27.03.2014 Views

SUPER DIGITAL

SUPER DIGITAL

SUPER DIGITAL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

No.<br />

Part name<br />

Procedure<br />

Remarks<br />

4<br />

Replacement of<br />

electric parts<br />

(Continued)<br />

2. Reactor<br />

1) Carry out work of 1 of 1 .<br />

2) Remove the reactor lead connected to<br />

the control P.C. board.<br />

CN05 White, CN06 White<br />

3) Cut the bundling band which bundled<br />

the compressor lead and fan motor<br />

lead.<br />

4) Remove the reactor.<br />

(Trust B tight screw, Ø4 × 6, 2 pcs.)<br />

5) Replace the reactor with a new one.<br />

Bundling band<br />

(Compressor lead, Reactor lead)<br />

Control P.C. board<br />

Reactor lead<br />

NOTE :<br />

Be sure to bundle the removed bundling<br />

band with the bundling band on the<br />

market.<br />

Be careful so that the fan motor lead<br />

does not come to contact with the<br />

reactor body.<br />

Reactor lead<br />

Reactor body<br />

Bundling band<br />

(Compressor lead, Reactor lead)<br />

Fan motor lead<br />

Bundling band<br />

(Fan motor lead, Reactor lead)<br />

– 199 –

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!