27.03.2014 Views

SUPER DIGITAL

SUPER DIGITAL

SUPER DIGITAL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

No.<br />

Part name<br />

Procedure<br />

Remarks<br />

11<br />

Heat<br />

exchanger<br />

1. Detachment<br />

1) Recover the refrigerant gas.<br />

2) Carry out work of item 1 of 10 .<br />

3) Remove refrigerant pipe at indoor unit side.<br />

4) Remove the fixing screws and then<br />

remove the piping cover. (Ø4 ×10, 3 pcs.)<br />

5) Remove the drain hose from the drain<br />

pump and remove the fixing screws to<br />

remove the drain pump stand.<br />

(Ø4 ×8, 3 pcs.)<br />

6) While pushing the heat exchanger, remove<br />

the fixing band, fixing screws and the heat<br />

exchanger. (Ø4 ×8, 3 pcs.)<br />

Fixing screws (Ø4 ×10)<br />

Piping cover<br />

2. Attachment<br />

1) Mount the heat exchanger with the fixing<br />

band and the fixing screws. (Ø4 ×8, 3 pcs.)<br />

2) Fix the parts as before in order of drain<br />

pump stand → piping cover.<br />

3) Connect the refrigerant pipe as before and<br />

then apply vacuuming.<br />

4) Following to work of item 2 of 10 , attach<br />

the parts as before.<br />

Drain pump stand<br />

Fixing screws<br />

(Ø4 ×10)<br />

Fixing screws<br />

(Ø4 ×10)<br />

Fixing band<br />

Fixing screw<br />

Fixing band<br />

Heat exchanger<br />

– 190 –

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!