /<br />

cable as required.<br />

2 mtrs.<br />

30 mtr.<br />

Total price for 1 job<br />

Total Price for 22 jobs (Part-B) Y1= Y2=<br />

SDE (A&P) DNIT SW (E)<br />

31 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including 5 years Comprehensive AMC for various sites under<br />

<strong>Chennai</strong> <strong>Telephones</strong>”..<br />

Part –C: Comprehensive AMC<br />

SNo<br />

Description of Item<br />

Rate (Rs.) exclusive of<br />

Service tax<br />

Service Tax Applicable<br />

(Rs.)<br />

Total Rs. (4+5)<br />

COST PER UNIT<br />

CENVAT-able duties<br />

(sevice tax as per Col. 5)<br />

Net Cost to <strong>BSNL</strong> per set<br />

(Excluding Cenvatable<br />

duties and taxes)<br />

Rs. (col.6 - col.7)<br />

Qty<br />

(Nos)<br />

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)<br />

1<br />

Comprehensive maintenance of the 7TR<br />

microprocessor based High Precision<br />

package AC unit including all items covered<br />

under Part-A & Part –B as per the<br />

specifications/conditions of contract & as<br />

per the <strong>details</strong> given in relevant sections by<br />

deploying the required staff including<br />

specialized man power and by arranging<br />

required spares, refrigerant gas, tools and<br />

plant etc., to keep the AC unit & connected<br />

equipments operational upto the required<br />

standards complete as required.<br />

Note: operation of package AC unit is not<br />

included in this item<br />

a) 1 st Year (C1)(Covered under Guarantee)<br />

(See important note no 12 &13 below)<br />

b) 2 nd year (C2)<br />

C)3 rd year (C3)<br />

d) 4 th year (C4)<br />

e) 5 th year (C5)<br />

f) 6 th year (C6)<br />

1unit<br />

1 unit<br />

1 unit<br />

1 unit<br />

1 unit<br />

---- Covered under Guarantee---<br />

Total net cost to <strong>BSNL</strong> Rs.<br />

(col.3 x col. 8)<br />

Total amount Rs.<br />

(col.3 x col. 6)<br />

TOTAL Comprehensive AMC cost for 5<br />

years for 1 No of Pr AC unit<br />

1<br />

TOTAL for 18Nos of Pr AC unit(Part-C) 18 Z1= Z2=<br />

SDE (A&P) DNIT SW (E)<br />

32 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including 5 years Comprehensive AMC for various sites under<br />

<strong>Chennai</strong> <strong>Telephones</strong>.<br />

Important note:<br />

1 The prices shall be quoted after taking into account the entire credit on inputs available under the MODVAT SCHEME introduced w.e.f. 1st March 1986 and further extended on more items till date”.<br />

2 The firm shall be responsible to see that E.D/ Customs Tariff Head/Service Tax etc., shown in the above columns are correct and<br />

CENVAT Credit for the amount shown above is admissible as per CENVAT Credit Rules 2004."<br />

3 Only Form C will be issued by <strong>BSNL</strong> on specific request for Part A (supply).<br />

4 Invoice /Bill should be preprinted with serial number and service tax / CST / VAT registration number. Invoice / Bill favouring <strong>BSNL</strong> shall be issued by the supplier / Contractor indicating the amount of<br />

customs duty, Excise duty, CST, VAT and Service Tax etc., with documentary proof to avail CENVAT credit.<br />

5 a)The evaluation and comparison of responsive bids shall be done on the basis of Net cost to <strong>BSNL</strong> (for Part-A & Part- B) + Net cost to <strong>BSNL</strong> for Part-C on the prices offered inclusive of duties and taxes<br />

(but excluding CENVAT –able duties & taxes), sales Tax, packing, forwarding, freight and insurance charges etc., as indicated in the price schedule. Octroi / Entry Taxes are not to be included in the<br />

composite price and hence the same will not be considered for the purpose of evaluation and comparison of responsive bids. However, octroi / entry taxes will be paid extra, as per actual wherever<br />

applicable on production of proof of payment / relevant invoices / documents.<br />

6 The rates for all items of work shall, unless clearly specified otherwise, include cost of all labour, materials and other inputs involved in the execution of the terms as specified in the scope of work.<br />

7 LOI shall be issued separately for Part - A, Part – B & Part - C items and separate agreements shall be framed for these items. The date of commencement of work for Part – C shall be reckoned after<br />

the date of successful initial Acceptance testing of the work.<br />

8 In case supplier / contractor submits exemption certificate from the commercial tax department, the WCT shall not be deducted at source (for part B & Part C only). WCT and Service Tax are not<br />

applicable for supply portion and as such WCT will not be deducted for supply portion.<br />

9 If any levy / duty is not payable or documentary proof is not produced, the amount for the same shall be deducted.<br />

10 Circuit length for liquid line and hot gas line included in respect of item no.2/Part B is defined as under :<br />

a) Circuit length for liquid line:<br />

Length of run measured in meters from liquid outlet connection of air cooled condenser to the thermostatic expansion valve. This includes horizontal and vertical runs. In case of multiple run of liquid<br />

line (for each package unit) for the purpose of circuit length measurement, only single linear measurement on average basis shall apply.<br />

b) Circuit length for hot gas line:<br />

Length of run measured in meters from compressor discharge head to air cooled condenser hot gas line. This includes horizontal and vertical runs. In case of multiple run of hot gas line (for each<br />

package unit) for the purpose of circuit length measurement, only single linear measurement on average basis shall apply.<br />

11 The hot gas refrigerant line shall be insulated inside conditioned area with high quality insulating material.<br />

12 Normally Package AC units are under guarantee for a period of one year after the date of commissioning. But even during the guarantee period the contractor shall be fully responsible for maintaining<br />

the services and to take whatever steps as maybe necessary including preventive and breakdown maintenance steps and servicing etc., as per the recommendations of the manufacturer. <strong>BSNL</strong> shall not<br />

pay anything extra on this account. Comprehensive Maintenance for 5 years commences after the date of expiry of guarantee period.<br />

13 Terms and conditions of AMC shall be applicable during guarantee period including imposition of penalties except that no charges for services provided under guarantee /extended guarantee shall be<br />

payable. Amount for penalties will be deducted from the pending payments against supplies or if that amount is insufficient then by invoking the PBG available against supply and ITC or AMC or from<br />

the charges due for AMC.<br />

Contractor Executive Engineer (E)<br />

SDE (A&P) DNIT SW (E)<br />

33 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including 5 years Comprehensive AMC for various sites under<br />

<strong>Chennai</strong> <strong>Telephones</strong>”..<br />

Abstract of cost<br />

Price inclusive of taxes and duties minus discount<br />

Rs.<br />

Total for Part-A (col.14)=X2<br />

Part-A Part –B & PART-C (for 22 nos.)<br />

Total for Part-A (col.13)=X1<br />

Final offered (net cost)<br />

Rs.<br />

Total for Part-B<br />

( Col.10)=Y2 Rs. Total for Part-B( Col. 9 )=Y1 Rs.<br />

Total for Part-C<br />

( Col.10)=Z2 Rs. Total for Part-C( Col.9)=Z1 Rs.<br />

Total Price D2=X2+Y2+Z2 Rs. Total Price D1=X1+Y1+Z1 Rs.<br />

General Note for PART – A, PART – B & PART – C<br />

1) The total value for bid evaluation excluding Cenvatable duties & taxes (Net cost to <strong>BSNL</strong>) = D3=X1+Y1+Z1<br />

Contractor EE (E)<br />

SDE (A&P) DNIT SW (E)<br />

34 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

INTRODUCTION<br />

SCOPE/ (EXPLANATORY NOTE):<br />

TECHNICAL SPECIFICATIONS<br />

The scope of the contract viz. the supply, installation, testing and commissioning of Precision Air Conditioning<br />

plant consists of the following:<br />

The Precision package AC units which will have to work in a group upto max of 6 units and shall be<br />

interconnected to work in a single zone providing sequence changeover ,standby duties and cascade facility for<br />

extra load with single point access for alarm reporting and system connectivity.<br />

1 CONFORMITY TO INDIAN STANDARDS:<br />

The air conditioning plant equipment and installation shall conform to various IS standards amended up to date<br />

wherever applicable.<br />

2 GENERAL REQUIREMENTS AND SAFETY STANDARDS:<br />

2.1 The air conditioning plant shall be designed for Precision Air Conditioning with a higher coefficient of<br />

performance with overall low power consumption and continuous operation for the normal life of the<br />

plant.<br />

2.2 The components shall be suitable for operation under tropical conditions. The design and installation of the<br />

plant shall generally conform to the safety standards<br />

2.3 The plant room and air-conditioned space shall be free from objectionable noise and / or vibrations due to<br />

the working of the plant. The air-conditioned space shall also be free from any objectionable odour.<br />

