24 Cabling <strong>and</strong> Services<br />

There are numerous underground services throughout the University including electrical cables, pipes,<br />

gas <strong>and</strong> telecommunication services. Check <strong>for</strong> locations be<strong>for</strong>e you dig. The University has maps<br />

documenting service locations throughout University sites. The relevant CQUniversity Project Officer<br />

must be contacted prior to conducting any excavation or other work, which could potentially damage<br />

services <strong>and</strong> an Excavation, Trenching & Breaking Ground Permit obtained.<br />

25 Confined Spaces<br />

When working in confined spaces the provisions of the legislation are to be complied with by the<br />

Contractor <strong>and</strong> employees. A permit <strong>for</strong> Confined Space entry is to be obtained from the CQUniversity<br />

Project Officer.<br />

Where working in enclosed areas, care should be taken to ventilate the area well if petrol or diesel motor<br />

driven equipment is being used.<br />

The Contractor must ensure that fume evacuation, airflow <strong>and</strong> exchanges of air are all maintained as<br />

necessary. Confined space gas detection equipment must be used to test the environment.<br />

26 Housekeeping<br />

Rubbish<br />

Rubbish must be managed in accordance with <strong>Environment</strong>al Protection Act <strong>and</strong> Local Council By-laws.<br />

Under no circumstances are contractors to dump rubbish on vacant l<strong>and</strong> on the campus.<br />

The disposal <strong>and</strong> washing out of excess concrete from trucks is not permitted on site.<br />

Paint contractors shall not dispose of paints or clean painting equipment on University grounds.<br />

Site Tidiness<br />

The work-site <strong>and</strong> surrounding area should be kept clean <strong>and</strong> tidy <strong>and</strong> any safety or fire hazards removed<br />

promptly (e.g. oily rags, flammable materials <strong>and</strong> garbage).<br />

Keep in mind other safety actions such as replacing lids <strong>and</strong> caps on containers, wiping up spills, removing<br />

or bending over nails or bolts <strong>and</strong> removing other dangerous protruding objects progressively.<br />

working doc - contractor h<strong>and</strong>book v3 17082009 final.docx Updated August 2009 Page 14