EU-SICHERHEITSDATENBLATT Dieselkraftstoff ... - Schmierstoffe
EU-SICHERHEITSDATENBLATT Dieselkraftstoff ... - Schmierstoffe
EU-SICHERHEITSDATENBLATT Dieselkraftstoff ... - Schmierstoffe
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Note: differentiated Industrial -SU3 Equipment cleaning CS39 Indoor, Daily; 1 - 4 Enclosed transfer, clear PROC8b<br />
dedicated and nondedicated<br />
facility for<br />
Dedicated facility CS81<br />
retain drainings in sealed discharging to/from<br />
and maintenance -<br />
hours; ambient temp. lines prior to decoupling; Dedicated<br />
equipment cleaning -<br />
storage pending vessels<br />
both identified by<br />
disposal. PPE<br />
ATIEL - combined in<br />
narrative as CS39<br />
Industrial -SU3 Equipment cleaning<br />
Indoor, Daily; 1 - 4 Collect waste and retain PROC8a<br />
and maintenance -Nondedicated<br />
facility<br />
storage pending to/from vessels<br />
hours; ambient temp. drainings in sealed Discharging<br />
(CS82)<br />
disposal. PPE<br />
Industrial -SU3 Material Storage CS67 Continuous; daily; 8hour Enclosed process; PROC1/2 Closed<br />
closed/semi-closed continuous process<br />
sampling point<br />
(sometimes with<br />
sampling)<br />
Use as binders and Industrial -SU3 Bulk transfers from CS3 Daily; 1 - 4 hours; Enclosed transfers, clear PROCs 1-3<br />
release agents<br />
storage to mixing<br />
ambient temp. lines prior to decoupling contained<br />
vessels<br />
processes<br />
Industrial -SU3 Transfers to mixing CS8 Daily; 15 mins - 1 hour; Pumped transfer from PROC8b<br />
vessels from drums<br />
ambient temp<br />
drum to holding tanks. Discharging<br />
to/from vessels<br />
Industrial -SU3 Mixing / blending of CS29 Daily; >4 hours Enclosed or ventilated PROC3 Closed<br />
foundry sands with<br />
mixing vessel<br />
batch process (with<br />
binder<br />
sampling)<br />
Industrial -SU3 Mixing / blending of CS30 Daily; >4 hours Enhanced general PROC4 Open<br />
foundry sands with<br />
ventilation<br />
batch process (with<br />
binder<br />
sampling)<br />
Industrial -SU3 Forming moulds from CS31 Daily; >4 hours, ambient PPE PROC14<br />
foundary sand<br />
temp<br />
Production by<br />
tabletting,<br />
compression,<br />
Combine in narrative Industrial -SU3 Emissions from casting CS32, CS108 Daily; 1 - 4 hours; Enhanced general PROC6 Open<br />
into moulds<br />
elevated temp.sufficient ventilation, PPE processing at<br />
to create fume<br />
elevated<br />
temperature<br />
Industrial -SU3 Emissions from casting CS32, CS108 Daily; 1 - 4 hours; Enhanced general PROC6 Open<br />
into moulds (vapour<br />
elevated temp.sufficient ventilation, PPE processing at<br />
phase)<br />
to create fume<br />
elevated<br />
temperature<br />
Combine in narrative Industrial -SU3 Applying release agent CS10, CS33 Daily; 1 - 4 hours; Enclosed or ventilated PROC7<br />
to moulds and<br />
ambient temp. production line. Application by<br />
shuttering<br />
Automation.<br />
spraying<br />
Industrial -SU3 Applying release agent CS10, CS33 Daily; 1 - 4 hours; Enclosed or ventilated PROC7<br />
to moulds and<br />
ambient temp. production line. Application by<br />
shuttering (vapour<br />
Automation.<br />
spraying<br />
phase)<br />
Industrial -SU3 Applying release agent CS13 Daily; 1 - 4 hours; PPE PROC10 Roller<br />
to moulds and<br />
ambient temp.<br />
application and<br />
shuttering<br />
brushing<br />
Combine in narrative Industrial -SU3 Applying release agent CS10, CS34 Daily; 1 - 4 hours; PPE, face mask PROC7<br />
to moulds and<br />
ambient temp.<br />
Application by<br />
shuttering<br />
spraying<br />