SDE (A&P) DNIT SW (E)<br />

35 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

GENERAL DESCRIPTION OF WORK<br />

1. Station :<br />

2. Name of Building :<br />

3. Drawings: The Executive Engineer (E) shall give necessary drawings & <strong>details</strong> regarding the<br />

areas to be air conditioned, location of precision air -conditioning plant, proposed<br />

routes and location of condenser, pipes and other relevant particulars.<br />

4. Design Data:<br />

The salient design and other relevant data is given below:<br />

1. Particulars of temperature and relative humidity.<br />

(i) Outside design conditions:<br />

Summer:<br />

Monsoon:<br />

Winter:<br />

ii) Inside design conditions:<br />

DB 0 C WB 0 C RH (%)<br />

Summer :<br />

Monsoon:<br />

Winter:<br />

Temp. 23 ± 3 0 C,<br />

RH 45 % ± 15 %<br />

1. Areas to be air-conditioned …....Sq mtr<br />

2. Plant operation: 24 hours continuously.<br />

3. Peak heat load: ------kcal/Hr<br />

4. Features of A/C Plant : As per schedule of work attached<br />

5. Roof Insulation : Not applicable<br />

SDE (A&P) DNIT SW (E)<br />

36 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

SPECIFICATIONS FOR PRECISION AIR -CONDITIONING PACKAGE UNIT GENERAL<br />

0.1 These specifications set out the basis of design of self contained packaged Air conditioner units with<br />

air cooled condensers to meet the environmental needs of electronic equipments in Telephone<br />

Exchanges.<br />

DESIGN CRITERIA FOR AIRCONDITIONING PACKAGE UNIT.<br />

The Air-cooled AC Package unit should be designed as per following conditions:<br />

1 Rated capacity 7 TR sensible cooling capacity<br />

2 Flow direction Upward flow / Downward flow<br />

3 Air inlet temperature (Return air) 25 0 C (DB) & 50% RH<br />

4 Saturated Suction Temp. Between 9 °C & 10 ° C<br />

5 Minimum Super heat 2° C<br />

6 Saturated discharge Temperature Maximum 53° C(at ambient of 43° C)<br />

7 Ambient air design temperature.<br />

(Entering the condenser)<br />

43° C. (However the system should be able to work with<br />

ambient up to 50 deg C)<br />

8 Air Quantity Air quantity : > 550 CFM/ TR<br />

9 Total static pressure 35mm of WG between inlet and outlet of blower i.e. across the<br />

blower. .<br />

10 Filters EU – 4 Filter to be provided on the package units having 90%<br />

efficiency down to 10 microns<br />

11 Face velocity across the cooling coil ≤ 2.5 m/sec<br />

12 Type of load The Exchanges are having High sensible heat load (Sensible Heat<br />

factor ≥ 0.95)<br />

13 Minimum C.O.P 2.90<br />

SDE (A&P) DNIT SW (E)<br />

37 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

SPECIFICATIONS OF A.C. PACKAGE UNITS<br />

1.0 CABINET<br />

1.1 The Cabinet should be constructed from best quality GI sheet steel of thickness not<br />

less than 16 gauge for top, bottom and side panels & 20 gauge for front and back<br />

panels suitably treated for weather protection, corrosion and shall be powder<br />

coated.<br />

OR<br />

The casing may be of CRCA powder coated1.2 to 1.6 mm thick.<br />

1.2 Coil and blower sections should be insulated internally for both acoustic and thermal<br />

purposes with 12 mm thick resin bonded Fibre Glass of density 48 Kg/m³glass wool<br />

covered with glass cloth of fire retardant grade.<br />

OR<br />

The cabinet insulation may have open cell polyurethane foam or mineral wool of 25<br />

mm may be used which complies to fire classification B according to DIN 4102 self<br />

extinguishing, sound absorbent / fibre glass insulation of 25 mm thickness may be<br />

used.<br />

1.3 Suitable arrangement shall be provided for lifting/easy handling of machines.<br />

2.0 COMPRESSOR (SCROLL)<br />

2.1 All units less than 10 TR shall be provided with Single / twin compressors with single<br />

/ twin circuit having high Energy Efficiency Ratio (EER)<br />

2.2 Compressor should be of REPUTED make hermetic sealed type.<br />

2.3 Compressor should be suitable for operation on R-22.<br />

2.4 Compressor Motor should be suitable for operation on 415 V± 10% variations, 50<br />

Hz. 3 phase AC supply.<br />

2.5 The compressors should be located in such a way that removal of one compressor<br />

should not affect the operation of the other circuit( for twin circuit units).<br />

2.6 Compressor should be installed on spring mounted floating platform/rubber pads or<br />

manufacturers recommended approved mountings.<br />

2.7 Overload protection should be provided in compressor.<br />

2.8 Gauge Ports should be provided at appropriate location to measure suction and<br />

discharge pressures.<br />

2.9 Compressor should be fitted with electrically operated oil heaters. Heaters should<br />

turn ON when the compressor is OFF & vice versa. It should be possible to<br />

disconnect heater power circuit during extended periods of shut down.<br />

SDE (A&P) DNIT SW (E)<br />

38 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

3.0 EVAPORATOR SECTION<br />

3.1 Evaporator Coil.<br />

3.1.1 Evaporator coil should be one/two in number for each refrigerant circuit. Each Coil<br />

should be rated for 100% /50% of TR rating of package unit<br />

3.1.2 Evaporator coil should be constructed out of copper tubes not less than 0.31mm<br />

thick expanded on to aluminium fins to give a good mechanical bond for maximum<br />

heat transfer. Approximately 13 to 14 fins per inch should be provided. Fin<br />

thickness should not be less than 0.1mm with hydrophilic coating.<br />

3.1.3 Face area of coil should be selected corresponding to air velocity not exceeding<br />

2.5m/sec.<br />

3.1.4 A condensate drip tray of stainless steel/ GI powder coated/heavy gauge<br />

aluminum having minimum 18 SWG thick along with a special plastic pipe to<br />

drain out condensate water<br />

should be provided.<br />

3.2 Blower Section<br />

3.2.1 Total static pressure should be 35mm of WG. To confirm static pressure of blower<br />

35 mm of WG, it should be measured between inlet and outlet of blower i.e.<br />

across the blower. Blower fans should be statically and dynamically balanced.<br />

3.2.2 Fan Motor Assembly.<br />

a) Fan should be driven by a weather proof electric Motor suitable for operation on<br />

415 ±10% variations 3 phase, 50 Hz AC supply. The motor housing shall be of IP<br />

55/IP 54 grade.<br />

b) The fan should be direct driven with electronically commutated drive<br />

having a maximum speed of 1400 r.p.m,<br />

c) Energy efficient motors as per IS: 12615 of 1989 should be used.<br />

3.2.3 Precise humidification feature<br />

Not Required<br />

4.0 REFRIGERANT PIPING<br />

4.1 There should be two self contained independent refrigerant circuits in each<br />

package air conditioner for twin circuit machines. A totally independent piping<br />

hookup for each combination of compressor-evaporator & air cooled condenser<br />

constituting one refrigerant circuit. For single refrigerant circuit only one refrigerant<br />

circuit is required.<br />

4.2 Refrigerant circuit should be suitable for operation on R-22 and should include the<br />

following items:-<br />

i. Electronic Expansion Valve.<br />

SDE (A&P) DNIT SW (E)<br />

39 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

ii. Removable liquid line filter drier with hand shut off values.<br />

iii. Liquid Line Sight Glass with Moisture indicator.<br />

iv. Suitable charging valves.<br />

v.<br />

4.3 The serviceable/removable components should have union connections for easy<br />

removal /assembly.<br />

4.4 All pipe works should be carried out with refrigerant quality copper tubes and<br />

where bends are required these should be completed using either a proprietary<br />

bending tool or radius fittings. The minimum thickness of pipe should be 18 gauge.<br />

5.0 ELECTRICAL SYSTEM<br />

5.1 The Electrical power system should confirm to relevant I.S. standard. A main<br />

incoming MCB of suitable rating and having a rupturing capacity of 10 KA for each<br />

AC package unit should be provided on the unit sized to meet the total power<br />

requirements for AC package unit.<br />

5.2 Within the panel individual power loads should be distributed equally across the<br />

three phases.<br />

5.3 All individual wires should be copper and colour coded or should be numbered at<br />

their point of termination to facilitate servicing.<br />

5.4 Low voltage control wiring and power wiring should be segregated from each other.<br />

5.5 Heaters shall be suitably provided with insulators with safety thermostats and<br />

contactors of suitable ratings<br />

5.6 The following shall be incorporated:-<br />

i. MCB of suitable rating and having a rupturing capacity of 10 KA should be<br />

provided for each sub-circuit.<br />

ii. Contactors of suitable ratings for each motor.<br />

iii. Electronic overload protection against overload, phase loss & reverse phase<br />

sequence and sensing negative sequence current for individual 3 phase motors.<br />

6.0 AIR COOLED CONDENSER<br />

6.1 For each packaged air conditioner unit [with twin circuits] there should be two air cooled<br />

condenser units, each having a matching heat rejection duty for one refrigerant circuit<br />

6.2 Condenser unit should incorporate the followings:-<br />

i. A heat rejecting coil block constructed from copper tubes of not less than 0.3mm thick<br />

expanded on to straight aluminum fins. Approximately 13 to 14 number of fins/inch<br />

should be provided. Fin thickness should not be less than 0.1 mm with hydrophilic coating.<br />

