Ordinary Meeting ong>ofong> Council - 26 April 2005 2 / 24 40 Clissold Rd, Wahroonga Item 2 DA1669/03 18 April 2005 b) A copy ong>ofong> the works-as-executed drawing ong>ofong> the as-built on-site detention/retention system, and c) The Engineer’s certification ong>ofong> the as-built system. This condition is required so Council may maintain its database ong>ofong> as-constructed on-site song>toong>rmwater detention systems, and also applies if the Principal Certifying Authority (PCA) is not the Council. 122. Prior ong>toong> issue ong>ofong> an Occupation Certificate the approved road, footpath and/or drainage works must ong>beong> completed in the road reserve. The works shall ong>beong> completed in accordance with the Council approved Roads Act 1993 drawings, conditions and specifications. The works must ong>beong> supervised by the applicant’s designing engineer and the works shall ong>beong> completed and approved in full ong>toong> the satisfaction ong>ofong> Council’s Engineers. The supervising consulting engineer is ong>toong> provide certification upon completion that the works were constructed in accordance with the Council approved drawings. The works are also ong>toong> ong>beong> subject ong>toong> inspection by Council at the hold points noted on the approved drawings. Any conditions attached ong>toong> the approved drawings for these works must ong>beong> met in full. 123. Prior ong>toong> issue ong>ofong> an Occupation Certificate the Section 73 Sydney Water compliance certificate must ong>beong> obtained and submitted ong>toong> the Principal Certifying Authority (PCA). 124. Prior ong>toong> issue ong>ofong> an Occupation Certificate (and at the completion ong>ofong> works), the applicant shall submit ong>toong> the Principal Certifying Authority (PCA) written certification from a suitably qualified and experienced traffic/civil engineer, that: a) The dimensions ong>ofong> each as-constructed private carparking space meets the dimension requirements ong>ofong> the Seniors Living SEPP (as last amended), and b) The as-constructed carpark complies with the approved Construction Certificate plans, and c) The vehicular headroom requirements ong>ofong>: − the Seniors Living SEPP (as last amended) for accessible parking spaces, and − − Australian Standard 2890.1 - “Off-street car parking”, and 2.44m height clearance for waste collection trucks (DCP 40) are met from the public street inong>toong> and within the applicable areas ong>ofong> the basement carpark, and d) The gradients ong>ofong> the constructed access driveway from the public street ong>toong> the basement carpark are in accordance with AS2890.1 and will not result in the scraping ong>ofong> the underside ong>ofong> cars. e) No doors or gates have ong>beong>en provided in the access driveways ong>toong> the basement carpark, which would prevent unrestricted access for internal garbage collection from the basement garbage song>toong>rage area. The certifying engineer shall carry out a site inspection and measure each carspace in order ong>toong> satisfy this condition. 125. Prior ong>toong> issue ong>ofong> an Occupation Certificate, Certification and a Works-as-Executed (WAE) plan, in relation ong>toong> the as-built on-site detention are ong>toong> ong>beong> submitted ong>toong> the Principal Certifying Authority (PCA) for approval. Certification is ong>toong> ong>beong> provided by a suitably qualified consulting civil/hydraulic engineer and the WAE plan is ong>toong> ong>beong> prepared by a registered surveyor. The certificate is ong>toong> specifically acknowledge compliance ong>ofong> the on-site detention system with the approved Construction Certificate plans and also compliance with the design N:\050426-OMC-SR-03119-40 CLISSOLD ROAD WAHROONG.doc/cotong>toong> /24

