SUPER DIGITAL
SUPER DIGITAL
SUPER DIGITAL
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
10. Defrost control<br />
1) In heating operation, defrost operation is performed when TE sensor satisfies any condition in A zone to<br />
D zone.<br />
2) During defrosting operation, it finishes if TE sensor continued 12°C or higher for 3 seconds or continued<br />
7°C ≤ TE < 12°C for 1 minute.<br />
The defrost operation also finishes when it continued for 10 minutes even if TE sensor temperature was<br />
7°C or lower.<br />
3) After defrost operation was reset, the compressor stopped for approx. 40 seconds and then the heating<br />
operation starts.<br />
Start of heating operation<br />
TE [˚C]<br />
0 10 15 39 45 55 d [min.]<br />
–2<br />
–5<br />
–10<br />
A zone<br />
B zone<br />
D zone<br />
–23<br />
∗<br />
C zone<br />
∗ The minimum TE value and To value between 10 and 15 minutes after heating operation has started<br />
are stored in memory as TE0 and To0, respectively.<br />
A zone<br />
B zone<br />
C zone<br />
D zone<br />
In normal To<br />
In abnormal To<br />
When status (TE0 – TE) – (To0 – To) ≥ 3°C When status (TE0 – TE) ≥ 3°C<br />
continued for 20 seconds<br />
continued for 20 seconds<br />
When status (TE0 – TE) – (To0 – To) ≥ 2°C When status (TE0 – TE) ≥ 2°C<br />
continued for 20 seconds<br />
continued for 20 seconds<br />
When status (TE ≤ –23°C) continued for 20 seconds<br />
When compressor operation status of TE < –2°C is calculated by d portion<br />
4) The time of above d can be changed by<br />
exchanging jumper [J805] and [J806] of the<br />
outdoor control P.C. board.<br />
(Setting at shipment: 150 minutes)<br />
J805<br />
J806<br />
¡ ¡<br />
¡ ×<br />
× ¡<br />
× ×<br />
d<br />
150 minutes<br />
Setting at shipment<br />
90 minutes<br />
60 minutes<br />
30 minutes<br />
¡ : Short circuit, × : Open<br />
– 82 –