SDE (A&P) DNIT SW (E)<br />

40 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

ii. Minimum Two propeller fans shall be provided for each condenser unit and should be<br />

selected for low speed quiet operation. The condenser unit should be of suitably<br />

designed for noise level ≤ 75 db at a distance of 1 meter away from O/D unit.<br />

6.3 The condenser should be vertical mounting type with horizontal throw of air, ensuring<br />

even air flow over the coil block. Suitable GSS collar shall be provided at fan outlet.<br />

6.4 All the foregoing items should be factory assembled with body made out of 1.6mm (16<br />

SWG) GI sheet (Powder Coated)<br />

OR<br />

Condenser body may be of GI powder coated / casing of condenser may be made of<br />

marine grade aluminum and stainless steel hardware and thickness of casing may be<br />

1.2mm<br />

6.5 The entire assembly should be supported by a corrosion treated frame.<br />

6.6 Separate MCB of suitable rating and having a rupturing capacity of 10 KA for each motor<br />

near its vicinity in suitable weather proof enclosure should be provided.<br />

7.0 CONTROLS:<br />

Following controls should be provided:-<br />

1. High pressure trip – Auto reset/Manual reset (for each compressor)<br />

2. Low pressure trip – Auto reset (for each compressor)<br />

The unit shall trip if operated on HP (Auto reset) or LP trip for more than three times.<br />

8.0 SAFETY INTERLOCKS<br />

8.1 Interlock between condenser fan motor and compressor motor to prevent starting of<br />

compressor without condenser fan in operation.<br />

8.2 Condenser fan should stop along with compressor.<br />

8.3 Provision should also be made to operate the evaporator fan without the operation<br />

of condenser and compressor.<br />

9.0 CONTROLLER:<br />

Microprocessor based Programmable logic controller fully compliant with EEC directives for<br />

electromagnetic compatibility with following broad features:<br />

9.1 Operates, monitors and displays so that the room temperature and humidity is kept at 23 ±<br />

3 0 C and 45 ±15% RH respectively. However the parameters should be site settable.<br />

9.2 Password protected for authorized access alone.<br />

9.3 User friendly interface with backlit LCD screen / LED that indicate through animation and<br />

icons plant items (Actual and set point temperature and humidity etc), history of alarms,<br />

alarms logging (High / low temperature , high / low humidity, compressor high HP/ low LP,<br />

low humidifier water, overload, air flow failure, dirty filter, high heater temp. etc)<br />

SDE (A&P) DNIT SW (E)<br />

41 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

9.4 Logging of last 48 hours which include every 15 minutes recording of switch room<br />

temperature, humidity, current & cumulative power (in KWH) along with the alarms<br />

history of last 100 alarms needs to be provided at remote monitoring station with date,<br />

time and machine no. The alarm history shall include status, type of alarm along with date<br />

and duration.<br />

9.5 Allow adjustment of temperature and humidity set points, range of control, alarm set<br />

points etc.<br />

9.6 Arrow/ control buttons for navigation and value adjustment.<br />

9.7 Status indicators like power, cool, humidity etc.<br />

9.8 SMPS power module for control unit<br />

9.9 Necessary provision may be made for operation of controller in case of power failure.<br />

9.10 Programming of AC units shall be based on (i) Equal run hours per 24 hours in a day and (ii)<br />

if the designated unit is unhealthy, then stop the unhealthy unit and start command shall be<br />

passed on to next unit.<br />

9.11 In case of more than one number of AC Package unit, the optimum number of package<br />

units shall be made operational in order to maintain the necessary temperature &<br />

humidity conditions in the switch room / conditioned room.<br />

9.12 Unhealthy Condition: - Current drawn by individual units as well as supply air<br />

temperature at the individual AC units should be displayed simultaneously in the<br />

controller. There should be option to program the high and low acceptable levels of both<br />

of these parameters (i.e supply air temperature as well as current) through front panel<br />

depending on the site requirement. In case of fault the respective AC unit should be<br />

switched OFF and taken out of the running sequence. Alarm should be available for the<br />

faulty unit.<br />

9.13 It should be possible to analyze the sites with the maximum run hours of AC units and sites<br />

with maximum alarms. Option should also be available to view the parameters and alarms<br />

in numeric (analogue and digital) or graphical format.<br />

9.14 Separate auto / manual switch for each circuit is to be provided for bypassing the<br />

controller. However manual mode should not be made effective through control card i.e it<br />

should be independent of the control card. All the safeties such as HP/LP, overload,<br />

thermostat etc plus the starting sequence of blower, condenser, compressor and the<br />

interlocking of blower with the condenser & compressor should be functional in manual<br />

mode also.<br />

.9.15 List of I/O Alarms to be monitored by the controller<br />

Precision AC units of one no to 8nos (max) may be required to be installed at any of the<br />

site. Following parameters shall be monitored by the microprocessor of the PAC on<br />

continuous basis: ‘a to j’.<br />

SDE (A&P) DNIT SW (E)<br />

42 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

Precision AC Units monitoring<br />

a. High Temperature<br />

b. Low Temperature<br />

c. High Humidity<br />

d. Low Humidity<br />

e. Compressor High HP<br />

f. Compressor Low LP<br />

g. Over Load<br />

h. Air flow failure<br />

i. Dirty /clogged filter<br />

j. Run status<br />

SDE (A&P) DNIT SW (E)<br />

43 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

GENERAL SPECIFICATIONS AND CONDITIONS FOR COMPREHENSIVE AMC<br />

1.0 Scope of Maintenance<br />

1.1 Electrical maintenance shall be carried out as per instructions contained herein All forms &<br />

instructions to be used shall be as per works instructions forms & checklists issued by CE(E),<br />

<strong>Chennai</strong> <strong>Telephones</strong> & available with SDE (E).<br />

1.2 After the contract period is over the installation has to be duly handed over to the new<br />

agency in good, healthy, neat, working condition. along with the record of test results of<br />

equipments & associated items. under supervision of SDE (E)/JTO (E) in charge. The<br />

contractor shall be responsible for any discrepancies Vis-a-vis, the status of installation at the<br />

start of work plus any modification carried out during the currency of the contract.<br />

Installation is to be handed over to the new agency with in 15 days of award of work to the<br />

new agency.<br />

2.0 METHODOLOGY<br />

2.1 At the start of guarantee period, firm shall prepare an inventory of all equipment jointly<br />

with J.T.O (E)/SDE(E), concerned.<br />

2.2 A complaint Register as per Annexure- IV shall be kept at site by the user and the same<br />

shall be available for checking & verification.<br />

2.3 At the start of each month, the firm in consultation with the SDE (E) concerned shall<br />

prepare a Program for preventive maintenance to be carried out during the month. The<br />

actual maintenance carried out shall be recorded in annexure-V at the end of each month.<br />

2.4 If during the period of contract, any of the Package AC units are added/ altered,<br />

comprehensive maintenance of the same shall be done by the firm, the rates will be<br />

regularized as per Clause -12 of EW 8. However in case of deletion similar recovery shall be<br />

made from the bill of the contractor.<br />

3.0 QUALIFICATION<br />

3.1 Minimum staff required.<br />

One qualified supervisor should inspect all the Package AC units at least once in a month.<br />

3.2 All electrical repairs should be carried out by qualified electricians.<br />

4.0 COMMERCIAL<br />

4.1 The workers engaged by firm should maintain proper discipline and good behavior with<br />

occupants.<br />

4.2 The firm shall remove such workers from the site whose behavior is found improper.<br />

Executive Engineer’s decision in this matter shall be final.<br />

4.3 Agency has to observe all the labour rules & regulations in force & <strong>BSNL</strong> shall not be liable for<br />

any default.<br />

SDE (A&P) DNIT SW (E)<br />

44 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

4.4 .Dismantled materials shall be returned to the department except those items for which the<br />

replacement is supplied by the agency. Dismantled and unserviceable items, for which a<br />

replacement is supplied, shall be removed from the site under intimation to the JTO (E).<br />

4.5 The <strong>BSNL</strong> reserves the right to carry out any work at the risk and cost of the agency, if the<br />

agency fails to perform any duty as per the contract.<br />

4.6 The tenderer must obtain himself at his own expense all the information necessary for the<br />

purpose of execution, before tendering.<br />

4.7 The rate quoted must be full & final.<br />

4.8 Nothing extra is payable other than quoted rates unless specified.<br />

4.9 The contractor shall not sublet the work or part thereof. However, services of specialized<br />

agencies for specified work can be obtained.<br />

4.10 The firm shall maintain the installation(s) in such a way as to provide uninterrupted required<br />

conditions in air conditioned rooms.<br />

4.11 The <strong>BSNL</strong> reserves the right to terminate the contract by giving show-cause notice of one<br />

month duration at any time during the currency of the contract.<br />

4.12 Firm should have the round the clock contact number. In case of emergency, contractor and<br />

authorized engineer / supervisor shall be available at the site on short notice from engineerin-charge<br />

and make efforts to take situation to normal at the earliest.<br />

4.13 Once the installation is handed over to the contractor, it is the responsibility of the contractor<br />

to attend whatever defects / damages arising after the date of handing over including<br />

replacement of defective components etc.<br />

4.14 The contractor agrees that he shall at all times indemnify <strong>BSNL</strong> against all claims for<br />

compensation under the provisions of any law for the time being in force or in respect of any<br />

person employed by it in carrying out the contract. Further, such staff has no right to claim<br />

employment in <strong>BSNL</strong>.<br />

4.15 The firm shall also coordinate with the JTO (E) / SDE (E) for carrying out energy audit/capacity<br />

test at site whenever required.<br />

4.16 The Firm/Contractor will provide the workers with necessary Testing and Safety Equipment.<br />

5.0 MATERIALS AND TOOLS & PLANTS<br />

5.1 Material<br />

5.1.1. The scope of work includes maintenance of equipment and service, on comprehensive basis<br />

i.e. no material will be supplied by the Department.<br />

5.1.3 The replacement of material shall be with the same rating and make as that of the original.<br />

The firm may also replace an item with energy efficient item wherever the same is available,<br />

upon intimation to JTO (E). However, in case of non-availability of a particular make,<br />