Industrial -SU3 Applying release agent CS10, CS34 Daily; 1 - 4 hours; PPE, face mask PROC7<br />
to moulds and<br />
ambient temp.<br />
Application by<br />
shuttering (vapours)<br />
spraying<br />
Industrial - maintenance of CS5 Daily; 1-4 hours, work methods, drain prior PROC8a<br />
SU10 equipment<br />
ambient<br />
to work, retain spills, Discharging<br />
gloves<br />
to/from vessels<br />
(non-dedicated)<br />
Industrial -SU3 Storage CS67 Daily; 8 hrs; ambient samples collected at PROC1/2 Closed<br />
temp;<br />
dedicated sample point continuous process<br />
(sometimes with<br />
li )<br />
Oil and gas field Industrial - SU3 Bulk transfers from tote CS14 Daily; 15 - 1 hour; Enclosed transfers, clear PROCs 1-3<br />
chemicals<br />
tanks and supply<br />
product temp (ambient). lines prior to decoupling contained<br />
vessels<br />
processes<br />
Industrial - SU3 Charge from drums CS45 Daily; 15 mins - 1 hour; Pumped transfer from PROC8b<br />
product temp (ambient) drum to holding tanks. Discharging<br />
to/from vessels<br />
(dedicated)<br />
Industrial - SU3 Drilling mud (re-) CS512 Daily; 1-4 hour; product Closed equipment, PROC3 Closed<br />
formulation<br />
temp (ambient); indoor enclosed or vented batch process with<br />
sampling points sampling<br />
Industrial - SU3 Drill floor operations CS513 Daily; 1-4 hour per PPE PROC4 Batch<br />
operator; product temp<br />
process with<br />
(ambient), outdoors<br />
exposure<br />
Combine Industrial - SU3 Operation of solids CS514 Daily; >4 hours; indoor; Local exhaust ventilation PROC4 Batch<br />
filtering equipment<br />
product temperature<br />
process with<br />
elevated temperature<br />
approx. 60 dC<br />
exposure<br />
> 4 hours daily;<br />
ambient temp.<br />
> 4 hours daily;<br />
ambient temp.<br />
daily; ambient<br />
temp.<br />
daily; ambient<br />
temp.<br />
daily; ambient<br />
temp.<br />
> 4 hours daily;<br />
ambient temp.<br />
> 4 hours daily;<br />
ambient temp.<br />
> 4 hours daily;<br />
ambient temp.<br />
> 4 hours daily;<br />
ambient temp.<br />
> 4 hours daily;<br />
ambient temp.<br />
> 4 hours daily;<br />
ambient temp.<br />
> 4 hours daily;<br />
ambient temp.<br />
> 4 hours; daily;<br />
ambient temp.<br />
> 4 hours daily;<br />
ambient temp.<br />
> 4 hours daily;<br />
ambient temp.<br />
1-4 hours,<br />
ambient temp.<br />
daily; ambient<br />
temp.<br />
daily; ambient<br />
temp.<br />
daily; ambient<br />
temp.<br />
> 4 hours daily;<br />
ambient temp.<br />
> 4 hours daily;<br />
ambient temp.<br />
> 4 hours; daily;<br />
elevated product<br />
temperature<br />
No LEV 5 80 1 SOPs assumed 13.71 90 1.37 0.01 0.47 0.49 Drain down system prior to equipment<br />
to offer<br />
break-in or maintenance E55 Good GV<br />
equivalent LEV<br />
E40 Transfer via enclosed lines E52<br />
effic shown<br />
Wear chemically resistant gloves<br />
(tested to EN374) PPE16 Retain drain<br />
downs in sealed storage pending<br />
disposal or for subsequent recycle.<br />
ENVT4<br />
Drain down system prior to equipment<br />
No LEV 5 80 1 SOPs assumed 13.71 90 1.37 0.01 0.47 0.49 to offer<br />
break-in or maintenance E55 Good GV<br />
equivalent LEV<br />
E40 Transfer via enclosed lines E52<br />
effic shown<br />
Wear chemically resistant gloves<br />
(tested to EN374) PPE16 Retain drain<br />
downs in sealed storage pending<br />
disposal or for subsequent recycle.<br />
ENVT4<br />
outdoor activity 0.5 0 0.5 0.14 0 0.14 0.01 0.05 0.06 Store substance within a closed<br />
system. E84 Transfer via enclosed<br />
lines. E52 Avoid dip sampling E42<br />
No LEV 3 0 3 1.37 0 1.37 0.04 0.47 0.52 Handle within contained systems E47<br />
