Industrial - operation of open CS16 Daily; >4 hours, ambient None. PROC 4 Use in > 4 hours; daily;<br />

SU10 equipment containing<br />

(product at 80oC)<br />

batch and other elevated temp.<br />

functional fluids at<br />

process<br />

elevated temperatures<br />

Industrial - operation of open CS16 Daily; >4 hours, ambient None. PROC 4 Use in > 4 hours; daily;<br />

SU10 equipment containing<br />

(product at 80oC)<br />

batch and other elevated temp.<br />

functional fluids at<br />

process<br />

elevated temperatures<br />

vapour phase<br />

Industrial - Re-work on off CS19 Daily; >4 hours, ambient work methods, drain prior PROC9 - Transfer 1-4 hours,<br />

SU10 specification articles<br />

to work, retain spills of chemicals into ambient temp.<br />

small containers<br />

Industrial - maintenance of CS5 Daily; 1-4 hours, work methods, drain prior PROC8a 1-4 hours,<br />

SU10 equipment<br />

ambient<br />

to work, retain spills, Discharging ambient temp.<br />

gloves<br />

to/from vessels<br />

(non-dedicated)<br />

Industrial -SU3 Storage CS67 Daily; 8 hrs; ambient samples collected at PROC1/2 Closed daily; ambient<br />

temp;<br />

dedicated sample point continuous process temp.<br />

(sometimes with<br />

li )<br />

Use in Explosive Professional - Bulk transfers from CS14 Daily; 1 - 4 hours; Enclosed transfers, clear PROC3 Closed 1-4 hours,<br />

manufacture and SU22 road tankers<br />

ambient temp. lines prior to decoupling batch process (with ambient temp.<br />

use<br />

sampling)<br />

Professional - Charge from drums CS8 Daily; 15 mins - 1 hour; Pumped transfer from PROC8a 1-4 hours,<br />

SU22<br />

ambient temp<br />

drum to holding tanks. Discharging ambient temp.<br />

to/from vessels<br />

Combine in narrative Professional - Mixing / blending CS23, CS108 Daily; 1 - 4 hours; Enclosed or ventilated PROC5 Mixing & 1-4 hours,<br />

SU22<br />

ambient temp. mixing vessel<br />

blending<br />

ambient temp.<br />

Professional - Mixing / blending CS23, CS108 Daily; 1 - 4 hours; Enclosed or ventilated PROC5 Mixing & 1-4 hours,<br />

SU22 (vapour phase)<br />

ambient temp. mixing vessel<br />

blendingg) ambient temp.<br />

Professional - Mixing / blending CS23, CS107 Daily; 1 - 4 hours; Enclosed or ventilated PROC3 Closed 1-4 hours,<br />

SU22 (closed system)<br />

ambient temp. mixing vessel<br />

batch process (with ambient temp.<br />

sampling)<br />

Professional - Bulk transfers of CS3 Daily; 15 - 1 hour; Enclosed transfers to PROC8b 4 hours; daily;<br />

SU10 transfers to/from<br />

ambient temp<br />

minimise spills<br />

ambient temp.<br />

storage e.g. IBCs, big<br />

bags<br />

Industrial - In-line weighing of CS91 Daily; 15 min - 1 hour; Enclosed activity PROCs 1, 2 > 4 hours; daily;<br />

SU10 additives<br />

ambient temp<br />

ambient temp.<br />

Industrial - small scale weighing of CS90 Daily; 15 min - 1 hour; LEV; minimise spillages; PROC9 1-4 hours,<br />

SU10 additives<br />

ambient temp<br />

operator training<br />

ambient temp.<br />

Combine in narrative Industrial - small scale mixing of CS92 Daily; 15 min - 1 hour; LEV; minimise spillages; PROCs 3, 4 > 4 hours; daily;<br />

SU10 additives<br />

ambient temp<br />

ambient temp.<br />

Industrial - batch pre-mixing of CS92 Daily; 1-4 hours; LEV; minimise spillages; PROC5 1-4 hours,<br />

SU10 additives<br />

ambient temp<br />

ambient temp.<br />

Industrial - transfer of additives to CS3 Daily; 15 min - 1 hour; Enclosed activity PROC 8b, 9 1-4 hours,<br />

SU10 calendars and<br />

ambient temp<br />

ambient temp.<br />

Banburys<br />

Combine in narrative Industrial - Calendaring activities CS64 Daily; >4 hours, LEV; minimise area/size PROC6 - > 4 hours; daily;<br />

SU10 (incl banbury)<br />

elevated temperature of openings<br />

Calendering ambient temp.<br />

operations<br />

Industrial - Calendaring activities CS64 Daily; >4 hours, LEV; minimise area/size PROC6 - > 4 hours; daily;<br />

SU10 (vapour phase)<br />

elevated temperature of openings<br />

Calendering ambient temp.<br />

operations<br />

Industrial - Pressing raw rubber CS73 Daily; 1-4 hours; Good GV PROC 14 - > 4 hours; daily;<br />

SU10 blanks<br />

ambient temp<br />

Production of ambient temp.<br />

preparations or<br />

articles by<br />

tabletting,<br />

compression,<br />

extrusion,<br />

pelletisation<br />

With LEV 25 0.69<br />

With LEV 20 0.69<br />

No LEV 5 6.86<br />

No LEV 5 13.71<br />

outdoor activity 0.5 0.14<br />

No LEV 1 0.34<br />

No LEV 5 13.71<br />

No LEV 5 6.86<br />

No LEV 10 4.12<br />

No LEV 1 0.34<br />

With LEV 5 6.86<br />

No LEV 5 6.86<br />

No LEV 5 13.71<br />

No LEV 5 13.71<br />

outdoor activity 1 1.37<br />

No LEV 0.5 1.37<br />

No LEV 5 6.86<br />

No LEV 0.5 6.86<br />

No LEV 5 6.86<br />

No LEV 5 6.86<br />

No LEV 5 6.86<br />

With LEV 5 0.69<br />

With LEV 5 0.69<br />

With LEV 50 0.69<br />

No LEV 1 3.43