Engineer-in-charge will approve the alternate make.<br />

5.1.4 Supplier Invoice/Bill / Purchase particulars shall be produced in case of all major items such as<br />

compressor etc. as a proof of genuineness. For replacement compressor, the firm shall<br />

produce necessary documentary proof. Obsolete items not available in market can be<br />

repaired and re used. However efficiency of compressor shall be ensured to avoid penalty<br />

under relevant clauses.<br />

SDE (A&P) DNIT SW (E)<br />

45 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

5.2 TOOLS & PLANTS: All tools and plants, testing & safety equipments required for carrying out<br />

various tasks relevant to comprehensive maintenance have to be arranged by firm at its own<br />

cost.<br />

6.0.PENALTY CLAUSE:<br />

6.1 Any damage to the installation(s)/building during the maintenance period due to the<br />

carelessness on the part of staff shall be the responsibility of firm & be replaced /rectified<br />

with out any extra cost<br />

6.2 Any accident or damage during maintenance will be the responsibility of the agency & <strong>BSNL</strong><br />

will not entertain any claim, compensation, penalty etc on this account or on account of<br />

non observance of law to his work<br />

6.3 If the agency fails to rectify any fault within reasonable time, the <strong>BSNL</strong> reserves the right to<br />

carry out any work at the risk and cost of the agency. In case the fault is of emergency<br />

nature which may affect the normal functioning of services and the firm fails to take<br />

immediate necessary action, the work shall be carried out at the risk and cost of the firm<br />

without giving any notice. The decision of EE (E) shall be final.<br />

6.4 In case of unsatisfactory performance, penalty of one month bill for that service shall be<br />

imposed.<br />

6.5 In case of major accident/loss on account of negligence on part of the contractor, the<br />

contract shall be terminated and 10% (ten percent) of the tendered amount shall be<br />

recovered.<br />

6.6 The individual Package AC unit shall not be out of service beyond 15 days. Failure to do so<br />

shall invite a penalty @ Rs.1000/-day/ Package AC unit that is out of service.<br />

7.0.CONTRACT PERIOD FOR COMPREHENSIVE AMC<br />

7.1 The currency of contract shall be 72 months including 12 months guarantee period after<br />

successful initial Acceptance testing of the work.<br />

7.2 The <strong>BSNL</strong> reserves the right to terminate the contract by giving show cause notice of onemonth<br />

duration at any time during the currency of the contract.<br />

7.3 The <strong>BSNL</strong> reserves the right to extend the contract for a maximum period of six months<br />

(three months at a time) at the same rate & conditions<br />

List of Annexures<br />

SL Description of Annexure<br />

Annexure<br />

NO<br />

1 Details to be supplied before starting the work & Details to III<br />

be displayed at site<br />

2 Complaint Register IV<br />

3 Actual Periodical maintenance V<br />

SDE (A&P) DNIT SW (E)<br />

46 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

Annexure-III<br />

DETAILS TO BE SUPPLIED BEFORE STARTING WORK WITHIN 15 DAYS<br />

The Package A/C unit Installation in this building is under maintenance by<br />

1. Name of the Agency<br />

2 Address ( of maintenance office)<br />

3. Person to contact<br />

<br />

<br />

<br />

<br />

4. Telephone No.<br />

5. Name of JTO(E) incharge and his<br />

contact No.<br />

In case of faults please call:<br />

_________________________________ or ________________________________<br />

In case of no response call JTO (E) and register complaint.<br />

Help us to serve you better<br />

SAVE ENERGY IN THE INTEREST OF YOU, <strong>BSNL</strong> AND THE NATION.<br />

ANNEXURE - IV<br />

COMPLAINT REGISTER<br />

Name of work:<br />

Name of contractor:<br />

Agreement No:<br />

Name of Sub-Division:<br />

Location<br />

Complaint No.<br />

(1)<br />

Date &Time of<br />

complaint(2)<br />

Site/<br />

Location(3)<br />

Complaint Lodged<br />

by (4)<br />

Nature of<br />

complaint reported<br />

(5)<br />

Time & Date of<br />

attending<br />

complaint vide<br />

service report<br />

no.(6)<br />

Cause of fault<br />

(7)<br />

Dated Signature of<br />

Firm’s<br />

Representative<br />

(8)<br />

Dated Signature of<br />

SDE/JTO<br />

(9)<br />

Remarks<br />

(10)<br />

SDE (A&P) DNIT SW (E)<br />

47 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

ANNEXURE – V<br />

ACTUAL PERIODICAL MAINTENANCE CARRIED OUT IN THE MONTH OF ___________<br />

Name of contractor: ________________________________.<br />

Agreement No. : _________________________________.<br />

Month:<br />

Sr.<br />

no<br />

Site<br />

Service<br />

Activity<br />

as per<br />

quarterly<br />

plan<br />

Date on<br />

which<br />

actual<br />

activity<br />

carried out<br />

Result of<br />

the activity<br />

Departmental<br />

representative<br />

Remarks<br />

1. Certified that we have carried out maintenance properly as per<br />

schedule of work and as per terms and condition of the agreement and<br />

testing required during the period has been performed.<br />

Contractor’s representative<br />

Departmental representative<br />

SDE (A&P) DNIT SW (E)<br />

48 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units<br />

including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>.<br />

TECHNICAL SPECIFICATIONS FOR COMPREHENSIVE AMC<br />

PART I: SCOPE OF WORK FOR AIR CONDITIONING PACKAGE SYSTEM<br />

Comprehensive Maintenance (Routine, Preventive & Break Down) throughout the period of contract, as<br />

per the guidelines of <strong>BSNL</strong>/Engineer-in-charge.<br />

1. The Contractor shall keep all the units including associated electrical connections and accessories in<br />

healthy working condition.<br />

2. The contractor shall attend minor faults promptly and within 48 hours of reporting so as to bring<br />

the units to satisfactory working condition<br />

3. Service report as per Performa enclosed shall be submitted with every bill.<br />

Note<br />

i) (a)The scope of work shall be including leak testing, vacuuming gas supplying and charging,<br />

oil filling, remote controller, selector switch, filters, grills, outer body, partition and recommissioning<br />

supply and replacement of defective components like compressor Refrigerant<br />

piping, condenser, cooling coil, evaporator coil, insulation wherever necessary fan, fan motors,<br />

capacitors, relays, connectors, wires, thermostats, starters, indicating lamps, HRC fuses, MCBs,<br />

metal clad plug and sockets, etc., Manufacture guarantee cards for replaced compressor and<br />

monthly service report are to be submitted with the bill.<br />

(b)The compressor replacement wherever carried out, it should be from original manufacturers with<br />

initial filling of gas and oil. The firm should furnish the original invoice & guarantee card of the new<br />

compressor replaced.<br />

(c) Refrigerant lost during the operation, oil, fan belt, & filter shall be firm’s responsibility.<br />

(d) Wherever capacitors are replaced, it shall be of metal body type only.<br />

ii) The A/C units shall be handed over in satisfactory working condition on the completion of the AMC.<br />

iii) In order to reduce the maintenance cost, contractor is to attend minor faults then and there.<br />

iv) Proper working of thermostat of the AC units may be ensured to reduce Power consumption.<br />

PART II: TASKS TO BE PERFORMED WITHIN 15 DAYS<br />

Following tasks should be carried out within 15 days.<br />

1) A system shall be organized with the approval of Engineer-in-charge so that complaints can be<br />

received and attended properly.<br />

2) All registers shall be opened as per proforma.<br />

3) Shall collect information like the telephone numbers of the Exchange in charge, JTO(E),<br />