Ensure material transfers are under<br />
containment or extract ventilation E66<br />
wear gloves PPE15 clear lines prior to<br />
decoupling E39 remote vent vapours<br />
ENVT17<br />
With LEV 5 0 5 6.86 80 1.37 0.07 0.47 0.55 Use drum pumps E53 Wear gloves<br />
(80%) PPE15 Avoid spillage on<br />
withdrawal C&H16 GV E40<br />
No LEV 3 0 3 1.37 0 1.37 0.04 0.47 0.52 No psecial measures EI18 Use GV<br />
E11 wear gloves PPE15 Provide<br />
extract ventilation to points where<br />
emissions occur E54<br />
No LEV 5 0 5 13.71 90 1.37 0.07 0.47 0.55 Provide GV E11 Wear gloves (90%)<br />
PPE16 Provide extract ventilation to<br />
points where emissions occur E54<br />
No LEV 5 0 5 3.43 80 0.69 0.07 0.24 0.31 Provide GV E11 Wear gloves (90%)<br />
PPE16 Provide extract ventilation to<br />
points where emissions occur E54<br />
With LEV 25 90 2.5 1.37 80 0.27 0.04 0.09 0.13 Wear gloves (80%) PPE15. Apply<br />
extract ventilation to emissions E60<br />
apply GV E11<br />
With LEV 5 90 0.5 1.37 0 1.37 0.07 0.47 0.54 Apply extract ventilation to emissions.<br />
E60 apply GV E11<br />
With LEV 20 90 2 Use of E57<br />
2.14 80 0.43 0.03 0.15 0.18 Carry out in a vented booth or<br />
equates to 90%<br />
extracted enclosure. E57 wear gloves<br />
PPE15 automate AP16 Segregate the<br />
activity away from other operations<br />
E63<br />
Apply ventilation or undertake in<br />
With LEV 100 90 10 Use of E57<br />
2.14 80 0.43 0.15 0.15 0.29 equates to 90%<br />
ventilated enclosure. E61 wear gloves<br />
PPE15 automate AP16<br />
With LEV 5 0 5 27.43 95 1.37 0.07 0.47 0.55 Apply extract ventilation to emissions.<br />
E54 Wear gloves (95%). PPE17 good<br />
GV E11<br />
No LEV 100 95 5 42.86 95 2.14 0.07 0.74 0.81 Good GV E11 Wear RPE (APF=20)<br />
APF=20 defines LEV value;<br />
and gloves (95%) PPE24, PPE23<br />
specific activity<br />
Segregate E63 Ensure operatives are<br />
training (0.85x)<br />
trained to minimise exposures EI19<br />
No LEV 100 95 5 APF=20 defines 42.86 95 2.14 0.07 0.74 0.81 Good GV E11 Wear RPE (APF=20)<br />
LEV value;<br />
and gloves (95%) PPE24, PPE23<br />
specific activity<br />
Segregate E63 Ensure operatives are<br />
training (0.85x)<br />
trained to minimise exposures EI19<br />
No LEV 5 0 5 13.71 90 1.37 0.07 0.47 0.55 SOP re drain downs.E65 Enclosed<br />
transfers E52 Wear gloves (90%)<br />
PPE16<br />
outdoor activity 0.5 0 0.5 0.14 0 0.14 0.01 0.05 0.06 Store substance within a closed<br />
system. E84 Avoid dip samples E42<br />
No LEV 3 0 3 1.37 0 1.37 0.04 0.47 0.52 Handle within contained systems E47<br />
Ensure material transfers are under<br />
containment or extract ventilation E66<br />
wear gloves PPE15 clear lines prior to<br />
decoupling E39 remote vent vapours<br />
ENVT17<br />
With LEV 5 0 5 6.86 80 1.37 0.07 0.47 0.55 Use drum pumps E53 Wear gloves<br />
(80%) PPE15 Avoid spillage on<br />
withdrawal C&H16 GV E40<br />
No LEV 3 0 3 1.37 0 1.37 0.04 0.47 0.52 No psecial measures EI18 Use GV<br />
E11 wear gloves PPE15 Handle<br />
substance within a predominantly<br />
closed system provided with extract<br />
ventilation E49<br />
No LEV 5 0 5 13.71 90 1.37 0.07 0.47 0.55 Use outdoors E69 Wear gloves (90%)<br />
PPE16 Wear suitable coveralls<br />
capable of preventing penetration of<br />
the substance PPE27 Wear rubber<br />
boots PPE28<br />
With LEV. 25 90 2.5 0.69 0 0.69 0.04 0.24 0.27 Provide the operation with a properly<br />
sited receiving hood E71. Recirculation<br />
of exhaust air is not<br />
recommended E80 Ensure the<br />
ventilation system is regularly<br />
maintained and tested (E74). Wear<br />
suitable gloves tested to EN374<br />
PPE15<br />
0