THE ESTIMATED COST OF FUTURE DEVELOPMENTS<br />

Project mil € year<br />

Paldiski – Kiili pipeline<br />

DN700 PN55, 47 km<br />

28 2014-2016<br />

Gas Metering Station (Paldiski) 3<br />

2015-2016<br />

Loo GRS rek. (55/38) 4<br />

2015-2016<br />

Balticconnector, 80 km 100 ?<br />

Compressor station (Paldiski) 22 ?<br />

Karksi GMS (reverse metering) 5 ?<br />

Tallinn-Kohtla-Järve-Narva pipeline<br />

(200 km) and 10 GRS<br />

Sum: 317<br />

EU grants … % ?<br />

155 2015-2022