SDE(E),EE(E),Fire service, Supply Company, Local Hospitals, Emergency Services etc. and preserve<br />

it in the maintenance office.<br />

SDE(A&P) DNIT SW(E)<br />

49 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including<br />

5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

Part III – MAINTENANCE SCHEDULE TO BE FOLLOWED<br />

SECTION I: PACKAGED AC PLANTS.<br />

MONTHLY<br />

1. Micro filter cleaning.<br />

2. Fresh air filter cleaning.<br />

3. Check electrical contacts and tighten them.<br />

4. Check for leakage of conditioned air.<br />

5. Check of controls.<br />

Quarterly.<br />

1. Lubrication of all bearing etc.<br />

YEARLY<br />

1. Complete servicing of A/C pkg. plant before onset of summer (i/c change of compressor oil ,<br />

Cleaning of valves and condensers.)<br />

Material<br />

All the materials required for carrying out maintenance shall be arranged by the contractor at his own<br />

cost except replacement of Package AC unit as a whole including main MV panel.<br />

SDE (A&P) DNIT SW (E)<br />

50 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including<br />

5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

UNDERTAKING REGARDING EPF PROVISIONS<br />

"I……… ……………… ……………… …………… ………Son of. ……… ………………… ………… …………… …………….. …………….Resident<br />

of …… …………… ………… …………… …………… …………… …………. hereby give an undertaking that<br />

* I/We have employed only ----------- persons in our establishment and hence the EPF and Miscellaneous<br />

provisions Act, 1952 is not applicable to my /our establishment.<br />

* I/ We have registered as per the EPF and Miscellaneous provisions Act, 1952 and our registration no is ----------<br />

------. We undertake to keep it valid during the currency of contract.<br />

In case at any stage, it is found that the information given by me is false / incorrect, <strong>BSNL</strong> shall have the<br />

absolute right to take any action as deemed fit/without any prior intimation to me".<br />

* strike out whichever is not applicable<br />

(Seal of the firm)<br />

(Dated Signature of Contractor)<br />

SDE (A&P) DNIT SW (E)<br />

51 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including<br />

5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

UNDERTAKING TO ABIDE BY EW6 & EW8<br />

UNDERTAKING A<br />

"I……… ……………… ……………… …………… ………Son of. ……… ………………… ………… …………… …………….. …………….Resident<br />

of …… …………… ………… …………… …………… …………… …………. hereby give an undertaking that I have read and I am<br />

aware of all the clauses and sub clauses of <strong>BSNL</strong> EW 6 & 8 forms and I confirm that I will abide by all the terms and<br />

conditions available in original standard <strong>BSNL</strong> EW 6 & 8 forms.<br />

(Seal of the firm)<br />

(Dated Signature of Contractor)<br />

SDE (A&P) DNIT SW (E)<br />

52 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including<br />

5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

Payment to the Contractors is regulated as below:<br />

For Supply items (i.e. Part A)<br />

TERMS OF PAYMENT:<br />

a) 95% of the price shall be paid on the receipt of goods at site by the consignee. For claiming this<br />

payment the following documents are to be submitted to the paying authority:<br />

i) Excise gate pass/invoice or equivalent document<br />

ii) Delivery Challan<br />

iii) Consignee receipt<br />

iv) Proof of payment of octroi / entry tax etc., if any.<br />

b) The balance 5% payment shall be released after satisfactory commissioning of equipment or 6 months<br />

from the date of supply of the equipment, whichever is earlier.<br />

c) In cases where shortages/ damages are intimated to the supplier in writing, the balance<br />

payment shall be released only after the cases are settled in accordance with the provision of<br />

the P.O.<br />

d) 100% payment (in place of 95%) may be made on delivery, provided that an additional Bank<br />

Guarantee for an amount equivalent to 5% of the value of supplies valid for a minimum period of one<br />

year is furnished by the supplier along with an undertaking that the shortages/ damages as are<br />

intimated to the supplier in writing shall be made good.<br />

e) Form `C’ and a certificate stating that the tendered item are meant for the use of <strong>BSNL</strong> shall be<br />

provided by the purchaser on the request of the bidder as and when requested for.<br />

f) No payment will be made for goods rejected at the site on testing. Payment, if made, for such items<br />

shall be recovered from subsequent bills or other bills.<br />

For ITC items (I.e. Part B)<br />

The payment terms will be as under:<br />

(i) 50% on Installation & Trial Testing<br />

(ii) 50% on successful completion of Acceptance final testing.<br />

For Comprehensive AMC(i.e. Part C)<br />

Half yearly payment (Once in 6 Months) shall be made after completion of maintenance period.<br />

With each bill, a certificate as given below should be enclosed. This certificate has to be countersigned by<br />

SDE (E).<br />

SDE (A&P) DNIT SW (E)<br />

53 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including<br />

5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

CERTIFICATE<br />

I M/s ……………………………………………….had executed the comprehensive Maintenance of<br />

……..nos. 7 TR Package type AC units at ………………………………………..as per the schedule and<br />

Agreement promptly and satisfactorily during the month of…………….<br />

Date………….<br />

Contractor Verified by Approved by<br />

JTO<br />

SDE<br />

SDE (A&P) DNIT SW (E)<br />

54 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including<br />

5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

Declaration by Contractor<br />

(To be given by tenderers downloading the tender document from the web)<br />

This is to certify that:<br />

1) I / We have submitted the tenders in the proforma as downloaded directly from the web site<br />

which are same as available in the web site and there is no change in the format, no. of pages,<br />

etc.<br />

2) I / We have not made any modifications / corrections / additions etc., in the tender documents<br />

downloaded from web by me / us.<br />

3) I / We have checked that no page is missing and all pages as per the index are available and that<br />

all pages of tender document submitted by us are clear and legible.<br />

4) I / We have signed (with stamp) all the pages of tender document before submitting the same.<br />

5) I / We have stitched and sealed the tender documents properly before submitting the same.<br />

6) I / We have submitted the cost of the tender along with EMD in the first cover as prescribed.<br />

7) I / We have read carefully and understood the ‘Important instructions to contractors’, ‘Important<br />

instructions to tenderers downloading the tender documents from web site’ and entire standard<br />

<strong>BSNL</strong> EW 6 / EW8 clauses and proforma form displayed in web site.<br />

8) In case at later stage, it is noticed that there is any difference in my / our tender documents with<br />

the original documents, <strong>BSNL</strong> shall have the right to cancel the tender / work, forfeit the Earnest<br />

Money / Security Deposit, take appropriate action as per the prevailing rules in force and <strong>BSNL</strong><br />

shall not be bound to pay any damages to me / us on this account.<br />

Dated……………….<br />

(CONTRACTOR)<br />

(SIGN WITH SEAL)<br />

SDE (A&P) DNIT SW (E)<br />

55 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including<br />

5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

Annexure I<br />

MODEL FORM OF BANK GUARANTEE<br />

(for submitting EMD)<br />

Whereas____________________________(hereinafter called “the contractor(s)”) has submitted its<br />

Tender dated_________for the work _____________________<br />

_________________________________________________________________<br />

KNOW ALL MEN by these presents that WE___________________________<br />

OF___________________________ having our registered office at_______________________<br />

(hereinafter called “the Bank”) are bound unto _______________________ (hereinafter called “the<br />

<strong>BSNL</strong>”) in the sum of _________________ for which payment will and truly to be made of the said<br />

<strong>BSNL</strong>, the Bank binds itself, its successors and assigns by these presents.<br />

THE CONDITIONS of the obligation are:<br />

1. If the Contractor(s) withdraws its Tender during the period of Tender validity specified on the Tender<br />

Form: or<br />

2. If the Contractor(s) having been notified of the acceptance of its Tender by the <strong>BSNL</strong> during the<br />

period of Tender validity.<br />

(a) Fails or refuses to execute the Contract.<br />

(b) Fails or refuses to furnish security Deposit in accordance with the conditions of Tender document.<br />

We undertake to pay to the <strong>BSNL</strong> up to the above amount upon receipt of its first written demand,<br />

without the <strong>BSNL</strong> having to substantiate its demand, provided that in its demand, the <strong>BSNL</strong> will note<br />

that the amount claimed by it is due to it owing to the occurrence of one or both of the two conditions,<br />

specifying the occurred condition or conditions.<br />

This guarantee will remain in force as specified in the Tender Document up to and including Thirty (30)<br />

days after the period of the Tender validity and any demand in respect thereof should reach the Bank<br />

not later than the specified date/dates.<br />

Signature of the Witness<br />

Name of Witness<br />

Address of Witness:<br />

Signature of the Bank<br />

SDE (A&P) DNIT SW (E)<br />

56 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including<br />

5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

ANNEXURE II<br />

PERFORMANCE SECURITY GUARANTEE BOND<br />

In consideration of the CMD, <strong>BSNL</strong> (hereinafter called ‘<strong>BSNL</strong>’) having agreed to exempt<br />

___________________ (hereinafter called ‘the said contractor(s)’) from the demand under the terms and<br />

conditions of an agreement/Advance Purchase Order No ________________ dated ____________ made<br />

between _____________________ and __________________ for the supply of<br />

_______________________ (hereinafter called “the said agreement ”), of security deposit for the due<br />

fulfillment by the said contractor (s) of the terms and conditions contained in the said Agreement, on<br />

production of the bank guarantee for _____________________________________we, (name of the<br />

bank) _________________________ ( hereinafter refer to as “the bank”) at the request of<br />

