LINE VALVES STATIONS 15 new LVS were built and 11 existing LVS were reconstructed
ESTONIA - LATVIA CONNECTION before Karksi GMS new bypass line valve station after
- Page 1 and 2: ESTONIAN GAS SUPPLY SITUATION 11.01
- Page 3 and 4: 1. HISTORY REVIEW 1-st of November
- Page 5 and 6: AS EG VÕRGUTEENUS AS EG Võrgutee
- Page 7 and 8: ESTONIAN GAS SUPPLY SYSTEM CAPACITY
- Page 9 and 10: Total peak load 1000 m 3 per Year d
- Page 11 and 12: GAS SUPPLY SCHEME FROM NOVEMBER TO
- Page 13 and 14: SUPPLY DEPENDS ON THE INLET GAS PRE
- Page 15 and 16: 3. INVESTMENTS IN GAS SYSTEM FROM 2
- Page 17: PERFORMANCE OF REPAIR WORK In perio
- Page 21 and 22: 4. FUTURE DEVELOPMENT PLANS Baltic
- Page 23 and 24: KIILI-PALDISKI TRANSMISSION PIPELIN
- Page 25 and 26: THE ESTIMATED COST OF FUTURE DEVELO
- Page 27 and 28: PALDISKI AND MUUGA LNG TERMINALS To
- Page 29 and 30: LNG FOR SECURITY OF SUPPLY Only wi
- Page 31 and 32: TARIFFS FROM 01.07.2009 Pressure
- Page 33 and 34: GAS CONSUMPTION IN ESTONIA The over
- Page 35 and 36: WHATS HAPPENING WITH EG VÕRGUTEENU
- Page 37 and 38: NEWCO FROM 01.01.2015 A NewCo need
- Page 39 and 40: UNBUNDLING STRATEGY - FIRSTLY ITO
- Page 41: THANKS FOR YOUR ATTENTION ! Sergei
LINE VALVES STATIONS<br />
15 new LVS were<br />
built and<br />
11 existing LVS<br />
were reconstructed