29.03.2014 Views

LOK SEVA KENDRA MAWAI - Mandla

LOK SEVA KENDRA MAWAI - Mandla

LOK SEVA KENDRA MAWAI - Mandla

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

. Keep LokSeva Kendra building and facilities in accordance with the<br />

specifications and standards and for the use as specified herein<br />

c. Manage, operate and maintain the LokSeva Kendra<br />

d. Receive and process application from residents of area of jurisdiction of the<br />

LSK for services notified under section 3 of M.P. LokSewaonKePradan Ki<br />

Guarantee Adhiniyam 2010 and notified by the Secretary from time to time<br />

e. Demand and collect application fee from the applicants and retain process fee<br />

f. Perform and fulfill all of the Operator's obligations in accordance with this<br />

RFP<br />

7.3. The operator shall not assign, transfer or sublet or create any lien or encumbrance<br />

or the Right to operate hereby granted on the whole or any part of the LokSeva<br />

Kendra or LokSeva Kendra building and facilities or site or transfer, lease or part<br />

possession.<br />

8. IMPOSITION OF PENALTY:<br />

The secretary:<br />

a. May on the report of designated officer/first appeal officer / second appellate<br />

authority impose a penalty not exceeding Rs 250/ for each such application which<br />

was found to have been carelessly prepared<br />

b. May on the report of any designated officer/first appeal officer/ second appellate<br />

authority impose a penalty not exceeding Rs 250/ per day for each case in which<br />

undue delay was made by the operator in providing hard copy of the applications to<br />

the authorized messenger under clause 3.2.1(k)and 3.2.2(i)<br />

c. May on the complaint of an applicant impose a penalty not exceeding Rs 250/ per<br />

day for each case in which undue delay was made by the operator in delivering the<br />

order/compliance report to the applicant under clause 3.2.3(f) and 3.2.3(g)<br />

d. May on the complaint of applicants impose such penalty not exceeding Rs250/ in<br />

each case, as the Secretary may consider desirable, in which the operator has shown<br />

inability to receive applications due to lack of electric supply and/ or manpower<br />

However, before imposing any penalty the operator will be given due opportunity of<br />

hearing.<br />

Model RFP Document for the use of District e‐Gov Society Prepared by DPSM GOMP<br />

26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!