___________________________________ (contractor(s)) do hereby undertake to pay to the <strong>BSNL</strong> an<br />

amount not exceeding ___________________ against any loss or damage caused to or suffered or would<br />

be caused to or suffered by <strong>BSNL</strong> by reason of any breach by the said Contractor(s) of any of the terms or<br />

conditions contained in the said Agreement.<br />

2. We (name of the bank) ____________________ do hereby undertake to pay the amounts due and<br />

payable under this guarantee without any demur, merely on a demand from the <strong>BSNL</strong> by reason of<br />

breach by the said contractor(s)’ of any of the terms or conditions contained in the said Agreement or by<br />

reason of the contractors(s)’ failure to perform the said Agreement. Any such demand made on the bank<br />

shall be conclusive as regards the amount due and payable by the Bank under this guarantee where the<br />

decision of <strong>BSNL</strong> in these counts shall be final and binding on the bank. However, our liability under this<br />

guarantee shall be restricted to an amount not exceeding ___________________________________.<br />

3. We under take to pay to the <strong>BSNL</strong> any money so demanded notwithstanding any dispute or disputes<br />

raised by the contractor(s)/supplier(s) in any suit or proceeding pending before any court or tribunal<br />

relating thereto our liability under this present being absolute and unequivocal. The payment so made by<br />

us under this bond shall be valid discharge of our liability for payment there under and the<br />

contractor(s)/supplier(s) shall have no claim against us for making such payment.<br />

4. We( name of the bank)_________________________ further agree that the guarantee herein<br />

contained shall remain in full force and effect during the period that would be taken for the performance<br />

of the said agreement and that it shall continue to be enforceable till all the dues of the <strong>BSNL</strong> under or by<br />

virtue of the said Agreement have been fully paid and its claims satisfied or discharged or till<br />

________________________(office/Department) <strong>BSNL</strong> certifies that the terms and conditions of the said<br />

Agreement have been fully or properly carried out by the said contractor(s) and accordingly discharges<br />

this guarantee. Unless a demand or claim under this guarantee is made on us in writing on or before the<br />

expiry of TWO/TWO AND HALF/THREE YEARS (as specified in P.O) from the date hereof, we shall be<br />

discharged from all liabilities under this guarantee thereafter.<br />

5. We (name of the bank)_________________________ further agree with the <strong>BSNL</strong> that the <strong>BSNL</strong> shall<br />

have the fullest liberty without our consent and without affecting in any manner our obligations<br />

hereunder to vary any of the terms and conditions of the said Agreement or to extend time of<br />

performance by the said contractor(s) from time to time or to postpone for any time or from time to<br />

time any of the powers exercisable by the <strong>BSNL</strong> against the said Contractor(s) and to forbear or enforce<br />

any of the terms and conditions relating to the said agreement and we shall not be relieved from our<br />

SDE (A&P) DNIT SW (E)<br />

57 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including<br />

5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

liability by reason of any such variation, or extension being granted to the said Contractor(s) or for any<br />

forbearance, act or omission on the part of the <strong>BSNL</strong> or any indulgence by the <strong>BSNL</strong> to the said<br />

Contractor(s) or by any such matter or thing whatsoever which under the law relating to sureties would,<br />

but for this provision, have effect of so relieving us.<br />

6. This guarantee will not be discharged due to the change in the constitution of the Bank or the<br />

Contractor(s)/supplier(s).<br />

7. We (name of the bank) ____________________ lastly undertake not to revoke this guarantee during<br />

its currency except with the previous consent of the <strong>BSNL</strong> in writing.<br />

Dated the ________________ day of _______<br />

for __________________________________<br />

(indicate the name of bank)<br />

SDE (A&P) DNIT SW (E)<br />

58 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including<br />

5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

PROFORMA OF SCHEDULES<br />

(Operative Schedules to be supplied separately to each intending tenderer)<br />

SCHEDULE ‘A’<br />

Schedule of quantities<br />

Attached<br />

SCHEDULE ‘B<br />

Schedule of materials to be issued to the contractor<br />

S.No. Description of item Quantity Rates in figures & Place of issue<br />

Words at which the<br />

Material will be charged<br />

To the contractor<br />

1. 2 3 4 5<br />

NIL<br />

SCHEDULE ‘C’<br />

Tools and plants to be hired to the contractor<br />

Sr.No. Description Hire charges per day Place of issue<br />

1. 2 3 4<br />

NIL<br />

SCHEDULE ‘D’<br />

Extra schedule for specific requirements/documents for the work, if any.<br />

Nil<br />

SCHEDULE ‘E’<br />

Schedule of components of Materials, Labour etc. for escalation<br />

CLAUSE 10 CC<br />

Not applicable<br />

SCHEDULE ‘F’<br />

Reference to General Conditions of contract.<br />

Name of work:<br />

SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled<br />

Precision package AC units including 5 years Comprehensive AMC for<br />

various sites under <strong>Chennai</strong> <strong>Telephones</strong><br />

Estimated cost of work: Rs. 86,65,162/-<br />

Earnest money: Rs. 1,73,303/-<br />

Security Deposit and<br />

performance Guarantee<br />

Refer clause 8 of <strong>BSNL</strong> EW 6<br />

SDE (A&P) DNIT SW (E)<br />

59 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including<br />

5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

GENERAL RULES : Officer inviting tender EXECUTIVE ENGINEER<br />

DIRECTIONS<br />

ELECTRICAL DN-III,<br />

CHENNAI.<br />

Definitions<br />

2(v) Engineer-in-Charge EXECUTIVE ENGINEER (E)<br />

2(vi) Accepting Authority CE (E) <strong>BSNL</strong> ELECT ZONE <strong>Chennai</strong> <strong>Telephones</strong>.<br />

2(x)<br />

Percentage on cost of materials<br />

and labour to cover all 10%<br />

overheads and profits<br />

Clause 5<br />

Time allowed for execution<br />

of each work for Part-A&B<br />

For Part-C<br />

Authority to give fair<br />

And reasonable extension of<br />

Time for completion of work<br />

Competent Authority for<br />

Deciding reduced rates<br />

Clause 25<br />

Competent authority for conciliation:<br />

3 (THREE) MONTHS FROM THE<br />

DATE OF ISSUE OF AWARD LETTER FOR<br />

INDIVIDUAL WORK.<br />

72(SEVENTY TWO) MONTHS INCLUDING 12 MONTHS<br />

GUARANTEE PERIOD AFTER SUCCESSFUL INITIAL<br />

ACCEPTANCE TEST FOR INDIVIDUAL WORK.<br />

SUPERINTENDING ENGINEER (E)<br />

CE (E) <strong>Chennai</strong> <strong>Telephones</strong>.<br />

SE (E) not in-charge of the work.<br />

SDE (A&P) DNIT SW (E)<br />

60 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including 5 years Comprehensive AMC for various sites under<br />

<strong>Chennai</strong> <strong>Telephones</strong>.<br />

PRICE BID<br />

Name of the work :- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including 5 years Comprehensive AMC for various sites under<br />

<strong>Chennai</strong> <strong>Telephones</strong>”..<br />

PART - A : Supply of Equipment<br />

SCHEDULE OF QUANTITIES<br />

Sl.<br />

No<br />

Description of Item<br />

Qty<br />

Basic price exclusive of all<br />

levies & charges<br />

(Note:1.Top or Bottom feeding air flow arrangement<br />

will be decided as per site requirement and<br />

SDE(A&P) DNIT SW(E)<br />

61 of 68<br />

Excise Duty +<br />

Cess/custom duty<br />

Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs.<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14<br />

1 Supply of factory assembled factory tested 7 TR (sensible)<br />

High Precision AC package units [Micro processor based<br />

air cooled unit] complete with upward flow / downward<br />

flow with motorized volume control damper, suitable<br />

mesh in the return air path having energy efficient high<br />

technology with scroll compressor working on R-22<br />

refrigerant in single/double refrigerant circuit, comprising<br />

of indoor & out door units with all components i/c supply<br />

of controls, interlocking, electrical accessories, SPP [for all<br />

three phase motors], voltage & current indications &<br />

sequential controls, communication port with suitable<br />

protocol to suit BMS compatibility but without software,<br />

air cooled condenser with fans each directly driven by<br />

motor having a matching heat rejection duty with heat<br />

rejecting coil constructed from copper tubes with<br />

expanded aluminum fins, MCBs, safety valve, pressure<br />

release valve, data/ communication cable between units<br />

etc. complete as required and as per specifications<br />

attached.<br />

Also See important note no 1 to 13 below.<br />

Sales TAX /VAT (see<br />

important note.3 below)<br />

Freight, Insurance,<br />

Packing and forwarding<br />

Any other levies<br />

paid/payable by agency<br />

Unit price inclusive of all<br />

levis & taxes<br />

(4+5+6+7+8)<br />

Duties & Taxes CENVATable<br />

on unit price<br />

Discount offered (if any)/<br />

UNIT<br />

Net cost to <strong>BSNL</strong> per set<br />

(9-10-11)<br />

Total Net cost to <strong>BSNL</strong><br />

(col. 3 X 12)<br />

Total amount inclusive of<br />

all levis & taxes - Discount<br />

offered if any<br />

( (col. 3 x ( col.9- col 11) )


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including 5 years Comprehensive AMC for various sites under<br />

