Mr Sergei Jefimov - Konkurentsiamet
Mr Sergei Jefimov - Konkurentsiamet
Mr Sergei Jefimov - Konkurentsiamet
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
KIILI-PALDISKI TRANSMISSION PIPELINE<br />
Started in 2004 by Eesti Gaas as the underground<br />
part of the Balticconnector project.<br />
New cities, Keila and Paldiski, and planned Paldiski<br />
LNG terminal would be connected to gas system.<br />
Currently we are carrying out a planning procedure,<br />
necessary for the construction of Kiili — Paldiski<br />
transmission pipeline.