Institutional Affiliate of American Congress on Surveying - CLSA
Institutional Affiliate of American Congress on Surveying - CLSA
Institutional Affiliate of American Congress on Surveying - CLSA
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
(c<strong>on</strong>tinued from Page 14)<br />
resented at this meeting and be<br />
prepared to <str<strong>on</strong>g>of</str<strong>on</strong>g>fer testim<strong>on</strong>y.<br />
The Board had for c<strong>on</strong>sidera-<br />
'ti<strong>on</strong> the staff review <str<strong>on</strong>g>of</str<strong>on</strong>g> the Title<br />
Act Branch <str<strong>on</strong>g>of</str<strong>on</strong>g> Chemical Engineering<br />
established in 1947 by the Legislature<br />
as a protected title, using<br />
the final recommended criteria<br />
developed last year, and according<br />
to Board schedule.<br />
The Board discussed the staff<br />
review in c<strong>on</strong>siderable detail and<br />
listened to testim<strong>on</strong>y from witnesses.<br />
This is the first <str<strong>on</strong>g>of</str<strong>on</strong>g> 13 preliminary<br />
reports to be compiled by<br />
the Board for reviewer comment<br />
during the next 3 to 4 m<strong>on</strong>ths, in<br />
resp<strong>on</strong>se to the recommendati<strong>on</strong>s<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> the "Schulman Report" <str<strong>on</strong>g>of</str<strong>on</strong>g> last<br />
year.<br />
Copies <str<strong>on</strong>g>of</str<strong>on</strong>g> this initial report will<br />
be distributed to the entire Board<br />
mailing list. Subsequent reports<br />
will be limited to those pers<strong>on</strong>s<br />
desiring to be placed <strong>on</strong> a special<br />
mailing list for future reports.<br />
The Board accepted the report<br />
and approved distributi<strong>on</strong>.<br />
Listening to the lengthy discussi<strong>on</strong>s<br />
by the Board, a number <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
impressi<strong>on</strong>s about the present<br />
Board's attitudes and c<strong>on</strong>cerns<br />
could be discerned:<br />
1. The Board's attitudes about<br />
the "grandfather" c<strong>on</strong>cept is very<br />
low. While "vested rights" were<br />
not specifically menti<strong>on</strong>ed, I feel<br />
that the two go hand-in-hand, <strong>on</strong>e<br />
cannot functi<strong>on</strong> without the<br />
other. Hence, <strong>on</strong>e must c<strong>on</strong>clude<br />
that "vested rights" are also law.<br />
2. An interesting effect <str<strong>on</strong>g>of</str<strong>on</strong>g> SB 2<br />
was also c<strong>on</strong>sidered by the Board.<br />
An ROE who let his license lapse,<br />
had requested reinstatement.<br />
This particular individual had<br />
specialized in land surveying. The<br />
Board had to decide whether<br />
reinstatement after January 1,<br />
1982 subjected him to the provisi<strong>on</strong>s<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> SB 2.<br />
3. The Board also had to decide<br />
whether the present Director <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
Cal-Trans should be disciplined<br />
for practicing civil engineering<br />
without a hcense. (The bridge<br />
width c<strong>on</strong>troversy in Mendocino<br />
County).<br />
After much discussi<strong>on</strong>, the<br />
Board accepted counsel's opini<strong>on</strong><br />
that the Board lacked jurisdicti<strong>on</strong>.<br />
5. The Board has amendments<br />
proposed for Board Rule 424<br />
(experience). Affects Secti<strong>on</strong>s<br />
8741 and 8742 <str<strong>on</strong>g>of</str<strong>on</strong>g> the Land Surveyors<br />
Act.<br />
D<br />
Incredihle*<br />
Basic system includes Northstar Advantage TM Computer with 64K<br />
RAM, IBM Setectric Keyboard, 640 x 240 bit mapped graphics, 2<br />
360K disk drives. CPM® compatible Z-80 processor, green phosphor<br />
screen, serial port for printer, NS-lOO 132 column dot matrix printer,<br />
all survey s<str<strong>on</strong>g>of</str<strong>on</strong>g>tware written in editable BASIC, startup supplies,<br />
business graphics package, diagnostic programs, 6 m<strong>on</strong>ths warranty,<br />
complete documentati<strong>on</strong>, a word processor, and screen plotting<br />
s<str<strong>on</strong>g>of</str<strong>on</strong>g>tware<br />
NorthSIa^"<br />
North Star Computers, Inc.<br />
SIERRA CYBERNETICS c<strong>on</strong>tinues its incredible<br />
advancement <str<strong>on</strong>g>of</str<strong>on</strong>g> the state <str<strong>on</strong>g>of</str<strong>on</strong>g> the computer art with the<br />
PIONEER II — with Incredible Graphics, more disk<br />
capacity, more memory, nati<strong>on</strong>al <strong>on</strong>-site service, and<br />
the best surveying and engineering programs in the<br />
industry. Naturally, this new system supports all <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />
Pi<strong>on</strong>eer I s<str<strong>on</strong>g>of</str<strong>on</strong>g>tware, and now allows you to plot maps<br />
and topo <strong>on</strong> the screen, with output to your plotter or<br />
printer, or to our remote plotter via ph<strong>on</strong>e lines.<br />
Incredible! Best <str<strong>on</strong>g>of</str<strong>on</strong>g> all, it costs far less than any other<br />
comparable system <strong>on</strong> the market. Complete systems,<br />
with all s<str<strong>on</strong>g>of</str<strong>on</strong>g>tware, now start at $7400 (far less if you<br />
already own a Pi<strong>on</strong>eer I}. Get the hot <strong>on</strong>e! Write or call<br />
now for literature. You'll be glad you did!<br />
Terence Pelersen<br />
Calfl License LS^ai 5<br />
cvBESnPtiS&<br />
105 Willow Valley Road<br />
Nevada City, CA 95959<br />
916/265-6439<br />
The California Surveyor — Spring 1982 Page 19