<strong>Chennai</strong> <strong>Telephones</strong>”..<br />

intimated while issuing separate letter of indent.<br />

2.The PAC units should work in sequential<br />

mode in a group of units, so as to have equal run<br />

hours per day as detailed in the specifications.<br />

Necessary no. of sequential controllers required<br />

shall be provided and shall form part of the<br />

tenderer's scope of work.)<br />

1 no.<br />

Total for 1no.<br />

Total for 22 nos.(Part-A) X1= X2=<br />

SDE (A&P) DNIT SW (E)<br />

62 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including 5 years Comprehensive AMC for various sites under<br />

<strong>Chennai</strong> <strong>Telephones</strong>”..<br />

Part – B (ITC of PAC unit)<br />

Sl.<br />

N<br />

o<br />

Description of Item<br />

Qty<br />

Basic price<br />

exclusive of all<br />

levies & charges<br />

Excise Duty +<br />

Cess/custom duty<br />

Sales TAX /VAT<br />

(see important<br />

note.3 below)<br />

Freight, Insurance,<br />

Packing and<br />

forwarding<br />

Any other levies<br />

paid/payable by<br />

agency<br />

Unit price inclusive<br />

of all levis & taxes<br />

(4+5+6+7+8)<br />

Duties & Taxes<br />

CENVAT-able on<br />

unit price<br />

Discount offered (if<br />

any)/ UNIT<br />

Net cost to <strong>BSNL</strong><br />

per set<br />

(9-10-11)<br />

Total Net cost to<br />

<strong>BSNL</strong> (col. 3 X 12)<br />

Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs.<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14<br />

1 Installation, testing and commissioning including Acceptance Testing of the above 7<br />

TR microprocessor controlled Precision Package AC unit in item no.1 of part A<br />

complete with Electronically commutated motor for evaporator blower, motorised<br />

VCD and all components, controls including air cooled condenser, i/c providing and<br />

fixing of suitable MS stand for the indoor unit to requisite floor as per the<br />

specifications complete as required.<br />

2 Providing and Laying of refrigerant pipe lines of size, for hot and cold circuits, leak and<br />

pressure testing of refrigerant lines, vacuumising, insulation of refrigerant piping<br />

arrangement and first charge of refrigerant for the AC system, complete as per<br />

specifications.<br />

a) 5/8” 10mtrs<br />

b) 7/8” 10mtrs<br />

inclusive of all levis<br />

& taxes - Discount<br />

offered if any<br />

( (col. 3 x ( col.9-<br />

3 Supplying and laying following sizes of PVC insulated PVC sheathed armoured U/G<br />

cable of 1.1KV grade, conforming to relevant IS on the wall/existing trench, existing<br />

cable trays i/c interconnections, end termination, gland earthing complete etc. as<br />

required<br />

10mtrs<br />

a) 4 Core 16 sq.mm Copper conductor U/G cable ( Main switch to PAC Unit) 10mtrs<br />

b) 3 Core 2.5 Sq.mm Copper conductor U/G Cable (PAC Indoor unit to Condenser unit) 15mtrs<br />

4 Providing plumbing work for condensate drain requirements i/c supply of GI pipes,<br />

pipe fittings such as bends, reducers, elbows, tees, unions, flanges etc for water<br />

connection of various components of the system.<br />

a) 25 mm ( Medium class ) GI pipe 2mtrs<br />

b) 40mm GI pipe. (Medium class) 2mtrs<br />

5 Providing and fixing 6 SWG dia G I wire in surface or in recess for loop earthing along<br />

with existing surface / recessed conduit / cable as required.<br />

30mtrs<br />

SDE (A&P) DNIT SW (E)<br />

63 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including 5 years Comprehensive AMC for various sites under<br />

<strong>Chennai</strong> <strong>Telephones</strong>”..<br />

Part –C: Comprehensive AMC<br />

SNo<br />

Description of Item<br />

Rate (Rs.) exclusive of<br />

Service tax<br />

Service Tax Applicable<br />

(Rs.)<br />

Total Rs. (4+5)<br />

COST PER UNIT<br />

CENVAT-able duties<br />

(sevice tax as per Col. 5)<br />

Net Cost to <strong>BSNL</strong> per set<br />

(Excluding Cenvatable<br />

duties and taxes)<br />

Rs. (col.6 - col.7)<br />

Qty<br />

(Nos)<br />

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)<br />

1<br />

Comprehensive maintenance of the 7TR<br />

microprocessor based High Precision<br />

package AC unit including all items covered<br />

under Part-A & Part –B as per the<br />

specifications/conditions of contract & as<br />

per the <strong>details</strong> given in relevant sections by<br />

deploying the required staff including<br />

specialized man power and by arranging<br />

required spares, refrigerant gas, tools and<br />

plant etc., to keep the AC unit & connected<br />

equipments operational upto the required<br />

standards complete as required.<br />

Note: operation of package AC unit is not<br />

included in this item<br />

a) 1 st Year (C1)(Covered under Guarantee)<br />

(See important note no 12 &13 below)<br />

b) 2 nd year (C2)<br />

C)3 rd year (C3)<br />

d) 4 th year (C4)<br />

e) 5 th year (C5)<br />

f) 6 th year (C6)<br />

---- Covered under Guarantee---<br />

1unit<br />

1 unit<br />

1 unit<br />

1 unit<br />

1 unit<br />

Total net cost to <strong>BSNL</strong> Rs.<br />

(col.3 x col. 8)<br />

Total amount Rs.<br />

(col.3 x col. 6)<br />

TOTAL Comprehensive AMC cost for 5<br />

years for 1 No of Pr AC unit<br />

1<br />

TOTAL for 22 Nos of Pr AC unit(Part-C) 22 Z1= Z2=<br />

SDE (A&P) DNIT SW (E)<br />

64 of 68


Name of Work:- SITC of 22 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including 5 years Comprehensive AMC for various sites under<br />

<strong>Chennai</strong> <strong>Telephones</strong>.<br />

Important note:<br />

1 The prices shall be quoted after taking into account the entire credit on inputs available under the MODVAT SCHEME introduced w.e.f. 1st March 1986 and further extended on more items till date”.<br />

2 The firm shall be responsible to see that E.D/ Customs Tariff Head/Service Tax etc., shown in the above columns are correct and<br />

CENVAT Credit for the amount shown above is admissible as per CENVAT Credit Rules 2004."<br />

3 Only Form C will be issued by <strong>BSNL</strong> on specific request for Part A (supply).<br />

4 Invoice /Bill should be preprinted with serial number and service tax / CST / VAT registration number. Invoice / Bill favouring <strong>BSNL</strong> shall be issued by the supplier / Contractor indicating the amount of<br />

customs duty, Excise duty, CST, VAT and Service Tax etc., with documentary proof to avail CENVAT credit.<br />

5 a)The evaluation and comparison of responsive bids shall be done on the basis of Net cost to <strong>BSNL</strong> (for Part-A & Part- B) + Net cost to <strong>BSNL</strong> for Part-C on the prices offered inclusive of duties and taxes<br />

(but excluding CENVAT –able duties & taxes), sales Tax, packing, forwarding, freight and insurance charges etc., as indicated in the price schedule. Octroi / Entry Taxes are not to be included in the<br />

composite price and hence the same will not be considered for the purpose of evaluation and comparison of responsive bids. However, octroi / entry taxes will be paid extra, as per actual wherever<br />

applicable on production of proof of payment / relevant invoices / documents.<br />

6 The rates for all items of work shall, unless clearly specified otherwise, include cost of all labour, materials and other inputs involved in the execution of the terms as specified in the scope of work.<br />

7 LOI shall be issued separately for Part - A, Part – B & Part - C items and separate agreements shall be framed for these items. The date of commencement of work for Part – C shall be reckoned after<br />

the date of successful initial Acceptance testing of the work.<br />

8 In case supplier / contractor submits exemption certificate from the commercial tax department, the WCT shall not be deducted at source (for part B & Part C only). WCT and Service Tax are not<br />

applicable for supply portion and as such WCT will not be deducted for supply portion.<br />

9 If any levy / duty is not payable or documentary proof is not produced, the amount for the same shall be deducted.<br />

10 Circuit length for liquid line and hot gas line included in respect of item no.2/Part B is defined as under :<br />

a) Circuit length for liquid line:<br />

Length of run measured in meters from liquid outlet connection of air cooled condenser to the thermostatic expansion valve. This includes horizontal and vertical runs. In case of multiple run of liquid<br />

line (for each package unit) for the purpose of circuit length measurement, only single linear measurement on average basis shall apply.<br />

b) Circuit length for hot gas line:<br />

Length of run measured in meters from compressor discharge head to air cooled condenser hot gas line. This includes horizontal and vertical runs. In case of multiple run of hot gas line (for each<br />

package unit) for the purpose of circuit length measurement, only single linear measurement on average basis shall apply.<br />