Ordinary Meeting ong>ofong> Council - 26 April 2005 2 / 25 40 Clissold Rd, Wahroonga Item 2 DA1669/03 18 April 2005 requirements ong>ofong> appendix 5 in Councils Water Management DCP 47 - “Design ong>ofong> on-site detention systems”. The Works-as-Executed details shall ong>beong> marked in red on the approved Construction Certificate design for the on-site detention system, and shall specifically include: − As constructed levels in comparison ong>toong> design levels − As built location ong>ofong> all detention devices on the property (plan view) and distances ong>toong> nearest adjacent boundaries, buildings and easements − As built locations ong>ofong> all pits and grates in the detention system, including dimensions. − The size ong>ofong> the orifice or pipe control fitted. − Dimensions ong>ofong> the discharge control pit and access grates − The achieved capacity ong>ofong> the detention song>toong>rage and derivative calculation. − The maximum depth ong>ofong> song>toong>rage over the outlet control. − Top water levels ong>ofong> song>toong>rage areas and RL’s at overflow point(s) 126. Prior ong>toong> issue ong>ofong> an Occupation Certificate (and at the completion ong>ofong> works), the applicant shall submit certification from a consulting civil/hydraulic engineer ong>toong> the Principal Certifying Authority (PCA), that: a) Construction ong>ofong> the song>toong>rmwater drainage system (including but not limited ong>toong> gutters, downpipes, pits, joints, flushing facilities and all ancillary plumbing) has ong>beong>en carried out by a licensed plumbing contracong>toong>r, and b) The works have ong>beong>en completed in accordance with the approved Construction Certificate drainage plans and the Plumbing and Drainage Code AS3500.3.2, and c) All enclosed floor areas, including habitable and garage floor levels, are safeguarded from outside song>toong>rmwater runong>ofong>f ingress by suitable differences in finished levels, gradings and provision ong>ofong> song>toong>rmwater collection devices. A Works-as-Executed (WAE) drawing ong>ofong> the property song>toong>rmwater drainage system is ong>toong> ong>beong> prepared by a registered surveyor and submitted ong>toong> the Principal Certifying Authority (PCA) prior ong>toong> occupation, issue ong>ofong> an Occupation Certificate or issue ong>ofong> the Final Compliance Certificate. The WAE plan shall show the following as built details, marked in red on the approved construction certificate song>toong>rmwater drawings: a) As built reduced surface and invert levels for all drainage pits and connection points, including the on-site detention system. b) Orifice details. c) As built reduced level(s) at the approved point ong>ofong> discharge ong>toong> the public drainage system. d) Gradients ong>ofong> drainage lines, materials and dimensions. 127. The creation ong>ofong> a Restriction-on-Use under the Conveyancing Act, prior ong>toong> the issue ong>ofong> an Occupation Certificate, restricting the occupation ong>ofong> the premises ong>toong>: a) Seniors and those with a disability as defined in the State Environmental Planning Policy for ‘Seniors Living’. b) People who live with such people as defined in (a) above. c) Staff employed ong>toong> assist in the administration ong>ofong> and provision ong>ofong> services ong>toong> housing provided in this development. N:\050426-OMC-SR-03119-40 CLISSOLD ROAD WAHROONG.doc/cotong>toong> /25

Ordinary Meeting <str<strong>on</strong>g>of</str<strong>on</strong>g> Council - <strong>26</strong> April <strong>2005</strong> 2 / 25<br />

40 Clissold Rd, Wahro<strong>on</strong>ga<br />

Item 2<br />

DA1669/03<br />

18 April <strong>2005</strong><br />

requirements <str<strong>on</strong>g>of</str<strong>on</strong>g> appendix 5 in Councils W<strong>at</strong>er Management DCP 47 - “Design <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>on</strong>-site<br />

detenti<strong>on</strong> systems”. The Works-as-Executed details shall <str<strong>on</strong>g>be</str<strong>on</strong>g> marked in red <strong>on</strong> the approved<br />

C<strong>on</strong>structi<strong>on</strong> Certific<strong>at</strong>e design for the <strong>on</strong>-site detenti<strong>on</strong> system, and shall specifically include:<br />

− As c<strong>on</strong>structed levels in comparis<strong>on</strong> <str<strong>on</strong>g>to</str<strong>on</strong>g> design levels<br />

− As built loc<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> all detenti<strong>on</strong> devices <strong>on</strong> the property (plan view) and distances <str<strong>on</strong>g>to</str<strong>on</strong>g><br />

nearest adjacent boundaries, buildings and easements<br />

− As built loc<strong>at</strong>i<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> all pits and gr<strong>at</strong>es in the detenti<strong>on</strong> system, including dimensi<strong>on</strong>s.<br />

− The size <str<strong>on</strong>g>of</str<strong>on</strong>g> the orifice or pipe c<strong>on</strong>trol fitted.<br />

− Dimensi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> the discharge c<strong>on</strong>trol pit and access gr<strong>at</strong>es<br />

− The achieved capacity <str<strong>on</strong>g>of</str<strong>on</strong>g> the detenti<strong>on</strong> s<str<strong>on</strong>g>to</str<strong>on</strong>g>rage and deriv<strong>at</strong>ive calcul<strong>at</strong>i<strong>on</strong>.<br />

− The maximum depth <str<strong>on</strong>g>of</str<strong>on</strong>g> s<str<strong>on</strong>g>to</str<strong>on</strong>g>rage over the outlet c<strong>on</strong>trol.<br />

− Top w<strong>at</strong>er levels <str<strong>on</strong>g>of</str<strong>on</strong>g> s<str<strong>on</strong>g>to</str<strong>on</strong>g>rage areas and RL’s <strong>at</strong> overflow point(s)<br />

