27.03.2014 Views

SUPER DIGITAL

SUPER DIGITAL

SUPER DIGITAL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6. Defrost control<br />

In heating operation, defrost operation is performed when TE sensor temperature satisfies any condition<br />

in A zone to C zone.<br />

‚ The defrost operation is immediately finished if TE sensor temperature has become 12°C or more, or it<br />

also is finished when condition of 5°C < TE < 12°C has continued for 80 seconds.<br />

The defrost operation is also finished when defrost operation has continued for 15 minutes even if TE<br />

sensor temperature has become 5°C or lower.<br />

ƒ After defrost operation has finished, the compressor and the outdoor fan start heating operation after<br />

stopped for approx. 40 seconds.<br />

Start of heating operation<br />

0 10 15 29 35 [min.]<br />

TE [˚C]<br />

–4<br />

–6<br />

A zone<br />

–10<br />

B zone<br />

D zone<br />

–25<br />

*<br />

C zone<br />

* The minimum TE value between 10 and 15 minutes after heating operation has started is stored in memory as TE0.<br />

A zone<br />

B zone<br />

C zone<br />

Defrost operation is performed in this zone when TE0-TE > 2.5 continued for 20 seconds.<br />

Defrost operation is performed in this zone when TE0-TE > 3 continued for 20 seconds.<br />

Defrost operation is performed when this zone continued for 20 seconds.<br />

– 86 –

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!