11 The hot gas refrigerant line shall be insulated inside conditioned area with high quality insulating material.<br />

12 Normally Package AC units are under guarantee for a period of one year after the date of commissioning. But even during the guarantee period the contractor shall be fully responsible for maintaining<br />

the services and to take whatever steps as maybe necessary including preventive and breakdown maintenance steps and servicing etc., as per the recommendations of the manufacturer. <strong>BSNL</strong> shall not<br />

pay anything extra on this account. Comprehensive Maintenance for 5 years commences after the date of expiry of guarantee period.<br />

13 Terms and conditions of AMC shall be applicable during guarantee period including imposition of penalties except that no charges for services provided under guarantee /extended guarantee shall be<br />

payable. Amount for penalties will be deducted from the pending payments against supplies or if that amount is insufficient then by invoking the PBG available against supply and ITC or AMC or from<br />

the charges due for AMC.<br />

Contractor Executive Engineer (E)<br />

SDE(A&P) DNIT SW(E)<br />

65 of 68


Name of Work:- SITC of 18 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC units including 5 years Comprehensive AMC for various sites under<br />

<strong>Chennai</strong> <strong>Telephones</strong>”..<br />

Abstract of cost<br />

Part-A Part –B & PART-C (for 22 nos.)<br />

Price inclusive of taxes and duties minus discount<br />

Final offered (net cost)<br />

Rs.<br />

Total for Part-A (col.14)=X2<br />

Total for Part-A (col.13)=X1<br />

Rs.<br />

Total for Part-B ( Col.10)=Y2 Rs. Total for Part-B( Col. 9 )=Y1 Rs.<br />

Total for Part-C ( Col.10)=Z2 Rs. Total for Part-C( Col.9)=Z1 Rs.<br />

Total Price D2=X2+Y2+Z2 Rs. Total Price D1=X1+Y1+Z1 Rs.<br />

General Note for PART – A, PART – B & PART – C<br />

1) The total value for bid evaluation excluding Cenvatable duties & taxes (Net cost to <strong>BSNL</strong>) = D3=X1+Y1+Z1<br />

Contractor EE (E)<br />

SDE (A&P) DNIT SW (E)<br />

66 of 68


Name of Work:- SITC of 18 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package<br />

AC units including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

LIST OF APPROVED MAKES- <strong>BSNL</strong> ELECTRICAL WING<br />

S. No .<br />

Item<br />

Makes<br />

1 Engine Ashok Leyland /Cummins/ Cater pillar /<br />

KOEL/ Volvo Penta / Mahindra &<br />

Mahindra (up to 40 KVA) /Escorts (up to<br />

30 KVA)/ Eicher (up to 20 KVA)<br />

2 Alternator(Brushless)<br />

Crompton Greaves (AL. series) / KEC /<br />

Leroy Somer / Stamford/Jyoti Ltd<br />

3<br />

4<br />

5<br />

6<br />

Battery (Lead Acid /<br />

Mntc. Free)<br />

HV Switchgear<br />

(Vacuum Circuit<br />

Breaker/SF6 )<br />

Transformer (Oil filled<br />

/ Dry type)<br />

a) Above 400 KVA<br />

b) Up to 400 KVA<br />

Air Circuit Breaker<br />

Amara Raja / AMCO / Farukawa / Hitachi<br />

/ Exide/ Prestolite / Standard<br />

Biecco Lawrie / Crompton / Kirloskar /<br />

MEI / Jyoti Ltd<br />

ABB / Schneider Electric /Andrew Yule /<br />

Bharat Bijlee / Crompton / EMCO /<br />

Kirloskar / Siemens<br />

In addition to above makes,<br />

Uttam/Automatic Electric<br />

Gear(AEG)/Patson/Rajasthan<br />

Transformer and Switchgear<br />

L&T/ Schneider Electric / Siemens<br />

7<br />

MCCB(Ics=Icu)<br />

L&T/ Schneider Electric / Siemens<br />

8<br />

9<br />

10<br />

SDF units<br />

Power Contactors<br />

Change Over Switch<br />

L&T/ Schneider Electric / Siemens/<br />

HPL/Havells<br />

L&T/ Schneider Electric / Siemens/<br />

Lakshmi(LECS)<br />

HPL / Havells / H-H Elcon<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

Intelligent APFC Relay<br />

Bus Bar Trunking/<br />

Sandwiched Bus Duct<br />

Power Capacitors<br />

(MPP/APP)<br />

Digital/ KWHr meter<br />

Cold shrink HT/LT<br />

Cable Joint<br />

Rubber Matting<br />

L&T/EPCOS(Siemens)/ Schneider Electric<br />

/ Neptune Ducati/Syntron/ABB<br />

Moeller/L&T/Schneider<br />

Electric/ABB/Legrand/Zeta<br />

L&T/EPCOS (Siemens)/ABB/Crompton/<br />

Schneider Electric/Neptune Ducati<br />

Schneider Electric/ AE/ Digitron / IMP/<br />

Meco / Rishabh /<br />

Universal/HPL/L&T/ABB<br />

Denson / 3M(M-Seal )/ Raychem<br />

ISI mark<br />

SDE (A&P) DNIT SW (E)<br />

67 of 68


Name of Work:- SITC of 18 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package<br />

AC units including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

27<br />

28<br />

29<br />

30<br />

31<br />

32<br />

33<br />

34<br />

35<br />

36<br />

37<br />

38<br />

39<br />

MCB/ lsolator<br />

/ELCB/RCCB/<br />

Distribution Board<br />

MS/ PVC Conduit<br />

Cable Tray<br />

HT/LT Cables PVC<br />

insulated<br />

copper conductor wire<br />

Centrifugal Pump<br />

Submersible Pump<br />

Motors<br />

Fresh Air Fans<br />

Starter<br />

Single Phase Preventer<br />

GI/MS Pipe<br />

Foot Valve Gate<br />

Valve<br />

Compressors<br />

Resin Bonded Glass<br />

wool<br />

Expanded Polystyrene<br />

Gauge<br />

Controls<br />

Fine Filters<br />

GI Sheet<br />

Heat Detector<br />

Ionization Detector<br />

Crompton / Havells / lndokopp / MDS<br />

Legrand/ L&T / Schneider Electric/ Siemens /<br />

Standard/ C&S/ABB/HPL<br />

ISI mark<br />

MEM/Bharti/Ratan/Slotco/Profab<br />

ISI mark ISI<br />

mark<br />

Amrut / BE / Beacon / Batliboi /<br />

Crompton / Jyoti / Kirloskar / KSB /<br />

Mather & platt / WASP/Grundfos<br />

Crompton/Amrut / BE / Calama /<br />

Kirloskar / KSB<br />

ABB/ Bharat Bijlee / Crompton Greaves /<br />

Schneider Electric / HBB / KEC /<br />

Siemens/Jyoti Ltd<br />

GE / Khaitan/Almonard/Crompton<br />

ABB / BCH / Schneider Electric / L&T /<br />

Siemens /<br />

L&T / Minilec / Siemens / Zerotrip<br />

ATC / ATL / BST / GSI / ITC / ITS / IIA /<br />

JST / Jindal /TTA / Tata/Zenith<br />

ISI mark<br />

Advance/Audco/Johnson<br />

Controls/Zoloto/Annapurna / Fountain /<br />

Kirloskar / Leader / Sant / Trishul<br />

Carrier/Emerson copeland/York/Danfoss<br />

(for chillers only)<br />

Fibre Glass / Pilkingston / UP Twiga<br />

BASF(India) Ltd.<br />

Feibig / H.Guru / Pricol<br />

FLICA / Honeywell / Indfoss / Penn-<br />

Danfoss / Ranco / Ranutrol / Sporland<br />

Anfiltra Effluent / ARW / Athlete/<br />

Airtake/ Dyna / Kirsloskar/ Puromatic/<br />

Purafill/ Purolator / Tenacity<br />

HSU Jindal / National / Nippon Denro /<br />

Sail / Tata<br />

Appollo / Chemtron/ Edward / Fenwal/<br />

Hochiki / Nitton /System Sensor/<br />

Wormald/Honeywell Essar/Notifier<br />

Appollo / Cerebrus / Edward/ /Fenwal /<br />

Hochiki / Nitton / System Sensor /<br />

Wormald<br />

SDE (A&P) DNIT SW (E)<br />

68 of 68


Name of Work:- SITC of 18 Nos 7TR Capacity (Sensible cooling) Microprocessor Controlled Precision package AC<br />

units including 5 years Comprehensive AMC for various sites under <strong>Chennai</strong> <strong>Telephones</strong>”..<br />

40<br />

41<br />

42<br />

43<br />

44<br />

Photo Electric Smoke<br />

Detector<br />

Fire Panel<br />

(Microprocessor<br />

based)<br />

Sprinkler/ Hose Reel &<br />

Hose Pipe<br />

Fire Extinguisher<br />

Lift<br />

Appollo / Cerebrus / Edward / Fenwal/<br />

Hochiki / Nitton / Wormald<br />

Agni Instruments / Agni Devices/ Aruna<br />

Agencies/ Carmel Sensor / Ravel<br />

Elect./Honeywell Essar/Notifier/Navin<br />

Systems<br />

ISI mark<br />

ISI mark<br />

OTIS, Kone, Mitsubishi , Schindler,Johnson<br />

SDE (A&P) DNIT SW (E)<br />

69 of 68

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!