1<strong>26</strong>. Prior <str<strong>on</strong>g>to</str<strong>on</strong>g> issue <str<strong>on</strong>g>of</str<strong>on</strong>g> an Occup<strong>at</strong>i<strong>on</strong> Certific<strong>at</strong>e (and <strong>at</strong> the completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> works), the applicant<br />

shall submit certific<strong>at</strong>i<strong>on</strong> from a c<strong>on</strong>sulting civil/hydraulic engineer <str<strong>on</strong>g>to</str<strong>on</strong>g> the Principal Certifying<br />

Authority (PCA), th<strong>at</strong>:<br />

a) C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er drainage system (including but not limited <str<strong>on</strong>g>to</str<strong>on</strong>g> gutters,<br />

downpipes, pits, joints, flushing facilities and all ancillary plumbing) has <str<strong>on</strong>g>be</str<strong>on</strong>g>en carried<br />

out by a licensed plumbing c<strong>on</strong>trac<str<strong>on</strong>g>to</str<strong>on</strong>g>r, and<br />

b) The works have <str<strong>on</strong>g>be</str<strong>on</strong>g>en completed in accordance with the approved C<strong>on</strong>structi<strong>on</strong><br />

Certific<strong>at</strong>e drainage plans and the Plumbing and Drainage Code AS3500.3.2, and<br />

c) All enclosed floor areas, including habitable and garage floor levels, are safeguarded<br />

from outside s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er run<str<strong>on</strong>g>of</str<strong>on</strong>g>f ingress by suitable differences in finished levels,<br />

gradings and provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er collecti<strong>on</strong> devices.<br />

A Works-as-Executed (WAE) drawing <str<strong>on</strong>g>of</str<strong>on</strong>g> the property s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er drainage system is <str<strong>on</strong>g>to</str<strong>on</strong>g> <str<strong>on</strong>g>be</str<strong>on</strong>g><br />

prepared by a registered surveyor and submitted <str<strong>on</strong>g>to</str<strong>on</strong>g> the Principal Certifying Authority (PCA)<br />

prior <str<strong>on</strong>g>to</str<strong>on</strong>g> occup<strong>at</strong>i<strong>on</strong>, issue <str<strong>on</strong>g>of</str<strong>on</strong>g> an Occup<strong>at</strong>i<strong>on</strong> Certific<strong>at</strong>e or issue <str<strong>on</strong>g>of</str<strong>on</strong>g> the Final Compliance<br />

Certific<strong>at</strong>e. The WAE plan shall show the following as built details, marked in red <strong>on</strong> the<br />

approved c<strong>on</strong>structi<strong>on</strong> certific<strong>at</strong>e s<str<strong>on</strong>g>to</str<strong>on</strong>g>rmw<strong>at</strong>er drawings:<br />

a) As built reduced surface and invert levels for all drainage pits and c<strong>on</strong>necti<strong>on</strong> points,<br />

including the <strong>on</strong>-site detenti<strong>on</strong> system.<br />

b) Orifice details.<br />

c) As built reduced level(s) <strong>at</strong> the approved point <str<strong>on</strong>g>of</str<strong>on</strong>g> discharge <str<strong>on</strong>g>to</str<strong>on</strong>g> the public drainage<br />

system.<br />

d) Gradients <str<strong>on</strong>g>of</str<strong>on</strong>g> drainage lines, m<strong>at</strong>erials and dimensi<strong>on</strong>s.<br />

127. The cre<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a Restricti<strong>on</strong>-<strong>on</strong>-Use under the C<strong>on</strong>veyancing Act, prior <str<strong>on</strong>g>to</str<strong>on</strong>g> the issue <str<strong>on</strong>g>of</str<strong>on</strong>g> an<br />

Occup<strong>at</strong>i<strong>on</strong> Certific<strong>at</strong>e, restricting the occup<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the premises <str<strong>on</strong>g>to</str<strong>on</strong>g>:<br />

a) Seniors and those with a disability as defined in the St<strong>at</strong>e Envir<strong>on</strong>mental Planning<br />

Policy for ‘Seniors Living’.<br />

b) People who live with such people as defined in (a) above.<br />

c) Staff employed <str<strong>on</strong>g>to</str<strong>on</strong>g> assist in the administr<strong>at</strong>i<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> and provisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> services <str<strong>on</strong>g>to</str<strong>on</strong>g> housing<br />

provided in this development.<br />

N:\0504<strong>26</strong>-OMC-SR-03119-40 CLISSOLD ROAD WAHROONG.doc/cot<str<strong>on</strong>g>to</str<strong>on</strong>g> /25